r
<br />NOTES: i SIDING PER ELEVATION k- 1. INSTALL W.R.B. LINER (EXTEND it k - 6. INSTALL S.A.M.2
<br />1. 2. ALL SEAMS TO
<br />BE TO BE MIN
<br />FUI2 Y SQEDERED4 GAUGE E FINISHED GALVANIZED STEEL. �p� N
<br />MATERIAL ALL .PAS LEAVINGFLANGE ON / �, _ - FURRING r OVER TOP OF VENT V„ '
<br />1 3. SIZES. VARY TO FIT EACH APPLICATION
<br />y BOTTOM I �r OVER HOLE 9° MIN. PAST 77 #Y'.
<br />4. C01'dTRAC"F01� TO SUPPLY SAMPLE. � � EDGE LOOSE)- l '- FLANGE'• y
<br />j I €. INSTALL W.R.B. LINER PIECE
<br />*5ENSURE S.A.M.2 OVERLAPS ONTO W.R.B. LINER 2" MIN. -ABOVE, \ PRIMARY W.R.B. \ VENT FLANGE @ALL SIDES}. - 7. INSTALL PRIMARY W.R.B..:
<br />2. INSTALL HOOD FLANGE __� I I LEAVE BOTTOM OF LINER
<br />BELOW &SIDES. USE ROLLER TO APPLY S.A.M.2 TO FIT 6"MINT T: rl _ LOOSE T"O ALLOW PRIMARY y / TO STRUCTURE, TUCKING 4
<br />6. APPLY SEALANT-5 @ ALL LOOSE W.R.B. JOINTS FOR Aj BARRIER. WALL ~ �` ` � _ . _ __ _._ S:A.M.2* 7 h� UNDER W.R.B. SILL LINER
<br />Y q{; , ��7 W.R.B. TO BE INSERTED ,;\l
<br />ASSEMBLY u 7�
<br />V I ? _{ UNDERNEATH
<br />„MIN. SEALANT-5
<br />i
<br />W.R.B. LINER - �I _
<br />�� �- , I - i� � - � � ".y - SEALANT-5
<br />EXTEND 9'MiN" PAST VENT \� 3• INSTALL REMOVABLE
<br />( 3°FLANGES 9� ` VENT HOOD
<br />FLANGE ON ALL SIDES.)
<br />Q r i
<br />NG ENVELOPE
<br />SPRAY FOAM FROM \-1
<br />�> T{� �.� 8. CONTINUE INSTALLING �E €��
<br />INSTALL S.A.M.2 - TO FIT" X-'
<br />INTERIOR TO SEAL / i AT BOTTOM, ''HEN � �� { TL � � � _.. -_ PRIMARY W.R.B. (MAINTAIN
<br />W.R.B. LINER , r i r
<br />AROUND PIPE OVER SIDES, THEN _ Z_ t �� y'A�, 6"MIN. HORIZONTAL AND
<br />j<
<br />TOP OF VENT TO `I O FIT `�' S - -�
<br />- c e SHEATHING
<br />_L�,, �,17 { �' \\ l VERTICAL LAPS, TYPICAL)
<br />FLANGE* FIT ,, -- ' ,,PRAY FOAM
<br />FLANGE i OVER WALL X r - 4. INSTALL S.A.M"2 AT - _ �� Y r
<br />_. INSTALL FLANGE VENT
<br />� �� ? STA FLA
<br />X ASSEMBLY F�, \ PENETRATION
<br />BOTTOM, THEN \a�: y` yj � i - 6. INSTALL. .. ti ; �`�\ B.E.E. CONSULTING, LLC.
