Laserfiche WebLink
GENERAL NOTES <br />PROJECT DATA <br />CONSTRUCTION <br />1. ALL CONSTRUCTION SHALL COMPLY WITH THE 2015 WTERNATIONAL au&DJmG CODE AS ADOPTED BY <br />THE CITYOFEVERET7, STATE REGULATIONS FOR BARRIER FREE DESIGN, WA S7ATE ENERGY CODE, <br />AND ALL APPLICABLE LOCAL CODES, ORDINANCES, AND STANDARDS. IN CASE OF ANY CONFLICT WHERE <br />THE METHODS OR STANDARDS OF INSTALLATION OF THE -MATERIALS SPECIFIED DO NOT EQUAL OR <br />EXCEED THE REQUIREMENTS OF THE LAWS OR ORDINANCES, THE LAWS OR ORDINANCES SHALL <br />GOVERN. NOTIFY THE ARCHITECT OF ALL CONFLICTS. <br />2. SECURE RELEVANT CITY AND STATE APPROVALS RELATING TO FIRE, CONSTRUCTION, LABOR, HEALTH <br />AND LICENSING. CONTRACTOR SHALL FURTHER POSTALL BONDS AND SECURE ALL INSURANCE <br />REQUIRED BY LAW OR CONTRACT, FORWARDING PROOF OF SUCH ACTIONS TO THE LANDLORD PRIOR <br />TO COMMENCEMENT OF CONSTRUCTION. <br />3. WORK NOT INCLUDED IN THIS CONTRACT SHALL BE MARKED "N.I.C." OR SPECIFICALLY ASSIGNED To <br />ANOTHER PARTY. <br />4. CONTRACTOR SHALL VISIT THE SITE, REVIEW THE DRAWINGS AS SUBMITTED BY THE ARCHITECT, AND <br />BECOME THOROUGHLY FAMILIAR' ITH THE SITE CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION. <br />5. ALL WORK SHALL BE APPLIED IN ACCORDANCE 1r 7FI THE MANUFACTURERS LATEST <br />RECOMMENDATIONS OR WRITTEN DIRECTIONS. <br />6. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, THE <br />DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. <br />7. WHERE DEVICES OR ITEMS OR PARTS THEREOF ARE REFERRED TO IN SINGULAR, IT IS INTENDED <br />THAT SUCH SHALL APPLY TO AS MANY SUCH DEVICES, ITEMS OR PARTS AS ARE REQUIRED TO <br />PROPERLY COMPLETE THE WORK. <br />8. VERIFY ALL "BUILDING STANDARDS" WITH BUILDING OWNER PRIOR TO BEGINNING ANY WORK. <br />HOWEVER, THERE SHALL BE NO DEVIATIONS WHATSOEVER FROM THE CONTRACT DOCUMENTS <br />WITHOUT THE ARCHITECT'S WRITTEN APPROVAL THEREOF. THE CONTRACTOR AGREES To DEFEND, <br />INDEMNIFY, AND HOLD THE ARCHITECT HARMLESS FROM ANY CLAIMS ARISING AS A RESULT OF <br />UNAPPROVED CHANGES. <br />9. LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM <br />DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR <br />OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF TEAS WORK, <br />10. VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL UTILITY COMPANIES UNLESS OTHERWISE <br />NOTED IN THE PLAINS OR SPECIFICATIONS. <br />11. ALL DEBRIS SHALL BE REMOVED, FROM PREMISES AND ALL AREAS SHALL BE LEFT IN A CLEAN <br />(BROOM) CONDITION AT ALL TIMES. <br />12. PROTECT ADJACENT WORK AND REPAIR ANY DAMAGE AT CONTRACTOR'S OWN EXPENSE. <br />13, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN ACCORDANCE <br />WITH ALL APPLICABLE SAFETY CODES, <br />14. THE CONTRACTOR SHALL INDEMNIFY AND HOLD THE BUILDING OWNER/ARCHITECT/ENGINEER <br />HARMLESS FOR INJURY OR DEATH TO PERSONS OR FOR DAMAGE TO PROPERTY CAUSED BY THE <br />NEGLIGENCE OF THE CONTRACTOR, HIS AGENTS, EMPLOYEES, OR SUBCONTRACTORS, <br />15. