GENERAL NOTES
<br />PROJECT DATA
<br />CONSTRUCTION
<br />1. ALL CONSTRUCTION SHALL COMPLY WITH THE 2015 WTERNATIONAL au&DJmG CODE AS ADOPTED BY
<br />THE CITYOFEVERET7, STATE REGULATIONS FOR BARRIER FREE DESIGN, WA S7ATE ENERGY CODE,
<br />AND ALL APPLICABLE LOCAL CODES, ORDINANCES, AND STANDARDS. IN CASE OF ANY CONFLICT WHERE
<br />THE METHODS OR STANDARDS OF INSTALLATION OF THE -MATERIALS SPECIFIED DO NOT EQUAL OR
<br />EXCEED THE REQUIREMENTS OF THE LAWS OR ORDINANCES, THE LAWS OR ORDINANCES SHALL
<br />GOVERN. NOTIFY THE ARCHITECT OF ALL CONFLICTS.
<br />2. SECURE RELEVANT CITY AND STATE APPROVALS RELATING TO FIRE, CONSTRUCTION, LABOR, HEALTH
<br />AND LICENSING. CONTRACTOR SHALL FURTHER POSTALL BONDS AND SECURE ALL INSURANCE
<br />REQUIRED BY LAW OR CONTRACT, FORWARDING PROOF OF SUCH ACTIONS TO THE LANDLORD PRIOR
<br />TO COMMENCEMENT OF CONSTRUCTION.
<br />3. WORK NOT INCLUDED IN THIS CONTRACT SHALL BE MARKED "N.I.C." OR SPECIFICALLY ASSIGNED To
<br />ANOTHER PARTY.
<br />4. CONTRACTOR SHALL VISIT THE SITE, REVIEW THE DRAWINGS AS SUBMITTED BY THE ARCHITECT, AND
<br />BECOME THOROUGHLY FAMILIAR' ITH THE SITE CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION.
<br />5. ALL WORK SHALL BE APPLIED IN ACCORDANCE 1r 7FI THE MANUFACTURERS LATEST
<br />RECOMMENDATIONS OR WRITTEN DIRECTIONS.
<br />6. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, THE
<br />DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK.
<br />7. WHERE DEVICES OR ITEMS OR PARTS THEREOF ARE REFERRED TO IN SINGULAR, IT IS INTENDED
<br />THAT SUCH SHALL APPLY TO AS MANY SUCH DEVICES, ITEMS OR PARTS AS ARE REQUIRED TO
<br />PROPERLY COMPLETE THE WORK.
<br />8. VERIFY ALL "BUILDING STANDARDS" WITH BUILDING OWNER PRIOR TO BEGINNING ANY WORK.
<br />HOWEVER, THERE SHALL BE NO DEVIATIONS WHATSOEVER FROM THE CONTRACT DOCUMENTS
<br />WITHOUT THE ARCHITECT'S WRITTEN APPROVAL THEREOF. THE CONTRACTOR AGREES To DEFEND,
<br />INDEMNIFY, AND HOLD THE ARCHITECT HARMLESS FROM ANY CLAIMS ARISING AS A RESULT OF
<br />UNAPPROVED CHANGES.
<br />9. LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM
<br />DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR
<br />OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF TEAS WORK,
<br />10. VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL UTILITY COMPANIES UNLESS OTHERWISE
<br />NOTED IN THE PLAINS OR SPECIFICATIONS.
<br />11. ALL DEBRIS SHALL BE REMOVED, FROM PREMISES AND ALL AREAS SHALL BE LEFT IN A CLEAN
<br />(BROOM) CONDITION AT ALL TIMES.
<br />12. PROTECT ADJACENT WORK AND REPAIR ANY DAMAGE AT CONTRACTOR'S OWN EXPENSE.
<br />13, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN ACCORDANCE
<br />WITH ALL APPLICABLE SAFETY CODES,
<br />14. THE CONTRACTOR SHALL INDEMNIFY AND HOLD THE BUILDING OWNER/ARCHITECT/ENGINEER
<br />HARMLESS FOR INJURY OR DEATH TO PERSONS OR FOR DAMAGE TO PROPERTY CAUSED BY THE
<br />NEGLIGENCE OF THE CONTRACTOR, HIS AGENTS, EMPLOYEES, OR SUBCONTRACTORS,
<br />15. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY ANY WORKERS. ALL
<br />CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS WELL AS ALL REVISIONS, ADDENDA,
<br />AND CHANGE ORDERS. THE CONTRACTOR SHALL ALSO MAINTAIN IN GOOD CONDITION, ONE COMPLETE
<br />SET OF PLANS WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS, ON THE PREMISES AT ALL TIMES
<br />WHICH ARE TO BE UNDER THE CARE OF THE JOB SUPERINTENDENT.