<br />J-_SIDES, THEN TOP y, C .�. j PRIMARY OVER._,
<br />METAL VENT PER ARCH � r �` 7r�/�
<br />ONTO THE HOOD�� � ,y i ��-. _ ;iLr 3. AIR BARRIER FOAM �~
<br />�� �� " W.R.B.W.R.E3. LINER ~,� � < 170 W. DAYTON, SU7E 206
<br />uh r, _ �, - FROM INTERIOR TO SEALANT"-5
<br />{ 1., FLANGE AND VU.R"B. ��_VI - 1
<br />< -HEM LINER ;", ��' j jT E1��i�QD9��0 98020
<br />" `------- 2 % {�P '�k' � 7. SEAL SEAMS NOTES
<br />PER ARCH
<br />f �� 7 ~' SEAL AROUND PIPE
<br />f'
<br />3 FLANGES - i {� y 1 WITH 1
<br />��
<br />/ 'HEM 1X H1- 2. APPLIED S.A.M.2 TO BOTTOM,
<br />4 SEALANT - FLANGEISTHENQP OF
<br />7 r.
<br />J)d2 3900
<br />FLANGES. 6MIN
<br />AND EXTEND IIP
<br />-
<br />5. INSTALL S.A.M.2 OVER fax (425 712 6606
<br />�
<br />24oa. �, ENT SHROUD7%' SIDES OF VENT FLANGE*
<br />(/ � r � � -j(�S �A -(-(_ -C �(� � , � '�r �}
<br />i
<br />1
<br />NOTES:
<br />< I 7 i Zt 1. MAT"ERIAL TO BE 24 GA.. PAINTED STEEL.
<br />y„'/ - - �~ ---/ 2. ALL SEAMS TO BE FULLY SOLDERED.
<br />�� 3. TQP OF HOOD TO BE ANGLED 15°MIN.
<br />PRIMARY W.R.B.
<br />X�X ' i Yz"N�IN L 4 FLANGES TO BE 3°'MIN. ON ALL SIDES.
<br />LAPPED OVER �/ ; i 5" CON"FRACTOR TO SUPPLY SAMPLE.
<br />XX
<br />V `-' ' h FLANGE PLATE &r 6. HOOD DESIGN BY OTHERS, TO INCLUDE
<br />- - ° „r ° ✓ S.A.M. (MAINTAIN �/ r __ i i l' `I° BIRD SCREEN AT BASE OPENING.
<br />S.A.M.2*
<br />6"MIN. HORIZONTAL CAL( ___- I '�,' 4 THEBOTTOMOF VENT LINER - ABOVE, BELOW X . / �, < ` 7. *ENSURE 2" MIN. OVERLAP ONTO W.R.B.
<br /><� LAPANDS YPICAL} �� T. / �7 N Bd Q &SIDES
<br />�~
<br />PRIMARY W.R.B. II � r �'
<br />u �� �i FLANGE.
<br />TUCK UNDER BASE �� 7s - FURRING
<br />`,Xx� ub�
<br />Z 5. INSTALL PRIMARY SEALANT-5
<br />MAINTAIN 6"tv1fN. ` . 6 MIN �' W.R.B.uj
<br />�! RTUCK
<br />Q CLINE€,���-%1 II
<br />( h \ �~7 r 6"MIN., I
<br />OF W.R.B. LINER r 7
<br />HORIZONTAL AND - -- SEALANT-5 1 fly~<� -- SIDING PER ELEVATION
<br />VERTICAL LAPS, y~Ay r NOTES:
<br />TYPICAL /` 1.1�\N� 1. INSTALL DRAINAGE PLANE AND SEALANT-5
<br />i
<br />F SIDING PER WALL ASSEMBLY. (NOT
<br />REMOVABLE SHOWN FOR CLARITY) A PRIMARY W.R.B
<br />. .
