Laserfiche WebLink
A Benchmark Is Required on Site <br />To Verify Ap 'High" <br />, & 'Heigh" <br />*2 <br />181-011 <br />WALL A ELEVATION <br />1FEUBLi IS NOT POSETIONED A, S <br />INDICATED ON APPROVED SITE PT,,k-.Nr, <br />A NEIN SITE PLkN SH�ALL BE, SliBMIT-i <br />TENO FUIRTIIEIFey INSPECTIONS WILL <br />BE �,i ON THIS PR0JEC-311 UNTILT,-t',lZ <br />REVISERD SITE PLAN HAS BEEN APPRO,'t�,- <br />ED BY THE BIJILDINGIPUBLIC W�ORKS <br />D E, P TS <br />GRADING AND DRAINAGE <br />PrOvfs%)T'L3 s be rnade for the control and drainage o"Isurface <br />water aro�und buildings Lev: guitters, drain lines, iniets and catch <br />basins or other necessary drainage structures and shall be Installed <br />where st0i'm water disposal cannot be obtained iii their use or <br />where erosion cannot be preverited by fin�sh gradinc, and piantingy. <br />Dry wells shali riot be installed in areas where the soil is not weli <br />drained ai-idjor porous. <br />2. Grading shall be provIded to insure. <br />L (a) Diversion of water away ifforn builcHngs. <br />Prevention of stand�ng ,ii and soil sa,"uratmn detrjm, ental <br />to structures and iot use. <br />(C) That natural drainage channlels orbashis are not bliociked or <br />oiled, <br />,(,d) Provisio,ns for the disposal Of 1water. from a lot, <br />i?e) Protection of adjoining propeirti <br />VA7 ON 7L, I 18, 1 / <br />INUOUS <br />T VENTS <br />3 OVER <br />ZAP OVER <br />I <br />FINISHED GRADE ABL;r,,h02J <br />DIMENSIONS SHOWN ARE <br />NOMINAL - CUSTOMER TO <br />CONFIRM FINISH OPENING WITH <br />TUFF SHED REPRESENTATIVE <br />Roof tli to be designed <br />and drawing prepared by <br />ie State licensed structuraii <br />engineer, <br />CONCRETE -ENCASED ELEC7ROVE2 <br />(UFER GROUND) REQUMED <br />PER NEC 250-60 <br />(INSPECTED AT FOOTINGS) <br />Add itional PsrM, its Are, ReqUfired <br />For This Project To Incilude: <br />PWMbjn,"q <br />Me <br />. chanical <br />E I e c td, ce i <br />11177 1 Ir-iii <br />WALL C ELEVATIO N, 3(' <br />Sprimid er <br />Fire Alan <br />3 3 OVER <br />ZAP OVER <br />3 <br />CC'S Pe, r <br />5% DOWNSLOPE F( <br />MINIMUM ON ALL � <br />1113T. �0s 0 <br />DRAWING INDEX <br />S1 - PROJECT NOTES, ELEVATIONS <br />S2 - PLANS, SHEAR WALL SCHEDULF <br />S3 - SECTIONS, DETAILS <br />I i <br />yill <br />WALL B ELEVATION <br />1:11 ligi <br />f <br />EALYL ELIEVAT10,1\13 L-AILCW 11710U� <br />A =­ I 'LIZ., ',s_ <br />9= 07— 5' <br />,C = 102, 0' <br />D, z 10 1 &_ <br />A & i C-, 4 L 1�09,3 I D? . I " iwt ru&�'7 BA sir F Lv,.,v-n o im mu s o se- er_- s i —iE PLIa iv <br />-4- Al AX I AJ) LAY) P-L-1 GlY T Z9, 1 "(FE-E T)' <br />7--IZ2, 1' f1KAx1&AbhY\ frIO/NiIJ ALLOW&-A.`� <br />171WITUT.MarwrNallwa <br />iii­--- P'44'k I g 3u <br />SHINGLES <br />3 OVER <br />SAP OVER <br />SLY RED <br />A SL - I D 2. 