My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2021 Utility Plans 2022-10-27
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
Utility Plans
>
3800 RIVERFRONT BLVD 2021 Utility Plans 2022-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 2:42:04 PM
Creation date
10/22/2021 8:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Permit
PW1903-048
Year
2021
Notes
Everett riverfront development
Address Document Type
Utility Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />a> <br />I <br />0 <br />0 <br />0 <br />0 <br />a� <br />I <br />0 <br />0 <br />z� <br />0 <br />0 <br />a <br />CL <br />iO <br />N <br />Ln <br />I <br />cv <br />0 <br />N <br />N <br />U <br />0 <br />73 <br />40 <br />35 <br />30 <br />25 <br />20 <br />0 <br />0. <br />M' <br />Ila <br />SEC. <br />29, <br />T. <br />29 <br />Nt <br />R, <br />5 <br />Et <br />WA, <br />SEC. <br />32, <br />r11 G.. fir" w inn .F' f <br />IF, 41,7- FR% <br />`m -i h sl 11 — <br />C"3 <br />�t <br />. ,.2. NO PART OF THE SANITARYBE <br />CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED,— <br />D APPROVED BY P <br />.M . 4. <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED <br />ItFROM AVAILABLE RECORDSR. SHOWN FOR <br />AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF <br />CONFLICTS WITH EXISTING CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS CONSTRUCTION, <br />CONTRACTOR SHALL NOTIFY THE PUBLIC <br />BE APPROVED <br />REQUIREDORKS INSPECTOR AND ANY <br />CHANGES ! <br />REPRESENTATIVECR O �' O <br />I Ei � PROJECT. <br />3 ?� l31 <br />I III i i 0 <br />'� 012� ' � � f le <br />6. GROUND ELEVATIONS FOR MANHOLESRE BASED ON I ,. <br />INSTALLEDFINAL STRUCTURE RIM ELEVATIONS ARE TO BE DETERMINED, MANHOLES <br />IN THIS PHASE OF THEDEVELOPMENT <br />ABILITY TO HAVE THE FINAL RIM ELEVATION ADJUSTED BY ±2', <br />MAINS7. ALL SEWER RB INSTALLED WITH GREEN STRIPE ON PIPEAND TRACING WIRE SHALL BE INSTALLED ABOVE THE PIPE BEDDING. <br />SEWER MAIN PIPE MATERIALSAPPROVED <br />ENGINEER PRIOR CONSTRUCTION. <br />8. SANITARY SEWER MANHOLE LIDS SHALL BE INSTALLED <br />DWG. NO. 610. <br />10. �F= NAL RIM ELEVA` IONS TO BE PROVIDED 4IN F lU S PHASE OF WORK. <br />This record Drawing has been prepared, in part, based <br />on `As -Guilt" information provided by others. Though <br />the as -built information and this drawing are based on <br />the best avaHable information, no presumption should <br />be made regarding the drawing's accuracy. <br />/5-4 �, 1-0/1-4/2-021 <br />S19n6d By Date <br />Vncent Wen, PE <br />Print Name & Tit&e <br />Drown By Dote I I SHELTER H O LD N , LLC zi <br />Drawing No. <br />SS2 <br />W, <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.