<br />VENT HOOD 2. FRAMING PER ARCH
<br />I�w. - -
<br />300.01 ISOMETRIC. REMOVABLE GANGED HOOD VENT 300.02 `� Y. REMOVABLE HOB N � SECTION. REMOVABLE O VEND � � � � _� I
<br />(TYPICAL) - (TYPICAL) - (TYPICAL) _ (TYPICAL)
<br />SCALE: TS SCALE: NTS SCALE: NTS SCALE: NTS
<br />© COPYRIGHT BEE CONSULTING © COPYRIGHT BEE CONSULTING © COPYRIGHT .BEE CONSULTING ©COPYRIGHT BEE CONSULTING 0
<br />1. INSTALL 5. CONTINUE INSTALLING /'f ??; 5. CONTINUE INSTALLINGLWL
<br />LD W.R.B.B. LINER PIECE i r 1. INSTALL W.R.B. LINER PIECE - 7 " / r /
<br />_ -i~, 1. INSTALL W.R.B. LINER PIECE 7 PRIMARY W.R.B. (MAINTAIN _ - : _- 1. INSTALL W.R.B. LINER PIECE _ i L ! 7',, PRIMARY W.R.B. (MAINTAIN
<br />OVER HOLE (9"MEN. PAST r OVER HOLE (9"MIN. PAST j tl - F ._ r `' ~ 6"MIN. HORIZONTAL AND J
<br />_ OVER HOLE (9` oil'\. PAST l , r ��r� � - �. 'n OVER HOLE- (9' MIN. PAST r ��7,_:l {- 6"MIN. HORIZONTAL AND
<br />QUICK FLASH FLANGE is ALL _ ;' r li `°' 6. INSTALL S.A.M.2 QUICK FLASH FLANGE CAD ALL ;l y= - 5. iNSI"ALL S.A.M.2 �1-7� U F A 9 FLANGE VERTICAL LAPS TYPICAL �YT �'f7 \ -
<br />,< _ ' �F ,r` „� •%� a ;~, � 1 r\ ry Q ICK L SI L NGE � ALL ,�� /�y_ , , ) / , QUICK FLASH FLANGE ®ALL , y._ l �7 7�.;,\~_ VERTICAL LAPS, TYPICAL}
<br />c OVER TOP OF AC X' , OVER TOP OF VENT r."r\'' ~
<br />r SIDES}. LEAVE BOTTOM Ooi^ ,•�','y _ SIDES}. LEAVE BOT'f0€vi OF \-'. „ SIDES}. LEAVE BOTTOM OF SIDES). LEAVE BOTTOM OF
<br />i / PORT VENT FLANGE h,, / y_ , % . _t T _ ) s " y
<br />LU
<br />LINER LOOSE TO ALLOW [ LINER LOOSE TO ALLOW FLANGE* LINER LOOSE TO ALLOW\; ,t 'rl�: `J 7 LINER LOOSE TO ALLOW _ -7 /7
<br />'_Al,J�"�, G f�l _ ln�r,u.,) f :y_ r A� 'S� '%I�l 'ter-N,�1!."h/t --,C 7,; h _
<br />PRIMARY W.R.B. TO BE � ,r ,' � T_ PRIMARY W.R.B. TO BE // ~' ,, >`r �_ �. r ;� �% SEALANT-5
<br />� / � -� �~ PRIMARY W.R.B. TO 8E i� ;\ � � �7�-�-rool�
<br />�� �, � � PRIMARY W.R.B. TO BE
<br />2 INSERTED UNDERNEATH INSERTED UNDERNEATH �i INSERTED UNDERNEATH �� -1 INSERTED UNDERNEATH �.`
<br />y
<br />�TTr 1` � r �
<br />\� 1� 1, 4" -1-
<br />SEALANT-5
<br />N ._�.ry_, �y ��
<br />2. I€NSTALL SEALANT"-1 AROUND >� i%'l' __._'� _ -_- 2. INSTALL SEALANT-1 AROUND .° �� {*!,�~,;. l °
<br />PIPE,
<br />/ /� PIPE 6 It�IN.�# % \
<br />3. AIR BARRIER FOAM FROM / -r
<br />/ r
<br />INTERIOR 'I"O SEAL AROUND ;~ � 6.
<br />IN.