11 Ll <br />SHINGLES <br />91�11111111 <br />DESIGN REQUIREMENTS <br />1. GO ERNIN ODES: 2015 IRC <br />OCCUPANCY REQUIREMENTS: GROUP U <br />CONSTRUCTiON TYPE: V-B <br />2. DESIGN SCHEDULE <br />A, <br />BUILDING SIZE <br />VVIDTH: 181 <br />LENGTH: 34'-0" <br />SIDE WALL HEIGHT: 9'-1 1/8" <br />TOTAL HEIGHT: 116-0 118" <br />Ole <br />B. <br />BUILDING LOADS <br />ROOF LIVE LOAD: 25 PSF <br />ROOF DEAD LOAD: 10 PSF <br />LOFT LIVE LOAD: 30 PSF <br />LOFT DEAD LOAD: 10 PSF <br />C. <br />DESIGN WIND <br />110 4 177 <br />3 SECOND GUST, Vuit: 110 MPH <br />WIND EXPOSURE: C <br />D. <br />SEISMIC DESIGN CATEGORY: D <br />E. <br />SITE CLASS: D <br />F. <br />ROOF PITCH: 8/12 <br />3. ROOFING SCHEDULE <br />A. ROOF SHEATHING SHALL BE APA RATED 7116" THICK OSS WITH FOIL <br />BACKING. STAGGER LAYOUT PER APA CONDITION 1. <br />-B. Pi #24116 MIN UNBLOCKED. <br />C. SHEATHING NAILING SHALL BE PER NAILING SCHEDULE. CD <br />D. LIFETIME DIMENSIONAL ASPHALT SHINGLES (U.N.O.). _. <br />c) <br />E. GAF FELTBUSTER. isl <br />,F. TYRE 'D'METAL DRIP EDGE FLASHING REQUIRED ALL SIDES. 00 <br />G. TRUSSES SHALL BE SPACED @ 24" OC. u P4 P (D <br />H. SEE SEPARATE TRUSS SHEETS FOR TRUSS FRAMING AND MATERIALS. PL, -4:� Z �:) <br />-e, <br />I. TRUSSES MUST BE BRACED ACCORDING TO THE LATEST EDITION OF W <br />THE BUILDING COMPONENT SAFETY INFORMATION "GUIDE TO GOOD <br />PRACTICE OF METAL PLATE CONNECTED WOOD TRUSSES" (SCSI) <br />J. TRUSS CONNECTION PLATES'EAGLE METAL PLATES'. <br />K. THE TRUSS PLATE INSTITUTE (TRIM (NER CAA 430) IS THE INSPECTION -In <br />AGENCY'' RESPONSIBLE FOR IN -PLANT INSPECTIONS. <br />L. TRUSS MANUFACTURER: TUFF SHED, INC. z U > <br />z <br />4. WOOD FRAMING z P4 <br />A. ALL WALL FRAMING MEMBERS SHALL BE HEM -FIR (HF) STUD GRADE OR <br />BETTER. <br />S. STUDS SHALL BE SPACED @ 16" OC. uJ <br />00 (D <br />C. FASTEN EXTERIOR WALL SHEATHING TO FRAMING PER MAILING M <br />U-) <br />SCHEDULE. 0 <br />CO <br />D. PROVIDE SOLID BLOCKING AT ALL HORIZONTAL JOINTS OCCURRING IN <br />BRACED WALL PANELS. <br />E. SHEAR WALL MATERIAL SHALL BE AS SPECIFIED IN SHEAR WALL < 0 <br />SCHEDULE. z (D F. SHEAR WALL NAILING SHALL BE AS SPECIFIED IN SHEAR WALL > LL (N 0 C) <br />SCHEDULE- < co j_� <br />N 3 CD M <br />5. SOIL LC) 7 Z < <br />0 <br />� <br />A. MIN. REQUIRED SOIL TYPE SHALL BE CLAY, SANDY CLAY, SILTY CLAY, OR R U) (0 F- <br />CLAYEY SILT (CL, ML, MH & CH). PRESCRIPTIVE ALLOW0 <br />ABLE SOIL a- . - C 0 n _J <br />Lu L- <br />BEARING PRESSURE USED IN DESIGN IS 1500 PSF AT 12" DEEP. VALUES CD U) F- <br />ARE F= co <br />ARE PER TABLE R401.4. 1. 0 Lu <br />B. IN THE EVENT OF THE DISCOVERY OF EXPANSIVE SOILS, THE SERVICES Z x < C) U.J <br />co a) (0 > <br />OF A SOILS ENGINEER MAY BE REQUIRED. (D a) B0 :R <br />C. ALL FOOTINGS SHALL BE FOUNDED ON UNDISTURBED NATURAL SOIL. I a- 0 (0 <br />D. IN THE EVENT EXCAVATIONS REVEAL UNFAVORABLE CONDITIONS, THE 0 Z <br />SERVICES OF A SOULS ENGINEER MAY BE REQUIRED. 