Laserfiche WebLink
REPAIR IN <br />NECESSAI <br />NEAREST <br />SEALANT <br />_OPE HORIZONTAL LEG TO 10' MIN. <br />V.LF. <br />EXISTING OR NEW 5/8" TYPE W GYPSUM SHEATHING <br />AS REQUIRED <br />NEW WEATHER -RESISTIVE BARRIER: (2) LAYERS 60 MINUTE <br />GRADED' BUILDING PAPER (FORTIFIBER "SUPER JUMBO <br />TEX" OR EQUAL) <br />NEW SELF-ADHESIVE FLASHING MEMBRANE <br />(FORTIFIBER "FORTIFLASH" OR EQUAL) <br />NEW SELF-ADHESIVE FLASHING MEMBRANE <br />(FORTIFIBER "MOISTOP EZ-SEAL" OR EQUAL) <br />NEW VINYL SIDING TO MATCH EXISTING <br />EXISTING OR NEW HEADER TO MATCH EXISTING AS <br />REQUIRED <br />NEW VINYL "J" CHANNEL W/ WEEPS OR DRILL 316" <br />HOLES @ 12" o.c. <br />NEW 24 GA. METAL HEAD FLASHING, <br />SEE DETAIL BELOW <br />NEW CEDAR TRIM TO MATCH EXISTING, NOTCH TRIM <br />TO RECEIVE NAILING FLANGE AND ALLOW TRIM TO <br />LAY FLAT, <br />NEW BACKER ROD AND SEALANT <br />WINDOW FLANGE SET IN BEAD OF SEALANT <br />REMOVE EXISTING WINDOW AND INSTALL NEW <br />WINDOW TO MATCH EXISTING AFTER PERFORMING <br />WALL SHEATHING REPAIRS. FLASH PER DETAILS <br />NOTES: <br />DO NOT CUT OR PUNCTURE FLASHING AT FOLD <br />CONFIRM THERE IS NO CONFLICT BETWEEN NEW FLASHING OR TRIM <br />WITH NEW WINDOW OPERATION <br />Window Head Flashiii:11 w/ Cedar i <br />EXISTING OR NEW R-21 BATT <br />INTERIOR GYPSUM: REPAIR OR REPLACE WITH NEW AS <br />REQUIRED, PAINT <br />REINSTALL EXISTING OR INSTALL NEW SLIDING GLASS <br />DOOR AFTER WALL SHEATHING REPAIRS AND FLASHING <br />PER DETAILS <br />NAILING FLANGE SET IN CONTINUOUS BEAD OF SEALANT <br />NEW BACKER ROD AND SEALANT <br />NEW SELF-ADHESIVE (FORTIFIBER "FORTIFLASH" OR EQUAL) <br />FLASHING MEMBRANE <br />NEW CEDAR TRIM TO MATCH EXISTING, NOTCH TRIM TO <br />RECEIVE NAILING FLANGE AND ALLOW TRIM TO LAY FLAT. <br />(SEE ELEVATIONS) <br />NEW VINYL "J" CHANNEL CASING <br />NEW WEATHER -RESISTIVE BARRIER: <br />(2) LAYERS 60 MINUTE GRADED' BUILDING PAPER <br />(FORTIFIBER "SUPER JUMBO TEX" OR EQUAL) <br />NEW BASE FLASHING MEMBRANE (FORTIFIBER "MOISTOP <br />NEXT" OR EQUAL) <br />NEW VINYL SIDING TO MATCH EXISTING <br />EXISTING OR NEW 5/8" TYPE W GYPSUM SHEATHING AS <br />REQUIRED <br />CEDAR TRIM METAL <br />PER DETAILS HEAD <br />FLASHING <br />C <br />3/8" <br />SEALANT PER DETAILS <br />i <br />Scale: 3" 3' 0" <br />SOLDER ALL SEAMS, TYP. --� <br />HEMMED EDGE <br />EXISTING FINISH <br />FLOORING OR NEW <br />TO MATCH EXISTING <br />AS REQUIRED —7 <br />SET IN TOE BEAD <br />OF SEALANT <br />Q 2021 KILBURN ARCHITECTS, LLC <br />NEW BACKER ROD AND SEALANT <br />LAP JAMB "J" CHANNEL OVER SILL "J" CHANNEL <br />NEW 24 GAUGE METAL SILL PAN, SITE VERIFY AND CONFIRM <br />LAYOUT WITH ARCHITECT PRIOR TO FABRICATION <br />BRAKE HEMMED FRONT EDGE 5 DEGREES <br />i <br />REINSTALL EXISTING OR INSTALL NEW SLIDING GLASS DOOR <br />AFTER PERFORMING WALL SHEATHING REPAIRS. FLASH PER <br />DETAILS <br />NEW 24 GAUGE STAINLESS STEEL SILL PAN SET IN BED OF <br />SEALANT, SEE ISOMETRIC ABOVE. <br />NEW WATERPROOF DECK COATING AS REQUIRED, MATCH <br />TO EXISTING <br />EXISTING CONCRETE TOPPING SLAB, CONFIRM SLOPE%"/FT. <br />MIN, TO DRAIN <br />EXISTING SILL & TRIM OR NEW TO MATCH EXISTING AS REQUIRED <br />SEALANT <br />REMOVE EXISTING WINDOW AND INSTALL NEW WINDOWS TO <br />MATCH EXISTING AFTER PERFORMING WALL SHEATHING REPAIRS, <br />FLASH PER DETAILS <br />NEW BACKER ROD AND SEALANT <br />NEW VINYL "J" CHANNEL <br />REPAIR OR REPLACE WITH NEW INT. GWB AS REQUIRED, PAINT <br />EXISTING OR NEW R-21 BATT INSULATION AS REQUIRED <br />OR NEW 5/8" TYPE W <br />SHEATHING AS REQUIRED <br />OR NEW <br />R-RESISTIVE BARRIER: (2) <br />30 MINUTE GRADED' <br />1 PAPER (FORTIFIBER "SUPER <br />EX" OR EQUAL) <br />YL SIDING TO MATCH <br />I <br />F ADHESIVE MEMBRANE <br />3; <br />ROUND CORNER, OVER <br />R RESISTIVE BARRIER <br />3ER "FORTiFLASH" OR EQUAL) <br />tNER FLASHING (HALF SHEET <br />HER RESISTIVE BARRIER) PER <br />W.R.B. INSTALLATION DETAIL <br />fL "J" CHANNEL CASING, <br />0 EXISTING <br />1NCVV �,MJAR TRIM TO MATCH EXISTING <br />Scale: 3" V - 0" <br />NOTE: <br />1. Verify all conditions in the field. <br />2. All windows/doors to be replaced in -kind (typ.) <br />EXISTING OR NEW R-21 BATT INSULATION AS REQUIRED <br />EXISTING OR NEW 5/8`° T`YPE'XGYPSUM SHEATHING AS REQUIRED <br />NEW WEATHER -RESISTIVE BARRIER: (2) LAYERS 60 MINUTE GRADED' <br />BUILDING PAPER (FORTIFIBER "SUPER JUMBO TEX" OR EQUAL) <br />NEW VINYL SIDING TO MATCH EXiSiTNG <br />NEW SELF-ADHESIVE FLASHING MEMBRANE (FORTIFIBER "FORTIFLASH" <br />OR EQUAL) <br />NEW 12" BASE HEAD FLASHING MEMBRANE (FORTIFIBER "MOISTOP NEXT" <br />OR EQUAL) <br />NEW VINYL "J" CHANNEL CASING <br />fgmls�_RIM, <br />NEW BACKER ROD AND SEALANT <br />REINSTALL EXISTING OR INSTALL NEW SLIDING GLASS DOOR AFTER <br />PERFORMING WALL SHEATHING REPAIRS. FLASH IN SEQUENCE PER <br />DETAILS <br />SEALANT <br />REPAIR OR REPLACE WITH NEW INT. GWB AS REQUIRED, PAINT <br />NEW VINYL "J" CHANNEL CASING W/ WEEP SCREED OR <br />DRILL %6" HOLES @ 12" o.c. <br />NEW VINYL "J" CHANNEL CASING. NOTCH AND <br />INSTALL PER MANUFACTURER'S RECOMMENDATIONS <br />NEW 24 GA. METAL HEAD FLASHING <br />NEW SEALANT AND BACKER ROD <br />NEW SLIDING GLASS DOOR FRAME <br />NEW CEDAR TRIM TO MATCH EXISTING, NOTCH TRIM TO <br />RECEIVE NAILING FLANGE AND ALLOW TRIM TO LAY <br />FLAT. <br />NEW VINYL SIDING TO MATCH EXISTING <br />NEW VINYL INSIDE CORNER POST -MATCH TO EXISTING, FASTEN <br />PER MANUFACTURER'S INSTRUCTIONS <br />NEW VINYL SIDING TO MATCH EXISTING <br />i <br />NEW WEATHER -RESISTIVE BARRIER: (2) LAYERS 60 MINUTE <br />GRADED' BUILDING PAPER (FORTIFIBER "SUPER JUMBO TEX" <br />OR EQUAL) <br />EXISTING OR NEW R-21 BATT INSULATION AS REQUIRED <br />EXISTING OR NEW TYPE'X' GYPSUM SHEATHING AS REQUIRED <br />135 Lake Street South <br />Suite 250 <br />Kirkland, WA 98033 <br />Tel: 206.682.521 1 <br />Fax: 206.682. i 403 <br />wwwAiiburnarchitects.com <br />Scale: 3" V - Oro <br />70 <br />Scale: 3" m V - 0" <br />• <br />i z a#111110111 <br />low <br />Xi <br />Am3w2 <br />® 2021 KILBURN ARCHITECTS, LLC <br />