<br />I
<br />- INSTALL QUICKFLASH-
<br />PIPE 7 y DEVICE OVER OPENING
<br />/ f
<br />,
<br />T X/ SIZE &TYPE MAY ' /
<br />X 1
<br />r 4. INSTALL AG PORT VENT l `��; 7. INSTALL PRIMARY W.R.B. ( = - ;. INSTALL PRIMARY W.R.B,
<br />�i
<br />x J� i'�H' �� �� TO STRUCTURE, TUCKING " VARY PER APPLICATION) YV _,r 6. INSTALL
<br />H ;'` TO aTRUCTURE> TUCKING _ „rr ;. _ _ 2. INSTALL QUICKFLASH NOTES,' %, _ 2" INSTALL QUICKFLASH 7��_ `'7\
<br />' �. UNDER W.R.B. SILL LINER %rl / UNDER W.R.B. SILL LINER �'Nl T/� DEVICE OVER OPENING ' DEVICE OVER OPENING \ y< Z � FURRING PER
<br />NOTES: //'„' � � rh % � 1. ROD &SEALANT-1 BETWEEN BLOCKING AND ,1 1� 7
<br />T 7 ~ _v� WALL ASSEMBLY
<br />1. MATERIAL 0 BE MIN 24 SIZE &TYPE MAY
<br />i � � ( SIDING. </� (SIZE &TYPE MAY
<br />-- -% /% . - VARY PER APPLICATION) 2. CONDUIT PIPE MUST BE WATER TIGHT a / H/ ' VARY PER APPLICATION) q�-r
<br />GA.. PRE FINISHED STEEL. {_- -_. SEALANT"-5 � � � SEALANT-5 / `n l
<br />i V'- ,.- i �1�iY r , `''; FLEXIBLE CONDUIT.
<br />; 2. ALL SEAMS TO BE FULLY � 'y � / � rl/ 1.�`
<br />1, , �_, 3. INSTALL S.A.M.2 OVER 3. INSTALL S.A.M.2 OVER
<br />3. TOP OF HOOD TO BE - 7- / (,A 7 BOTTOM, THEN SIDES, r BOTTOM, THEN SIDES,
<br />ANGLED 15'MIN.~%
<br />_ �T i A AND LAST OVER TOP AND LAST OVER TOP
<br />4 FLANGES TO BE 3'°MIN. ONV, �4 r\, �_�, /� r �,'' THE UNDERSIGNED HAS PROVIDED 4'DGEN'i
<br />T, ,-,: ~,~J -�� OF QUICKFLASH OF QUICKFLASH r � L. I-4til
<br />ALL SIDES. /�, , \.y,� - g• CONTINUE INSTALLING -'y_� � � ,/�,� , 7. CONTINUE INSTALLING /_ � _ � ��,- 7. INSTALL ADDITIONAL ,
<br />5. CONTRACTOR TO SUPPLY ,, r._,1 PRIMARY W.R.B. BY LAPPING 1� A DEVICE DEVICE a, y�z �,� y� 1 PRIMARY W.R.B. BY LAPPING �' � JJ FURRING AS NEEDED
<br />ARCAPPROfRINTETOSATISFYTHEREOUIRCMENTSOFRCW6 55.005THROUGHRCN.64,55.090,
<br />SAMPLE. \r�; OVER VENT AREA &TRIMMING ,- r��77 \\N OVER VENT AREA 8c _{<'r, �H�' TO CREATE BASE
<br />\; f- 6. HOOD DESIGN BY OTHERS, n_1~/ �`+� t� AROUND VENT* y _L\ { . l TRIMMING AROUND VENT*
<br />r L,' / FOR BLOCKING
<br />7 { Ty , �' r� ii 's i '" . Y / �T 4. INSTALL PRIMARY W.R.B. _ -
<br /><I TO INCLUDE BIRD SCREEN y 7 �r_7
<br />',fir --r,��-~r i�T�r ~,;�1 -1���� �r�r-� ;'rl,r _:� ��'-Ti, ;. 4.INSTALL PRIMARY W.R.B.
<br />' ,y , r'_� v 7 _l l -rr7 r' r,'l TO STRUCTURE, TUCKING ��,
<br />A7 BASE OPENING. A,, , MAINTAIN 6"NIIN. HORIZONTAL €' _, �, MAINTAIN 6"°MIN" HORIZONTAL ;r: i_l l G _, i TO STRUCTURE, TUCKINGv., _.
