Laserfiche WebLink
757r�H <br />BASICTOWNSHIP 28N. RANGE 5E. Wmlu <br />SECTIQNBT <br />I <br />_.. 1 ` SOIL. RETENTION, .RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN <br />CB/SUMP w.__ <br />_ .__ .._.. - `W .., 51 X4.5 INFILTRATION TRENCH <br />ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, <br />(TYP.) (SEE DETAIL) NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO DE REAPPLIED TO OTHER PORTIONS OF THE SITE HE <br />f� FEASIBLE. <br />EX, ROW SDCO SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED <br />-- ... <br />(TYP.) INTO A DRAINAGE FACILITY CAR ENGINEERED AS STRUCTURAL. FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE <br />(TYP.) <br />�6 �. w m FOLLOWING: <br />`-AREA <br />1 TOPSAIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10 DR'( HEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER <br />Y CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO Soo OR MATCHING. THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL <br />HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE FOOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED <br />TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION <br />OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. <br />2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL <br />. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CONTENT REQUIREMENTS: <br />THE ORGANIC CONTENT FOR PRE- APPROVED" AMENDMENT RATES CAN BE MET ONLY USING .COMPOS I" MEETING THE COMPOST <br />r .._ , SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, S ALES, AND PLANTER BOXES (P.9 ), WITH THE EXCEPTION( THAT THE <br />: - COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO <br />• �' �� 65, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY DE AS HIGH AS 35:1 FOR PLANTINGS <br />PROP. CONCRETE D/W 11 � COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION! <br />(1,211 SF) :" s b. CALCULATED AMENDMENT RATES MAu BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE, OR OTHER ORGANIC <br />/TRANS. ZONE ® � MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS <br />IDENTIFIED IN TABLE 220-8, TESTING PARAMETERS, IN VAC 173�-350-220. <br />(SEE DETAIL) <br />r AREA gA30'X3' INFILTRATION TRENCH THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. <br />` 3,798 SF "• ' (SEE DETAIL) <br />1. f IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED <br />i BELOW: <br />DEV. 4 <br />FLOW 1I, LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. <br />ARROWS EX• 2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT PRE- APPROVED" RATES, OR AT CUSTOM CALCULATED RATES BASED <br />®A (TYP.) BLDG, ON TESTS OF THE SOIL AND AMENDMENT. <br />. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED <br />° IF NEEDED TO MEET THE ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHER AT A DEFAULT `r RE -APPROVED "RATE OR AT A CUSTOM <br />I =� CALCULATED RATE. <br />l <br />I I I 4. IMPORT TOPSOIL MIX Or SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS. <br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE. SOIL THAT ALREADY MEETS THE DEPTH AND <br />i ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED. <br />_ I EX. SFR AREA A AREA B <br />I 1 STOCKPILE AND UNCOMPACTED, UNGRADED, <br />I AMEND SOIL IF UNDISTURBED <br />{ , NECESSARY "OPTION 3 <br />M q; <br />25' I I. <br />INGRESS, EGRESS ! <br />& UTILITY ( i <br />r_ ✓ x I DRAINAGE <br />E.AFC 200307035001 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT <br />i I HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION <br />I I 1 STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, <br />BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />i <br />I 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS <br />I 1 ff AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION <br />OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH <br />I UTILITY LSM'T EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC <br />I { AFh! 2003070.35001 I WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER <br />PRIOR TO COMMENCEMENT OF' BELATED CONSTRUCTION ON THE PROJECT. <br />'3 i <br />"E" 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OIL IN EASEMENTS MUST BE STAKED BY <br />r I R F LINE E PRIOR START( N <br />,, � ', �'..: _✓ SURVEY OR L AND GRAD RIO TO STARTING CONSTRUCTION. <br />1 --_ f MAIIMI <br />. _ . ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO <br />\ a ..,_.. ..,.... ; __.__..._ +_ :. I `' STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE <br />r t, <br />r PROJECT. <br />{ r :- _c, . <br />c µ _ =ate S <br />� t Ld 75TH ST SE <br />r <br />INFILTRATION TRENCH NOTE. - <br />CONTRACTOR TO FILL ANY UP --GRADIENT <br />AREAS OF THE PROPOSED INFILTRATION <br />TRENCH IF NEEDED TO ACHIEVE A 1-FOOT <br />SEPARATION BETWEEN BOTTOM OF TRENCH <br />AND WATER TABLE/HARDPAN. <br />VARIES <br />ASPHALT A TRANSITION ZONE SHALL <br />OR CONCRETE ONLY BE INSTALLED ON THE <br />2'— <br />, DRIVEWAY DOWNSLOPE SIDE OF NEW <br />' CONCRETE OR ASPHALT <br />LA�aDCAPiN� DRIVEWAY AREAS. <br />DRAIN ROCK OR <br />SUBGRADE MATERIAL <br />AMENDED SOIL <br />REFER TO SHEET 4 <br />FOR SPEC: <br />TRANSITION DETAIL <br />AAA <br />NOT TO SCALE <br />(AS NEEDED SEE NOTE ABOVE) <br />PLAN 4" RIGID OR 6" <br />VIEW FLEXIBLE <br />NITS PERFORATED <br />PIPE <br />INFILTRATION <br />TRENCH <br />4" RIGID OR 6" <br />FLEXIBLE <br />9LE PERFORATED <br />I PIPE <br />A <br />Em <br />SUMP <br />W/SOLID <br />LID <br />ROOF <br />DRAIN <br />OVERFLOW <br />SUPPORT BLOCK 4-1 <br />WASHED ROCK 1 1/2" .3/4" - 5' MIN <br />MIN CB SUMP <br />VARIES 1' W/SOLID LID <br />FINE MESH MIN <br />SCREEN <br />FILTER COMPACTED BACKFILL <br />FABRIC <br />61� �M,, <br />4" RIGID OF 6" <br />FLEXIBLE <br />PERFORATED PIPE <br />6" <br />WASHED ROCK <br />24" �. <br />1 1 /2,>_3/4" <br />..`PERFORATIONS <br />5 <br />12"F <br />DEGREES FROM <br />1 _ <br />BOTTOM OF PIPE <br />fC SECTION A. <br />� <br />G.i� ;VARIES-! <br />NTS <br />INFILTRATION TRENCH DETAIL <br />NOT TO SCALE <br />T <br />I <br />z <br />0 <br />C`1 <br />0 <br />I <br />o <br />L� <br />_00 <br />Ip <br />