<br />16. MAINTAIN ALL EXIT PATHWAYS DURING CONSTRUCTION.
<br />17. PROVIDE COMPLETE SECURITY OF THE TENANT SUITE WHILE JOB IS IN PROGRESS AND UNTIL THE
<br />JOB IS COMPLETED.
<br />18. AT COMPLETION OF THE WORK, REMOVE ALL DEBRIS FROM THE SITE, LEAVING SPACE CLEAN, WASH
<br />ALL WINDOWS AND GLASS, POLISH ALL HARDWARE AND FIXTURES. REPLACE AND PATCH AREAS OF
<br />CEILING DAMAGED DUE TO LIGHTING INSTALLATION OR MECHANICAL ADJUSTMENT.
<br />19. WN1IMIZE DISRUPTIONS OF BUILDING OCCUPANTS DUE TO NOISE, ODOR, FUMES, OR VIBRATION. AT
<br />THE END OF CONSTRUCTION THE CONTRACTOR SHALL COMPLETELY CLEAN ALL AREAS SOILED BY
<br />CONSTRUCTION ACTIVITIES INCLUDING THOSE IN WHICH NO WORK WAS DONE.
<br />20. LATHING, PLASTER, AND GYPSUM WALL BOARD SYSTEMS SHALL CONFORM TO CHAPTER 25 OF THE
<br />2015 LB�c.
<br />21. ALL GLASS AND GLAZING SHALL COMPLY W71-1 CHAPTER 24 OF THE 2015 LB.C. AND THE U.S.
<br />PRODUCT SAFETY COMMISSION: SAFETY STANDARDS FOR ARCHITECTURAL GLAZING MATERIALS (42 FR
<br />1426:16 CFR PART 1201).
<br />22. VERIFY ALL DOOR AND WINDOW ROUGH OPENING DIMENSIONS WITH DOOR AND WINDOW
<br />MANUFACTURERS.
<br />23. DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONSTRUCTION DRAWING SHOULD BE
<br />CALLED TO THE ATTENTION OF THE ARCHITECT.
<br />24. CONSTRUCT WALLS PLUMB AND SQUARE WITH EXISTING STRUCTURE AND NEW CONSTRUCTION
<br />UNLESS NOTED OTHERWISE.
<br />25. COORDINATION: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION AND
<br />COORDINATION OF THE WORK OF ALL TRADES TO ASSURE COMPLIANCE WITH THE DRAWINGS.
<br />Wgfflmr-�*
<br />CONSTRUCTION
<br />1. INVESTIGATE AND VERIFY LOCATIONS OF EXISTING STRUCTURAL, PLUMBING, MECHANICAL, AND
<br />ELECTRICAL ELEMENTS AND OTHER EXISTING CONDITIONS AND NOTIFY THE ARCHITECT OF ANY AND ALL
<br />DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
<br />2. COORDINATE CONSTRUCTION SCHEDULING WITH THE BUILDING OWNER TO ALLOW ONGOING
<br />OPERATION OF THE FACILITY DURING CONSTRUCTION.
<br />3. PROVIDE BLOCKING AS REQUIRED FOR WALL AND CEILING MOUNTED ITEMS.
<br />4. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH.
<br />5. PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS.
<br />6. PATCH AND REPAIR ALL EXISTING SURFACES AS REQUIRED BY DEMOLITION AND NEW CONSTRUCTION
<br />TO RECEIVE NEW SCHEDULED FINISHES. ALL SURFACES ARE TO HAVE "LIKE -NEW" APPEARANCE.
<br />7. STUD HEIGHT AND SPACING LIMITATION OF STEEL FRAMING COMPONENTS SHOULD BE IN
<br />COMPLIANCE WITH ASTM C 754 FOR MAXIMUM DEFLECTION AND MINIMUM LATERAL LOADING
<br />REQUIREMENTS.
<br />8. ALL DEMOLISHED MATERIALS TO BE RECYCLED TO AN APPROVED RECYCLER.
<br />PLUMBING, MECHANICAL & ELECTRICAL
<br />1. PLUMBING, MECHANICAL, & ELECTRICAL DRAWINGS ARE TO BE SUBMITTED UNDER SEPARATE
<br />PERMIT.
