My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3706 WETMORE AVE 2021 Plans 2022-12-06
>
Address Records
>
WETMORE AVE
>
3706
>
Plans
>
3706 WETMORE AVE 2021 Plans 2022-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 1:38:50 PM
Creation date
10/19/2021 1:11:11 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
3706
Permit
B2101-058
Year
2021
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(D(D INSTALL STRAW WATTLES TO <br />INDICATE. LIMIT OF <br />CONSTRUCTION AND ALSO TO <br />BE USED IN LIEU OF FILTER - <br />FABRIC FENCE. <br />4- 2 4' <br />O �s DOWN SPOUT SPALSH BLOCKS <br />WITH 50-FOOT FLOW PATH <br />(2 TYP.) <br />House <br />uuu� <br />Roof downspout serves <br />upto M s f. of roof <br />JC <br />50' min. vegetated ( F <br />flow path <br />Splashblock <br />`�- Downspout extension <br />Splashblack <br />Source. King County: Department of Natural Resources,:1998 NOT TO SCAL€ <br />IMIUM <br />Typical Downspout Splashblock Dispersion <br />Revised December2016 <br />DEPARTM.cPJ:T OF <br />ECOLOGY Please see http'#111vw;2cy:Mfgov1.py,,ghthtrnf for copVrightnotice including permissions, <br />State of Washington limitation of liability, and disclaimer. <br />2019 Stormwater Management Manualfor Westem VVashington <br />Volume ,V - Chapter 4 -!Page 718 <br />_EXISTING SITE FEATURES AND BOUNDARY NOT: <br />EXISTING SITE FEATURES & BOUNDARY WERE PROVIDED BY <br />AMERICAN HOME PLANNERS OR EVERETT. SLOPE OF BACKYARD <br />RELATIVE TO ALLEY DETERMINED FROM ALLEY GOGGLE EARTH <br />STREET VIEW <br />32 <br />NOTES: <br />1. STRAW ROLL INSTALLATION REQUIRES THE <br />PLACEMENT AND SECURE STAKING OF THE ROLL <br />IN A TRENCH, 3"-5 DEEP, DUG ON CONTOUR. <br />RUNOFF MUST NOT BE ALLOWED TO RUN UNDER <br />OR AROUND ROLL. <br />2. STRAW ROLLS MUST BE PLACED ALONG <br />SLOPE CONTOURS. <br />3. SPACING DEPENDS ON SOIL TYPE AND <br />SLOPE STEEPNESS. <br />e <br />/./ AM IA nrAIY Oni I C <br />STAKED FILTER ROLLS <br />d <br />SLOPE <br />%SEDIMENT, ORGANIC MATTER, AND NATIVE <br />d SEEDS ARE CAPTURED BEHIND THE <br />ROLLS., <br />DRAINAGE <br />I[I <br />STA ITV WATTLES BMP C235 <br />N. T. S. <br />BMP T5 13 POST CONSTRUCTION SOIL IIA I Y AND DEPTH. - <br />ALL DIS77JRBE0 AREAS, (NOT OTHERWISE COVERED BY IMPERVIOUS AREA), ON AND OFF SITE, SHALL MEET THE <br />COMPOST AMENDED REQUIREMENTS OF BMP T5.13 IN THE 2016 SNOHOMISH COUNTY DRAINAGE MANUAL VOLUME <br />V, CHAPTER 5. <br />CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF TOPSOIL AND DUFF FROM THE PROPERTY <br />AMENDED TO MEET 7HE CARBON TO NITROGEN RA770 REQUIREMENTS, AND MEETING THE CONTAMINANT <br />STANDARDS OF GRADE A COMPOST <br />TOPSOIL DEPIHS SHALL HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT 774E DEPTH <br />OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. <br />SUE50IL BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORA77ON