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY ANY WORKERS. ALL <br />CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS WELL AS ALL REVISIONS, ADDENDA, <br />AND CHANGE ORDERS. THE CONTRACTOR SHALL ALSO MAINTAIN IN GOOD CONDITION, ONE COMPLETE <br />SET OF PLANS WITH ALL REVISIONS, ADDENDA, AND CHANGE ORDERS, ON THE PREMISES AT ALL TIMES <br />WHICH ARE TO BE UNDER THE CARE OF THE JOB SUPERINTENDENT. <br />16. MAINTAIN ALL EXIT PATHWAYS DURING CONSTRUCTION. <br />17. PROVIDE COMPLETE SECURITY OF THE TENANT SUITE WHILE JOB IS IN PROGRESS AND UNTIL THE <br />JOB IS COMPLETED. <br />18. AT COMPLETION OF THE WORK, REMOVE ALL DEBRIS FROM THE SITE, LEAVING SPACE CLEAN, WASH <br />ALL WINDOWS AND GLASS, POLISH ALL HARDWARE AND FIXTURES. REPLACE AND PATCH AREAS OF <br />CEILING DAMAGED DUE TO LIGHTING INSTALLATION OR MECHANICAL ADJUSTMENT. <br />19. WN1IMIZE DISRUPTIONS OF BUILDING OCCUPANTS DUE TO NOISE, ODOR, FUMES, OR VIBRATION. AT <br />THE END OF CONSTRUCTION THE CONTRACTOR SHALL COMPLETELY CLEAN ALL AREAS SOILED BY <br />CONSTRUCTION ACTIVITIES INCLUDING THOSE IN WHICH NO WORK WAS DONE. <br />20. LATHING, PLASTER, AND GYPSUM WALL BOARD SYSTEMS SHALL CONFORM TO CHAPTER 25 OF THE <br />2015 LB�c. <br />21. ALL GLASS AND GLAZING SHALL COMPLY W71-1 CHAPTER 24 OF THE 2015 LB.C. AND THE U.S. <br />PRODUCT SAFETY COMMISSION: SAFETY STANDARDS FOR ARCHITECTURAL GLAZING MATERIALS (42 FR <br />1426:16 CFR PART 1201). <br />22. VERIFY ALL DOOR AND WINDOW ROUGH OPENING DIMENSIONS WITH DOOR AND WINDOW <br />MANUFACTURERS. <br />23. DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONSTRUCTION DRAWING SHOULD BE <br />CALLED TO THE ATTENTION OF THE ARCHITECT. <br />24. CONSTRUCT WALLS PLUMB AND SQUARE WITH EXISTING STRUCTURE AND NEW CONSTRUCTION <br />UNLESS NOTED OTHERWISE. <br />25. COORDINATION: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION AND <br />COORDINATION OF THE WORK OF ALL TRADES TO ASSURE COMPLIANCE WITH THE DRAWINGS. <br />Wgfflmr-�* <br />CONSTRUCTION <br />1. INVESTIGATE AND VERIFY LOCATIONS OF EXISTING STRUCTURAL, PLUMBING, MECHANICAL, AND <br />ELECTRICAL ELEMENTS AND OTHER EXISTING CONDITIONS AND NOTIFY THE ARCHITECT OF ANY AND ALL <br />DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. <br />2. COORDINATE CONSTRUCTION SCHEDULING WITH THE BUILDING OWNER TO ALLOW ONGOING <br />OPERATION OF THE FACILITY DURING CONSTRUCTION. <br />3. PROVIDE BLOCKING AS REQUIRED FOR WALL AND CEILING MOUNTED ITEMS. <br />4. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH. <br />5. PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS. <br />6. PATCH AND REPAIR ALL EXISTING SURFACES AS REQUIRED BY DEMOLITION AND NEW CONSTRUCTION <br />TO RECEIVE NEW SCHEDULED FINISHES. ALL SURFACES ARE TO HAVE "LIKE -NEW" APPEARANCE. <br />7. STUD HEIGHT AND SPACING LIMITATION OF STEEL FRAMING COMPONENTS SHOULD BE IN <br />COMPLIANCE WITH ASTM C 754 FOR MAXIMUM DEFLECTION AND MINIMUM LATERAL LOADING <br />REQUIREMENTS. <br />8. ALL DEMOLISHED MATERIALS TO BE RECYCLED TO AN APPROVED RECYCLER. <br />PLUMBING, MECHANICAL & ELECTRICAL <br />1. PLUMBING, MECHANICAL, & ELECTRICAL DRAWINGS ARE TO BE SUBMITTED UNDER SEPARATE <br />PERMIT. <br />2. MECHANICAL & ELECTRICAL CONTRACTORS SHALL BE RESPONSIBLE TO MAINTAIN COMPLIANCE <br />WITH APPLICABLE CODES AND STANDARDS AND OBTAIN ALL NECESSARY PERMITS AND APPROVALS, <br />3. MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE BIDDER DESIGN/BUILD. THE CONTRACTOR SHALL <br />BE RESPONSIBLE FOR OBTAINING THE CORRESPONDING PERMITS FOR WORK. THE PROPOSED <br />SYSTEM DESIGN & METHOD OF OPERATION FOR ALL ROOMS SHALL BE REVIEWED AND APPROVED BY <br />THE TENANT PRIOR TO THE START OF ANY WORK. <br />4. WHERE APPLICABLE, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION <br />DRAWINGS ARE SUPPLEMENTARY TO THESE DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE <br />ARCHITECT OF ALL DISCREPANCIES BETWEEN THE CONSULTANTS'DRAWINGS WITH A WRITTEN <br />REQUEST FOR CLARIFICATION. ANY WORK INSTALLED IN CONFLICT WITH THESE DRAWINGS OR <br />SPECIFICATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT NO EXPENSE TO THE BUILDING <br />OWNER, TENANT, OR ARCHITECT. <br />5. ALL CABLING AND WIRING NOT IN CONDUITS OR FULL SURROUND CABLE TRAYS SHALL HAVE A <br />FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE DEVELOPMENT RANGE OF LESS THAN 50. <br />6. ALL EXPOSED MATERIAL & PIPING IN RETURN AIR PLENUM MUST MEET FS 25. <br />7. ALL PLUMBING AND HVAC PIPE AND DUCTWORK IN PLENUM SHALL HAVE A FLAME SPREAD RATING <br />OF LESS THAN 25 AND A SMOKE DEVELOPMENT RANGE OF LESS THAN 50 <br />SU SMI ITTALS AND WARRANTY <br />1. SUBMiTA LIST OF PROPOSED PRODUCT SUBMITTALS AND SHOP DRAWINGS TO THE OWNER FOR <br />APPROVAL PRIOR TO START OF CONSTRUCTION, <br />2. ALL PRODUCTS AND MATERIALS SPECIFIED IN THE DRAWINGS (Wd TH EXCEPTION TO SPECIFIC FINISH <br />COLORS AND FLOORING) ARE INTENDED TO BE ON AN "OR EQUAL" BASIS. ANY PROPOSED <br />SUBSTITUTIONS MUST BE SUBMITTED TO THE ARCHITECT IN WRITING FOR APPROVAL WITHOUT DELAY <br />OF SCHEDULE. <br />3. ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER COMPLETION, UNLESS <br />OTHERWISE SPECIFIED, AND SHALL BE SO STATED IN CONTRACTOR'S WRITTEN PROPOSAL AND <br />AGREEMENT. ALL REPAIRS, CORRECTIONS, DISCREPANCIES, ETC., MUST BE MADE WITHOUT ANY <br />ADDITIONAL COST TO THE OWNER, AND WITHIN FIVE (5) DAYS AFTER NOTICE IS GIVEN. <br />FIRE PROTECTION <br />CEILING <br />1. REFLECTED CEILING PLAN IS FOR THE GENERAL INFORMATION OF THE CONTRACTOR. EXACT <br />LOCATIONS SHOULD BE VERIFIED. <br />- 10101 z <br />1. ALL DOOR HARDWARE TO MEET REQUIREMENTS OF 2015 iBC AND OWNER'S BUILDING <br />REQUIREMENTS. <br />2. COORDINATE ALL KEYING REQUIREMENTS WITH OWNER/TENANT. CONTRACTOR SHALL PROVIDE ALL <br />LOCKSET CYLINDERS TO MATCH OWNER STANDARD. CONTRACTOR SHALL RE -KEY ALL DOORS TO MEET <br />TENANT AND OWNER'S REQUIREMENTS. <br />FINISH AND MATERIALS <br />1. SUBMIT FINISH SAMPLES TO TENANT AND OWNER FOR APPROVAL PRIOR TO ORDERING MATERIALS. <br />2. INTERSECTION OF SCHEDULED FLOORING MATERIALS