<br />2. MECHANICAL & ELECTRICAL CONTRACTORS SHALL BE RESPONSIBLE TO MAINTAIN COMPLIANCE
<br />WITH APPLICABLE CODES AND STANDARDS AND OBTAIN ALL NECESSARY PERMITS AND APPROVALS,
<br />3. MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE BIDDER DESIGN/BUILD. THE CONTRACTOR SHALL
<br />BE RESPONSIBLE FOR OBTAINING THE CORRESPONDING PERMITS FOR WORK. THE PROPOSED
<br />SYSTEM DESIGN & METHOD OF OPERATION FOR ALL ROOMS SHALL BE REVIEWED AND APPROVED BY
<br />THE TENANT PRIOR TO THE START OF ANY WORK.
<br />4. WHERE APPLICABLE, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION
<br />DRAWINGS ARE SUPPLEMENTARY TO THESE DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE
<br />ARCHITECT OF ALL DISCREPANCIES BETWEEN THE CONSULTANTS'DRAWINGS WITH A WRITTEN
<br />REQUEST FOR CLARIFICATION. ANY WORK INSTALLED IN CONFLICT WITH THESE DRAWINGS OR
<br />SPECIFICATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT NO EXPENSE TO THE BUILDING
<br />OWNER, TENANT, OR ARCHITECT.
<br />5. ALL CABLING AND WIRING NOT IN CONDUITS OR FULL SURROUND CABLE TRAYS SHALL HAVE A
<br />FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE DEVELOPMENT RANGE OF LESS THAN 50.
<br />6. ALL EXPOSED MATERIAL & PIPING IN RETURN AIR PLENUM MUST MEET FS 25.
<br />7. ALL PLUMBING AND HVAC PIPE AND DUCTWORK IN PLENUM SHALL HAVE A FLAME SPREAD RATING
<br />OF LESS THAN 25 AND A SMOKE DEVELOPMENT RANGE OF LESS THAN 50
<br />SU SMI ITTALS AND WARRANTY
<br />1. SUBMiTA LIST OF PROPOSED PRODUCT SUBMITTALS AND SHOP DRAWINGS TO THE OWNER FOR
<br />APPROVAL PRIOR TO START OF CONSTRUCTION,
<br />2. ALL PRODUCTS AND MATERIALS SPECIFIED IN THE DRAWINGS (Wd TH EXCEPTION TO SPECIFIC FINISH
<br />COLORS AND FLOORING) ARE INTENDED TO BE ON AN "OR EQUAL" BASIS. ANY PROPOSED
<br />SUBSTITUTIONS MUST BE SUBMITTED TO THE ARCHITECT IN WRITING FOR APPROVAL WITHOUT DELAY
<br />OF SCHEDULE.
<br />3. ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER COMPLETION, UNLESS
<br />OTHERWISE SPECIFIED, AND SHALL BE SO STATED IN CONTRACTOR'S WRITTEN PROPOSAL AND
<br />AGREEMENT. ALL REPAIRS, CORRECTIONS, DISCREPANCIES, ETC., MUST BE MADE WITHOUT ANY
<br />ADDITIONAL COST TO THE OWNER, AND WITHIN FIVE (5) DAYS AFTER NOTICE IS GIVEN.
<br />FIRE PROTECTION
<br />CEILING
<br />1. REFLECTED CEILING PLAN IS FOR THE GENERAL INFORMATION OF THE CONTRACTOR. EXACT
<br />LOCATIONS SHOULD BE VERIFIED.
<br />- 10101 z
<br />1. ALL DOOR HARDWARE TO MEET REQUIREMENTS OF 2015 iBC AND OWNER'S BUILDING
<br />REQUIREMENTS.
<br />2. COORDINATE ALL KEYING REQUIREMENTS WITH OWNER/TENANT. CONTRACTOR SHALL PROVIDE ALL
<br />LOCKSET CYLINDERS TO MATCH OWNER STANDARD. CONTRACTOR SHALL RE -KEY ALL DOORS TO MEET
<br />TENANT AND OWNER'S REQUIREMENTS.
<br />FINISH AND MATERIALS
<br />1. SUBMIT FINISH SAMPLES TO TENANT AND OWNER FOR APPROVAL PRIOR TO ORDERING MATERIALS.
<br />2. INTERSECTION OF SCHEDULED FLOORING MATERIALS ARE TO OCCUR AT CENTERLINE OF DOOR
<br />WHEN IN A FULLY CLOSED POSITION UNLESS NOTED OTHERWISE.
<br />3. PROVIDE APPROPRIATE TRANSITION MATERIAL AS REQUIRED WHERE DISSIMILAR FLOORING
<br />MATERIALS INTERSECT.