OF <br />774E UPPER MATERIAL TO AVOID STRATIFIED LAYERS WHERE FEASIBLE <br />I <br />Know what's below. <br />Calli 1 811 <br />two <br />,{ i business days <br />before you dig. <br />n <br />1-0 <br />0 <br />SWPPP <br />ELEMENT 1: MARK CLEARING LIMITS <br />OELEMENT 2. ESTABLISH CONSTRUCTION ACCESS. <br />0 ELEMENT 3: GONIROL FLOW RATES <br />0 ELEMENT 4. INSTALL SEDIMENT CONTROLS <br />ELEMENT 5. STABILIZE SOILS SOILS TO BE STABILIZED AS <br />LISTED IN THE COVER METHOD NOTES <br />G ELEMENT 6: PROTECT SLOPES CUT AND FILL SLOPES <br />SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT <br />WILL MINIMIZE EROSION. <br />OELEMENT 7• PROTECT DRAIN INLETS - NA <br />ELEMENT 6: STABILIZE CHANNELS AND OUTLETS <br />ELEMENT 9: CONTROL POLLUTANTS. ALL POLLUTANTS, <br />INCLUDING WASTE MATERIALS AND DEMOL177ON DEBRIS THAT <br />OCCUR ON -SITE DURING CONSTRUCTION SHALL BE HANDLED <br />AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE <br />CONTAMINA71ON OF STORMWATER. <br />10 ELEMENT 10. CON7ROL DE-WAIERING. NA <br />11 ELEMENT 11: MAINTAIN BMP S. <br />1 ELEMENT 12. MANAGE THE PROJECT <br />1 ELEMENT 13. PROTECT LID BMP S <br />LOT SIZE; 7500 SQ FT <br />LOT COVERAGE <br />& IMPERVIOUS, <br />(FOOTPRINT) <br />EXIST STRUCTURE: 1175 SF <br />NEW GARAGE: 576 SF <br />TOTAL: 1751 SF m 23.3% <br />UTILITY CONFLICT NOTE: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE <br />LOCATION, DIMENSION AND DEPTH OF ALL EXISTING UTILITIES <br />WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE <br />U77LI77ES AND SURVEYING THE HORIZONTAL AND VER77CAL <br />LOCATIONS PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />CALLING U77LITY LOCATE AT 1-E00-424-5555 AND THEN <br />POTHOLING ALL OF THE EXISTING UTILITIES AT THEIR LOCATIONS <br />OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR <br />NOT CONFLICTS EXIST. LOCA71ON OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br />INFORMATION AND ARE SUBJECT TO VARIATION. <br />CONSTRUCTION 8 UENCEa <br />1. ATTEND PRE -CONSTRUCTION MEETING <br />2. FLAG CLEARING/GRADING LIMITS <br />3. INSPECTION BY CITY OF EVERETT <br />4. EROSION CONTROL DEVICES AND RESOURCES TO COVER ALL SOIL, IN <br />CASE OF EROSION RISK, ARE TO BE ON THE SITE AT ALL 77MES <br />5. CLEAR AND GRUB WITHIN CLEARING/GRADING LIMITS <br />6. SITE GRADING <br />7 TEMPORARY COVER OR APPLY PERMANENT VEGETATION, WHICHEVER <br />IS APPROPRIATE <br />B. APPLY PERMANENT VEGETATION AND MULCH ALL DISTURBED AREAS <br />9. CLEAN-UP THE SITE. TEMPORARY EROSION CONTROL DEVICES MAY <br />BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR <br />AFTER THEY ARE NO LONGER NECESSARY <br />GRADING QUAN1177ES <br />CUT.