Laserfiche WebLink
SSMF-IB <br />14T-2" <br />27.83' <br />0a (REF —SEE CIVIL) <br />28'-4" <br />SBS 28'-4" <br />� 28'-4" 97'-4" <br />L _ SB7 18 —0 13 —p (REF —SEE CIVIL) <br />" T.) W14x90 � " 13,7�0« <br />0. <br />1' ^ P-S7 W14x90 W14x90 Bs.� 22— 27'-4" <br />T i'9 W14x90S1 22'-0" 13'-0" <br />.�'_. ` -510 W14x90 F� _ <br />-511 (C S6 7 _ <br />f P�6 S12 P (;CANT.) W14x90 B12 101;$" (R <br />aO B4 _ ._ i o 26.52° 513 f-Si4 1'515 W14x90 W14 22,0" EF SEE CIVjC <br />✓ P4 6 x90 (CANT <br />SSIVIIJ P S17 S18 <br />P-SS , r P S19 W 14Xg0 I1 A,� <br />C� N <br />r <br />P-S4 <br />r <br />N S62 <br />3 <br />297 .63' <br />2z �0" <br />�B 1. i3:.0" <br />W1440 18,`8'�. <br />B 16 29 _0" <br />e a„ <br />W14X9p SB17 29��'' <br />25.60 <br />. Q 9 ° , ' � -526 W1 <br />2 74x90 6�8 <br />28.04 .4 E <br />w 3 _ `` Wi4 <br />f <br />it i line 28.76 32 <br />Q 28.26 2.71 <br />25.071 , <br />9.29° <br />26. Q6 26.4' w_ __j <br />D W14x9p <br />25.78' - , 27.77 <br />27. 7 <br />2681 ' <br />ite Pile Plan Buildinq 1A <br />SCALE: 1" = 20' <br />rn <br />Site Pile Plan Buildings ltsr% <br />SCALE: 1 " = 20- <br />GRAPHIC SCALE <br />20 0 10 20 40 <br />( IN FEET ) <br />1 inch = 20 ft. <br />building i line , <br />29.76' 30a0 <br />23�_4" TREE SEE <br />2s :.0" cy�ft <br />B19 29 -Ob <br />W14X90 ,B <br />n� W14xg0 <br />3. <br />30 2 3 I.. 2 <br />EVERETT RIVERFRONT - SITE PHASE 1.1 PILE SCHEDULE <br />PILE NUMBER <br />DRIVEN GROUT PILE DIA. <br />T.O. PILE ELEVATION <br />PER CIVIL <br />NNTICIPATED SLEEVE DEPR <br />FROM EXISTING GRADE <br />ANTICIPATED PILE LENGTH <br />FROM EXISTING GRADE <br />P—S1 TO P—S23 <br />16" <br />VERIFY <br />43' <br />65' <br />P—S28 TO P—S48 <br />16" <br />VERIFY <br />48' <br />65' <br />PILE SCHEDULE NOTES: <br />1. ALLOWABLE PILE LOADS AFTER ACCOUNTING FOR DOWNDRAG FORCES ARE 265 KIPS FOR 16" DIAMETER. <br />2. ANTICIPATED PILE EMBEDMENT INTO BEARING SURFACE IS 15 FEET. <br />3. PILE EMBEDMENT AND CAPACITY TO BE VERIFIED BY LOAD TESTING PROGRAM. <br />4. ANTICIPATED SLEEVE DEPTHS TO BE VERIFIED BY GEOTECHNICAL ENGINEER, <br />5. ANTICIPATED PILE LENGTH TO BE VERIFIED BY GEOTECHNICAL ENGINEER. <br />INFORMATIONALAT BUILDING LINES ARV <br />=1 <br />d <br />0 <br />co <br />0 <br />Z <br />c <br />Co <br />w <br />N <br />CO <br />o <br />CoCo <br />o <br />L <br />a) <br />Lo <br />CO <br />C� <br />m <br />CO <br />C <br />-p <br />cQ <br />.� <br />a) <br />Co <br />a� <br />C <br />W <br />� <br />0 <br />1 <br />z <br />C\2 <br />lid <br />00 <br />CID�C <br />N <br />ti <br />M o <br />Pg <br />H <br />A <br />N <br />CD <br />\ <br />O <br />CD <br />N <br />M <br />Co <br />N <br />N <br />Cl <br />rn <br />O <br />CD <br />r- <br />w <br />d <br />w <br />zrr. <br />CZcn <br />�a <br />a <br />(L <br />Cr_ <br />z <br />O <br />5 <br />Ld <br />w <br />x <br />Q <br />Q <br />m <br />U) <br />M <br />of <br />Q <br />w <br />Y <br />w <br />V <br />z <br />Q <br />O <br />�4 <br />w <br />U <br />P4 <br />C7 <br />z <br />� <br />o <br />0 <br />pool <br />CC3 <br />� <br />r� <br />Ct <br />It <br />• r—I <br />�, <br />N <br />W <br />� <br />SP102 <br />