<br />PROJECT ADDRESS:
<br />JURIS DiCT[ON:
<br />PARCEL NUN46ER:
<br />wjlts_If�
<br />ZONING:
<br />OCCUPANCY CLASSIFICATION (EXISTING):
<br />OCCUPANCY CLASSIFICATION (PROPOSED):
<br />SPRINKLERED:
<br />NUMBER OF STORIES:
<br />SQ. FT. OF BUILDING:
<br />SQ. FT. OF IMPROVEMENT:
<br />NUMBER OF PARKING STALLS (EXISTING):
<br />NUMBER OF PARKING STALLS (PROPOSED):
<br />LEGAL DESCRIPTION
<br />4808 EVERGREEN WAY
<br />EVERETT, WASHINGTON, 98203
<br />CITY OF EVERETT_-
<br />00581900006500 100581900006300 100581900007100 1
<br />90581900007200 100581900007300
<br />(B) BUSINESS
<br />(M) MERCANTILE
<br />NON-SPRINKLERED
<br />,2ST&RlDE-S7-
<br />15,623 �Q. FT,
<br />9,031 SQ. FT. (GROUND LEVEL ONLY)
<br />57 STALLS
<br />NO CHANGE TO EXISTING
<br />SECTION 31 TOWNSHIP 29 RANGE 05 QUARTER BE SUBDIVISION SOUTH HIGHWAY ADD TO EVERETT BLK
<br />000 D-00 LOTS 65 THRU 70 INCL
<br />SECTION 31 TOWNSH P 29 RANGE 05 QUARTER SE SUBDIVISION SOUTH HIGHWAY ADD TO EVERETT BLK
<br />000 D-00 LOTS 63 & 64
<br />DESCRIPTION OF WORK
<br />INTERIOR TENANT IMPROVEMENT TO INCLUDE DEMOLITION OF NON -LOAD BEARING INTERIOR
<br />PARTITIONS; CONSTRUCTION OF NEW NON -LOAD BEARING PARTITIONS; AND RESTROOM REVISIONS.
<br />BUILDING WILL BE DEMISED INTO SEPARATE TENANT SPACES,
<br />NO EXTERIOR WORK IS INCLUDED WITH THIS APPLICATION.
<br />DEFERRED SUBMITTALS
<br />THE FOLLOWING PORTIONS OF THE PROJECT WILL BE APPLIED FOR UNDER SEPARATE PERMITS,
<br />1. HVAC SYSTEM. (DUCTING, DISTRIBUTION, CONTROLS, AND ASSOCIATED STRUCTURAL)
<br />2. LINE VOLTAGE ELECTRICAL SYSTEM WORK.
<br />3. LIFE SAFETY SYSTEMS. (HORNS, STROBES & FIRE ALARWSPRINKLER IMPROVEMENTS)
<br />4. LOW VOLTAGE ELECTRICAL SYSTEMS. (TELEPHONE/DATAISECURITY/INTERCOM)
<br />5. PLUMBING (WATER, SANITARY, NATURAL GAS)
<br />M
<br />a%
<br />2019 'UNIFORM PLUMBING CODE],,"
<br />L N 1"CIDE W/ WASHINGTON STATE AMENDMENTS (51-50 WAC)
<br />2015 INTERNATIONAL EXISTING BUILDING CODE
<br />2015 INTERNATIONAL FIRE CODE W/ WASHINGTON STATE AMENDMENTS (51-54 WAC)
<br />2015 INTERNATIONAL MECHANICAL CODE W/ WASHINGTON STATE AMENDMENTS (51-52 WAC)
<br />2009 ICC Al 17.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
<br />REGIONAL,
<br />WASHINGTON STATE ENERGY CODE (51-11 WAC)
<br />WASHINGTON STATE ADMINSTRA7VE CODE (WAC)
<br />VICINITY MAP
<br />11
<br />0
<br />fil
<br />FRE,IHEIT
<br />EMNEMMMM1 ARCHITECTURE
<br />m-
<br />OL71)
<br />m�
<br />z
<br />0
<br />F-
<br />5_
<br /><
<br />Ine
<br />>
<br />r
<br />y",
<br />>
<br />uj
<br />CD
<br />ED
<br />C)
<br />ED
<br />>
<br />00
<br />ad
<br />!IA77 )
<br />R E G 1 R E D
<br />0FVVAS1-: .GTON
<br />ISSUE LIST
<br />PERMIT DOCUMENTS
<br />I PERMIT RESPONSE
<br />'12/30,12020
<br />01 /2512021
<br />G"IrENERAL NOTEED'
<br />Malmmrdmum-mal MIT01jammum
<br />A of .i,
<br />U