0 Z Lu <br />>­ <br />LU Lu <br />6. PERMIT = <br />A. PERMIT APPLICATIONS, WHERE NO PERMIT IS ISSUED, SHALL EXPIRE Ju Lu W <br />PER LIMITATIONS SET BY LOCAL CODES. SECTION R105. 00- J <br />& JOB CARD REQUIRED TO BE AVAILABLE FOR SIGNATURE AT JOB SITE z 0 LL ox <br />Co CL F- 0 LU CO <br />GENERAL NOTES CD LU IL = — <br />z Lu Lu CIO Lu Lu <br />1. GENERAL J% x <br />z W M LL Ch <br />A. ERECTION PROCEDURES SHALL CONFORM TO OSHA STANDARDS. u- LL <br />3: W —_ < 0 Lu <br />BUILDER SHALL PROTECT ALL ADJACENT PROPERTY, STRUCTURES, = C) <br />TREES, UTILITIES, ETC. <Waco F- F-UjCOW <br />B. BUILDER IS RESPONSIBLE FOR SAFETY OF BUILDING DURING 0 z a: z z 1 <br />CONSTRUCTION. PROVIDE ALL SHORING OR BRACING AS REQUIRED <br />AND PER GOVERNING REGULATIONS. <br />Lu 75 LL < <br />C. ALL WOOD CONSTRUCTION CONNECTORS REFERENCED IN THIS W, = <br />DRAWING SHALL BE SINIPSON 'STRONG -TIE' OR EQUIVALENT INSTALLED F­ <br />PER MANUFACTURER'S SPECIFICATIONS. <br />IN CD <br />D. GREEN VINYL SINKER NAILS DO NOT MEET THE NAILING REQUIREMENTS 'r Y <br />00 <br />OF COMMON NAILS. o LLJ <br />71 z <br />C <br />2. PLYWOOD DIAPHRAGMS C,3 <br />C;3 <br />15/32° CDX PLYWOOD OR 7/16" OSB. <br />uJ L < 2 1 CWI) <br />W <br />3. MATERIAL EVALUATION REPORT IDENTIFICATION Q? m L) <br />I I U) 3: (jw <br />A. TRUSS CONNECTION PLATES BY EAGLE METAP�P, ER,"- 3: > <br />C:, "if <br />En to Li 5 Ci 'Wo <br />ICC-ES REPORT #ESR-1 082. � ,) C., __ ,, ". - WW <br />u- = Q� <br />i " 0 <br />B. SMARTSIDE SIDING BY LP CORPORATION PER <br />< CO <br />ICC-ES REPORT #ESR-1301. <br />D <br />C. HARDIEPANEL SIDING BY JAMES HARDIE BUILDING PRODUCTS PER 0 <br />ICC-ES REPORT #ESR-1844. <br />D. HARDIEPLANK LAP SIDING BY JAMES HARDIE BUILDING PRODUCTS PER p >: <br />]CC -ES REPORT #ESR-2290. <br />E. LAMINATED VENEER LUMBER (LVL) BY WEYERHAEUSER PER W <br />ICC-ES REPORT #ESR-1 387. <br />F. ASPHALT SHINGLES BY GAF PER lCC-ES REPORT #00 <br />ESR-1475. 0 of <br />G. HDU PRE -DEFLECTED HOLDOWNS BY SIMPSON STRONG -TIE PER Em4 <br />ICC-ES REPORT #ESR-2330. Drawn By: TS <br />H. SSTB ANCHOR BOLTS BY SIMPSON STRONG -TIE PER I <br />ICC-ES REPORT #ESR-261 1. Date: 10,19/19 <br />Checked By. - <br />Permit#: B1911-029 <br />Site Address: 1632 FU LTO N ST Date: <br />Owner: BODGE SONJA R RevIsed: <br />Tenant: [TenNamel Revised: <br />App. Date: 11/21/2019 .1- <br />Proposed Use: SFR DETACHED 7tle: <br />Description: CONSTRUCT A NEW 2 CAR GARAGE WITH <br />WORKSHOP PROJECT NOTES <br />Reviewed By: Date: ELEVATIONS <br />7/L,Pffice Set Job Site Set Fire/Planning Set <br />Scale: 1/4" l'-O" <br />s y M�­e Z7 M <br />i; �v L_ F- t: l Sheet: <br />REVIEWED FOR PE, <br />'FIJ 1,1 <br />A 'PPR0'ED <br />PqLAi\,1N1NG & C01"vil"MUNlTy 11, o. 11 <br />n <br />DE'v'ELOPMIENT DEPT <br />I`V <br />62 U e <br />TE <br />DAJ S1 <br />Slheet I of 3 <br />