ARE TO OCCUR AT CENTERLINE OF DOOR <br />WHEN IN A FULLY CLOSED POSITION UNLESS NOTED OTHERWISE. <br />3. PROVIDE APPROPRIATE TRANSITION MATERIAL AS REQUIRED WHERE DISSIMILAR FLOORING <br />MATERIALS INTERSECT. <br />PROJECT ADDRESS: <br />JURIS DiCT[ON: <br />PARCEL NUN46ER: <br />wjlts_If� <br />ZONING: <br />OCCUPANCY CLASSIFICATION (EXISTING): <br />OCCUPANCY CLASSIFICATION (PROPOSED): <br />SPRINKLERED: <br />NUMBER OF STORIES: <br />SQ. FT. OF BUILDING: <br />SQ. FT. OF IMPROVEMENT: <br />NUMBER OF PARKING STALLS (EXISTING): <br />NUMBER OF PARKING STALLS (PROPOSED): <br />LEGAL DESCRIPTION <br />4808 EVERGREEN WAY <br />EVERETT, WASHINGTON, 98203 <br />CITY OF EVERETT_- <br />00581900006500 100581900006300 100581900007100 1 <br />90581900007200 100581900007300 <br />(B) BUSINESS <br />(M) MERCANTILE <br />NON-SPRINKLERED <br />,2ST&RlDE-S7- <br />15,623 �Q. FT, <br />9,031 SQ. FT. (GROUND LEVEL ONLY) <br />57 STALLS <br />NO CHANGE TO EXISTING <br />SECTION 31 TOWNSHIP 29 RANGE 05 QUARTER BE SUBDIVISION SOUTH HIGHWAY ADD TO EVERETT BLK <br />000 D-00 LOTS 65 THRU 70 INCL <br />SECTION 31 TOWNSH P 29 RANGE 05 QUARTER SE SUBDIVISION SOUTH HIGHWAY ADD TO EVERETT BLK <br />000 D-00 LOTS 63 & 64 <br />DESCRIPTION OF WORK <br />INTERIOR TENANT IMPROVEMENT TO INCLUDE DEMOLITION OF NON -LOAD BEARING INTERIOR <br />PARTITIONS; CONSTRUCTION OF NEW NON -LOAD BEARING PARTITIONS; AND RESTROOM REVISIONS. <br />BUILDING WILL BE DEMISED INTO SEPARATE TENANT SPACES, <br />NO EXTERIOR WORK IS INCLUDED WITH THIS APPLICATION. <br />DEFERRED SUBMITTALS <br />THE FOLLOWING PORTIONS OF THE PROJECT WILL BE APPLIED FOR UNDER SEPARATE PERMITS, <br />1. HVAC SYSTEM. (DUCTING, DISTRIBUTION, CONTROLS, AND ASSOCIATED STRUCTURAL) <br />2. LINE VOLTAGE ELECTRICAL SYSTEM WORK. <br />3. LIFE SAFETY SYSTEMS. (HORNS, STROBES & FIRE ALARWSPRINKLER IMPROVEMENTS) <br />4. LOW VOLTAGE ELECTRICAL SYSTEMS. (TELEPHONE/DATAISECURITY/INTERCOM) <br />5. PLUMBING (WATER, SANITARY, NATURAL GAS) <br />M <br />a% <br />2019 'UNIFORM PLUMBING CODE],," <br />L N 1"CIDE W/ WASHINGTON STATE AMENDMENTS (51-50 WAC) <br />2015 INTERNATIONAL EXISTING BUILDING CODE <br />2015 INTERNATIONAL FIRE CODE W/ WASHINGTON STATE AMENDMENTS (51-54 WAC) <br />2015 INTERNATIONAL MECHANICAL CODE W/ WASHINGTON STATE AMENDMENTS (51-52 WAC) <br />2009 ICC Al 17.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES <br />REGIONAL, <br />WASHINGTON STATE ENERGY CODE (51-11 WAC) <br />WASHINGTON STATE ADMINSTRA7VE CODE (WAC) <br />VICINITY MAP <br />11 <br />0 <br />fil <br />FRE,IHEIT <br />EMNEMMMM1 ARCHITECTURE <br />m- <br />OL71) <br />m� <br />z <br />0 <br />F- <br />5_ <br />< <br />Ine <br />> <br />r <br />y", <br />> <br />uj <br />CD <br />ED <br />C) <br />ED <br />> <br />00 <br />ad <br />!IA77 ) <br />R E G 1 R E D <br />0FVVAS1-: .GTON <br />ISSUE LIST <br />PERMIT DOCUMENTS <br />I PERMIT RESPONSE <br />'12/30,12020 <br />01 /2512021 <br />G"IrENERAL NOTEED' <br />Malmmrdmum-mal MIT01jammum <br />A of .i, <br />U <br />