<br />r T �,r ~/� =/ ;_�,�\b 7, / G: , S. INSTALL PRESSURE
<br />7. *ENSURE 2 MIN. OVERLAP \ r;-. _ AND VERTICAL LAPS, TYPICAL i �_. ry ���� %� AND VERTICAL LAPS, TYPICAL �; % N'� UNDER W.R.B. SILL LINER ` 7�' UNDER W.R.B. SILL LINER - �r,f �-
<br />T r�, _ T-r
<br />/> ONTO W.R.B. LINER -{�._ i , A �i /, - ; !=
<br />f� ,\�, ",,/ V l� 1, � ' ,��7�. L� >h� ' t -' _ �._ � ONETOP OF TED OFURIRING.
<br />ABOVE, BELOW & SIDES \'�'*` �~�,_ SEAL,4NT-5 /~ SEALANT{ SLOPE P OF
<br />� - BLOCK BY 10°.
<br />4. INSTALL S.A.M.2 OVER
<br />d
<br />_�_% ~;,; •...� r ;�7\"''����'-`_ i -�r_ QUICKFLASH DEVICE
<br />,
<br />S �; * ,..� _- SEALANT STARTING WITH BOTTOM y -�Tr
<br />5. INSTALL S.A.M.2 OVER �h AL 5 �� -� \ �r - r_ r�- - SEALANT-5 � '� r � � � NOTES a' ;
<br />N ,� S r n'~� x�
<br />AC PORT VENT 6"MIN �� THEN SIDESMIN.
<br />6°°l + 7{ J _ta 1. TRIM FLASHING AT P.T. BLOCKING e�
<br />STARTING WITH BOTTOM
<br />NOTES (STEP 8) AS REQUIRED BY ARCHITECT. � x�
<br />THEN SIDES 2. SEALANT-1 AROUND PIPE WHERE IT
<br />- 1. ROD & SEALANT-1 BETWEEN BLOCKING AND
<br />F
<br />PENETRATES BLOCKING. AND ROD & F
<br />SIDING. SEALANT-1 BETWEEN BLOCKING AND p y/
<br />'r 2. ENSURE 2" MIN. OVERLAP ONTO W.R.B. LINER SIDING. ��1` � AZ �44
<br />ABOVE, BELOW & SIDES u
<br />303 ASSEMBLY: AC PORT PENETRATION 304 ASSEMBLY' Y-8" PFE PENETRATION 30 ASSEMBLY. CONDUIT PIPE PENETRATION('306 ASSEMBLY. PE AL HOSE BIB
<br />(TYPICAL) (T YPOCAL) - _ _
<br />(TYPICAL) (T1�PGCAL)
<br />SCALP €NT S SCALD: PATS SCALP: NITS SCALP: NTS
<br />©COPYRIGHT BEE CONSULTING ©COPYRIGHT BEE CONSULTING ©COPYRIGHT BEE CONSULTING ©COPYRIGHT BEE CONSULTING
<br />/ ! PRIMARY W.R.B.
<br />�\
<br />1. INSTALL W.R.B. LINER PIECE SEALANT-5 ,,;_ 1. INSTALL W.R.B. LINER PIECE � �_ /,_ � / � ^°� _ SIDING PER ELEVATION
<br />r 1. INSTALL W.R.B. EWER PIECE �-_ / I
<br />OVER HOLE (9"'MIN. PAST `r,7- OVER HOLE (9"MIN. PAST -------------
<br />• .. 7' �y OVER HOLE 9`°MIN. PAST--
<br />_ - 1T % QUICK FLASH FLANGE L"" .r \----
<br />BLOCK C�i ALL SIDES}. LEAVE y QUICK FLASH FLANGE O ALL _ b' A FURRING
<br />ON
<br />;, / .: , \, Q A � AL �� 6 h.1Tl.
<br />BOTTOM OF LINER LOOSE TO /' S L? � % - - y : -%\. 1 ,.- i r 5. INSTALL HEAD \\ Al a.