• 25 CY <br />FILL: 250 CY <br />GRADING QUAN77IIES ARE ROUGH CALCULATIONS 7HAT <br />DO NOT TAKE INTO ACCOUNT SHRINKAGE OR SWELLAGE. <br />OWNER: GEORGE ARWAY <br />SITE ADDRESS: 3706 WETMORE AVE <br />EVERETT, WA 98201 <br />TAX I® (PARCEL) 0045 1402 5029 00 <br />LEGAL: <br />FRIDAYS 1ST ADD TO EVERETT BLK 025 <br />D-00 DLK 25 LOT 29 & 30 <br />0 <br />t <br />z <br />;- <br />PROTECT DISTURBED SLOPES BY MULCHING (2"-4° THICKNESS). THIS CAN BE DONE BEFORE OR AFTER PERMANENT SEEDING. IHE TYPES OF <br />MULCHES AVAILABLE ARE DESCRIBED BELOW (TAKEN FROM THE D.O.E. MANUAL): <br />STRAW - MOST COMMONLY USED IN CONJUNCTION WITH SEEDING. ITS USE IS RECOMMENDED WHERE IMMEDIATE PROTECTION IS REQUIRED AND <br />PREFERABLY WHERE THE NEED FOR PROTECTION WILL BE LESS THAN 3 MONTHS. THE STRAW SHOULD COME FROM WHEAT OR OATS, AND MAY <br />BE SPREAD BY HAND OR MACHINE. STRAW CAN BE WINDBLOWN AND MUST BE ANCHORED DOWN (ROLLING OR PUNCHING INTO SOIL, COVERING <br />WITH NETTING, SPRAYING TACKIFIER). CORN STALKS - THESE SHOULD BE SHREDDED INTO 4 TO 6-INCH LENGTHS STALKS DECOMPOSE <br />SLOWLY AND ARE RESISTANT TO WINDBLOW. <br />WOOD CHIPS/BARK CHIPS - SUITABLE FOR AREAS THAT WILL NOT BE CLOSELY MOWED, AND AROUND ORNAMENTAL PLANTINGS CHIPS <br />DECOMPOSE SLOWLY AND DO NOT REQUIRE TACKING. WOOD CHIPS MUST BE TREATED WITH 12 POUNDS NITROGEN PER TON TO PREVENT <br />NUTRIENT DEFICIENCY IN PLANTS (NOT NECESSARY FOR BARK). WOOD AND BARK CHIPS TEND TO WASH DOWN SLOPES OF MORE THAN 6 <br />PERCENT AND CREATE PROBLEMS BY CLOGGING INLET GRATES ETC. AND ARE THEREFORE NOT RECOMMENDED FOR USE IN THOSE AREAS. <br />WOOD FIBER - USED IN HYDRO -SEEDING OPERATIONS, APPLIED AS PART OF THE SLURRY. THIS FORM OF MULCH DOES NOT PROVIDE <br />SUFFICIENT PROTECTION TO ERODIBLE SOILS TO BE USED ALONE DURING THE HEAT OF SUMMER OR FOR LATE FALL SEEDINGS. WOOD FIBER <br />HYDRO -SEED SLURRIES MAY BE USED TO TACK STRAW MULCH. THIS COMBINATION TREATMENT IS WELL SUITED FOR STEEP SLOPES AND <br />CRITICAL AREAS NETS AND MATS - USED ALONE NETTING DOES NOT RETAIN SOIL MOISTURE OR MODIFY SOIL TEMPERATURE IT STABILIZES <br />THE SOIL SURFACE WHILE GRASSES ARE BEING ESTABLISHED, AND IS USEFUL IN GRASSED WATERWAYS AND ON SLOPES LIGHT NETTING MAY <br />ALSO BE USED TO HOLD OTHER MULCHES IN PLACE ITS RELATIVELY HIGH COST MAKES IT MOST SUITABLE FOR SMALL SITES. <br />GENERAL <br />1. ALL GRADING SHALL COMPLY TO CHAPTER 1E OF THE INTERNATIONAL BUILDING CODE AND SNOHOMISH COUNTY CODE CHAPTER 30.63B <br />GRADING <br />2. TESC. MEASURES SHALL BE INSTALLED PRIOR TO ANY SITE WORK (SEE ATTACHED DETAILED TESC. PLAN). <br />J. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS DURING EXCAVATION AND FILL OPERATIONS <br />4. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS WATER QUALITY REQUIREMENTS AND/OR CLEARING LIMITS MAY RESULT IN <br />REVOCATION OF PROJECT PERMITS, PLAN APPROVAL AND BOND FORECLOSURES <br />5. CONSTRUCTION ACCEPTANCE WILL BE SUBJECT TO A WELL ESTABLISHED GROUND COVER THAT FULFILLS THE REQUIREMENT OF THE <br />APPROVED CONSTRUCTION PLANS AND TITLE 30, SNOHOMISH COUNTY DRAINAGE ORDINANCE <br />6. ALL AREAS TO BE SEEDED SHALL BE CULTIVATED TO THE SATISFACTION OF THE COUNTY INSPECTOR. THIS MAY BE ACCOMPLISHED BY <br />DISCING, RAKING, HARROWING OR OTHER ACCEPTABLE MEANS. PERFORM ALL CULTURAL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE <br />SLOPE IF NECESSARY, SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES INTERCEPTOR DIKE/SWALES LEVEL <br />SPREADERS AND SEDIMENT BASINS SHALL BE INSTALLED PRIOR TO SEEDING. <br />Z ALL DISTURBED AREAS SUCH AS DETENTION FACILITIES ROADWAY BACK -SLOPES ETC. SHALL BE SEEDED WIN A PERENNIAL GROUND <br />COVER GRASS TO MINIMIZE EROSION. GRASS SEEDING WILL BE DONE USING AN APPROVED HYDROSEEDER OR AS OTHERWISE APPROVED BY <br />SNOHOMISH COUNTY. <br />6. IMMEDIATELY FOLLOWING FINISH GRADING PERMANENT VEGETATION (CONSISTING OF RAPID, PERSISTENT AND LEGUME) WILL BE APPLIED. <br />(MINIMUM 601 PER ACRE). THIS IS TO INCLUDE THE FOLLOWING: 207.ANNUAL, PERENNIAL OR HYBRID RYE GRASS 40%Y.Y. CREEPING RED <br />FESCUE, 409.E WHITE CLOVER, HYDROSEED REQUIRED. <br />9. FERTLIZER SHALL BE APPLIED AT 400,E PER ACRE OF 10-20-20 (10 POUNDS PER 1100 SQUARE FEET) OR EQUIVALENT DEVELOPMENTS <br />ADJACENT TO WATER BODIES SHALL USE NON -PHOSPHOROUS FERTILIZER. <br />10. ALL CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 2: 1. <br />11. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY PROTECTED WITHIN 24 HOURS TO PREVENT EROSION. HYDROSEED <br />PREFERRED. <br />12. DURING PERIODS OF WET WEATHER, THE GRADING CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO LIMIT SURFACE DISTURBANCE AND <br />PROTECT THE SITE GRADING AREA FROM EXCESSIVE RUNOFF EROSION. <br />13, AREAS TO RECEIVE FILL SHALL BE CLEARED OF ALL VEGETATION AND DELETERIOUS MATTER. <br />14. ALL FILL MATERIALS USED SHALL BE FREE OF VEGETATION AND DELETERIOUS MATTER AND SHALL NOT CONTAIN ROCKS GREATER THAN 6 <br />INCHES IN DIAMETER. <br />15. STRUCTURAL FILLS SHALL BE PLACED IN B" TO 10" THICK LOOSE HORIZONTAL LIFTS AND SPREAD UNIFORMLY. <br />16. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95999 OF MAXIMUM DENSITY AS DETERMINED BY MODIFIED PROCTOR <br />TEST (ASTM D-1557-70). <br />1 Z THE SURFACE OF ALL SLOPES SHALL BE COMPACTED. THIS MAY BE ACCOMPLISHED BY OVER -BUILDING THE SLOPES, THEN CUTTING BACK <br />TO FINAL GRADES, OR BY RUNNING THE COMPACTOR OVER THE SLOPE AS EACH FILL LIFT IS BEING PLACED. ALL SLOPES SHALL BE <br />COMPACTED BY 7HE END OF EACH WORKING DAY. <br />1& DISTURBED AREAS TO BE STABILIZED WITH HYDROSEED OR STRAW MULCH WITHIN 24 HOURS OF COMPLETION OF FINAL GRADING DURING WET <br />WEATHER. <br />TT <br />CITY ®V E\JFPF <br />DONNA BRESKE & ASSOCIATES <br />LAND USE PLANNING & CIVIL ENGINEERING <br />6621 FOSTER SLOUGH RD <br />SNOHOMISH) WA98290 <br />PHONE: 206-715-9582 <br />DON NAB@ DON NABRESKE.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.