<br />SIDES . LEAVE BOTTOM OF
<br />ti
<br />,. , 6. INSTALL HEAD ly , ; .; h ) � /- , � SIDES). LEAVE BOTTOM OF � _ � _ 4
<br />_.- \ X / ,i 5. INSTALL PRIMARY W.R.B. T } _ i _ SEALANT-b a
<br />ALLOW PRIMARY W.R.B. TO BE � FLASHING WITH �; ' LINER LOOSE TO ALLOW " � FLASHING IN BED OF � � � � � r
<br />X` _\ . i/ ;1 TO STRUCTURE, TUCKING �a _h\Z-7 `. LINER LOOSE TO ALLOW r,[SEALANT-5\ ,sa. t... _ - - --- ------
<br />INSERTED UNDERNEATH yr END DAMS �� PRIMARY W.R.B. TO BE � ,T/Z PRIMARY W.R.B. TO BE /
<br />yy UNDER W.R.B. SILL LINER \`r Yz°°MIN. NOTES S
<br />ry INSERTED UNDERNEATH iyr T+
<br />� �r 1-7
<br />l SEALANT-5 7\y- � INSERTED UNDERNEATH i � � \_-_ / � --_ �� 1. FRAMING PL=h' ARCH
<br />>�, ! � , /-� � , � � _7 - - 2. AIR BARRIER FOAM INSIDE
<br />HEAD FLASHING
<br />2. INSTALL PT BLOCKING (OR � r4 �� � % r / � � � / � ' \� � QUICKFLASH DEVICE
<br />-- � f�, � � WITH END DAMS
<br />METAL HAT CHANNEL AND
<br />RAILING ATTACHMENT
<br />-- -- b. CONTINUE INSTALLING � / �. �/I �.� __. � _ __-- S.A.M.2
<br />PRIMARY W.R.B. BY LAPPINGOVER VENT
<br />/ 4. INSTALL S.A,M,2 OVER ' 2. INSTALL QUICKFLASH ' ROUND VENTEMAINTAINfvING %r V V I e�; /'-_. ___ ___ W.R.B LINER 3.29.2019 I, HUD FG e� AF°PLICa°�a ��%d
<br />DEVICE OVER OPENING ( "/ V =
<br />X SIDES OF BLOCKING AND r` -7. INSTALL PRIMARY W.R.B. �y / SIZE & TYPE MAY %r-ril ~ram q .-_ 6. INSTALL PRIMARY tN.R.B.
<br />CdNTINUE ONTO W.R.B. h ( 6"MIN. HORIZONTAL AND - / r -___ ELECTRICAL 11.7.2�11G CCSTE;IJCT�C� SST
<br />_ TO STRUCTURE, TUCKING VERTICAL LAPS, TYPICAL X V ��-_- ELECTRICAL BOX PREFORMED
<br />LINER VARY PER APPLICATION} X ) fi' 2. INSTALL QWCKFLASH DEVICE _ ; TO STRUCTURE, TUCKING
<br />UNDER W.R.B. SILL LINER / %. - -_-_ -_
<br />.�r_ �( ) /
<br />�. OVER OPENING SIZE & TYPE �l UNDER W.R.B. SILL LINER �- FLASHING BY QUICKFLASH 07.12.2®1c� CCV�P SET
<br />< �, X _ / MAY VARY PER APPLICATIONT �� �' - -
<br />y � ;�,- � I 3. APPLY AIR BARRIER /'
<br />SEALANT-5 FOAM BACK OF BOX -_ ---
<br />S.A.M.2 y.'X SEALANT-5 X �,/ F,'� A"; Lj?' _ - SEALANT-5 ���V - _ �C � C�
<br />5r tis� X _ SET
<br />3. INSTALL S.A.M.2 OVER y l'' Ali SEALANT 5 Q3.01.201ei 75% C�
<br />T 77
<br />3. INSTALL S.A.M.2 AT THE 7\i `��A �� l'r�: BOTTOM, THEN SIDES, ,- -
<br />> BOTTOM OF BLOCKING
<br />y 7 y r AND LAST OVER TOP r - SIGHT FIXTURE
<br />OF QUICKFLASH y -
<br />Z S. CONTINUE INSTALLING 6'"MIN. , T -
<br />m<
<br />''� DEVICE f - 7. ADDITIONAL VERTICAL FURRING \ - MOUNTING RING
<br />={ 6"MIN. HORIZONTAL AND _ 7. INSTALL SIDING PER /7 AS NEEDED TO ATTACH SIDING �__
<br />PRIMARY W.R.B. (MAINTAIN
<br />7 WALL ASSEMBLY y , l7 Ty i�� PER WALL ASSEMBLY GASKET
<br />VERTICAL LAPS, TYPICAL
<br />t ' `� `% `7'
<br />) `r ,.-- _ 4. INSTALL S.A.M.2
<br />5. OPT OF BLOCKINGOVER \ r l= ,I j', OVER TOP OF VENT ✓_ -- 4. INSTALL BLACKING \, \ ":- 8. C aNTINUE INSTALLING PRIMAR f
<br />X �T y j'; _ i /, a, �; ,,; y \ / e P.T.fPREPRIMEDjCEDAR BLOCKING PER ARCH P.E.: JIfT1 C.Ffel6ETg ENERGY: TOII6tali C�SP6a0f
<br />AND CONTINUE ONTO - FLANGE AROUND W.R.B. BY LAPPING OVER VENT _- _
<br />r E SEALANT 5 \_ ?, ," / /
<br />AREA &TRIMMING AROUND \ M.: J�rT1 C. ueeEirla DRAFTER: Stephen PQllerl X 8. LINER � _ ' ' _ 8. INSTALL FACE PLATE � �! PENETRATION �� " �
<br />WITH € GASKET PER ARCH _ ;., BLOCKING. (MAINTAIN 6"MIN. j -_ _ _. S.A,M.2 _-- - n iiY hr if HORIZONTAL AND VERTICAL
<br />LAPS, TYPICAL) ��T ROD & SEALANT-1 AT BASE AND SIDES OF BLOCKING
<br />-�
<br />Ca CC3PYEZIC�H_N BEE CONSULTING
<br />k� SIDING PER ELEVATION
<br />6 MIN ' 6"MIN. _ - - SEALANT-5 --',\ I. THESE DRAWINGS ARE FOR GENERAL ARRANGEMENT OF MATERIALS ONLY,
<br />LAPS 6 MIN. y" /� i I - - --- W.R.B. LINER
<br />LAPS k. \ 6' M�! T 1� SITE CONDITIONS GOVERN. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS,
<br />NOTES: NOTES - _ - -- - - SEALANT-5
<br />1. PROVIDE DRAINAGE CLEARANCE BETWEEN 1. GASKETED LIGHT FIXTURE (VARIES PER ARCH) FOR AIR \\ __
<br />HEAD FLASHING & SIDING. BARRIER -/ FFURRINGA 2. APPLY T SIDES
<br />. -1 BETWEEN BLOCKING & i
<br />.- -
<br />SIDING A? SIDES AND BASE OF ATTACHMENT. 2. ROD &SEALANT-1 BETWEEN BLOCKING AND SIDING r
<br />I PRIMARY W.R.B. LAPPED
<br />3. *IF METAL ]HAT CHANNEL IS USED IN PLACE
<br />-.9__
<br />OF BLOCK THE.A.149 S.±AY BE OMITTED. UNDER W.R.B. LINER BASE PENETRATION
<br />3 �ASSEMBLY-o AILING ATTACH 308 ASSEMBLY: L ALL OUTLETS 309
<br />ASSEMBLY: MOUNTED SECTION: MOUNTED LIGHT
<br />(TYPICAL) _ (TYPICAL) (ALARM PULL & ILA ) y (TYPICAL} - (TYPICAL) _
<br />- SHEET.
<br />SCALE: NTS SCALE: NTS SCALP: NT S SCALE: {ITS
<br />©COPYRIGHT BEE CONSULTING ©COPYRIGHT BEE CONSULTING ©COPYRIGHT BEE CONSULTING ©COPYRIGHT BEE CONSULTING BE300