Laserfiche WebLink
z <br />Ln <br />0 <br />0 <br />0 <br />0 <br />0 <br />Do <br />0 <br />N <br />i <br />v <br />0- <br />Q) <br />I <br />U <br />�c <br />i <br />41 <br />Q) <br />Q) <br />v� <br />0 <br />s— <br />i <br />GENERAL NOTES: <br />SPECIAL LANDFILL &TE REQUIREMENTS: <br />A PORTION OF THE PROJECT IS LOCATED ON THE EVERETT LANDFILL SITE. THE EVERETT LANDFILL SITE IS SUBJECT TO A <br />CONSENT DECREE BETWEEN THE CITY, RIVERFRONT COMMERCIAL INVESTMENT, LLC, ,AND THE STATE DEPARTMENT OF ECOLOGY <br />THAT INCLUDES SPECIAL REQUIREMENTS FOR WORK ON THE LANDFILL SITE AS DESCRIBED BELOW, ALL CONSTRUCTION WORK <br />SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONSENT DECREE AND THE ENVIRONMENTAL REQUIREMENTS OF <br />THE CLEANUP ACTION PLAN, <br />TO RESTRICT PUBLIC ACCESS TO THE LANDFILL SITE DURING CONSTRUCTION, FENCING AND LOCKING GATES SHALL BE <br />MAINTAINED DURING CONSTRUCTION AND SECURED DAILY. <br />CONTRACTOR MUST DEVELOP, SUBMIT FOR OWNER APPROVAL, AND MAINTAIN, A SITE SAFETY AND HEALTH PLAN AT ALL TIMES. <br />THE SITE HEALTH AND SAFETY PLAN SHALL MEET THE REQUIREMENTS OF CFR 1910.120 AND THE CONSENT DECREE, AND BE <br />SUBMITTED TO THE CITY' OF EVERETT AND THE STATE DEPARTMENT OF ECOLOGY FOR REVIEW, <br />DUST AND ODORCONTROL: <br />THE SITE SHALL BE MONITORED FOR FUGITIVE DUST. IF FUGITIVE DUST DEVELOPS, CONTRACTOR IS TO WATER DOWN <br />THE WORK AREA UNTIL DUST IS CONTROLLED FROM MIGRATING OUTSIDE OF THE CONSTRUCTION ZONE, DUST CONTROL <br />MEASURES SHOULD NOT RESULT IN SURFACE WATER RUNOFF, <br />ODOR EMISSIONS SHALL BE CONTROLLED TO ENSURE COMPLIANCE WITH STATE OF WASHINGTON AND PUGET SOUND AIR <br />AGENCY REGULATIONS. METHODS OF CONTROL SHALL INCLUDE BUT IS NOT LIMITED TO AIR MONITORING AT DOWNLOAD <br />PERIMETER WORK AREA LOCATIONS, POLYETHYLENE OR OTHER SHEETING, TARPING, OR TEXTILE TO COVER EXPOSED SOIL AREAS <br />AND WASTE CONTAINERS, AND USE OF WATER SPRAYS, <br />SPECIAL SAFETY PROVISIONS: <br />CONSTRUCTION OF THIS PROJECT IS BEING PERFORMED ON, AND ADJACENT TO BURIED WASTES AND REFUSE, AS <br />THESE BURIED MATERIALS DECOMPOSE ANAEROBICALLY, THEY GENERATE LANDFILL GAS (LFG), WHICH NORMALLY <br />CONSISTS OF CARBON DIOXIDE (CO2), METHANE (CH4), OCCASIONALLY HYDROGEN SULFIDE (H2S) AND OTHER GASES, <br />DEPENDENT ON THE COMPOSITION OF THE BURIED MATERIALS, HAZARDOUS CONDITIONS DUE TO LANDFILL GASES <br />INCLUDE BUT ARE NOT LIMITED TO FIRES, EXPLOSIONS, OXYGEN DEFICIENCY, AND TOXIC ENVIRONMENTS. LEACHATE <br />(I.E., CONTAMINATED LIQUID THAT HAS COME IN CONTACT WITH REFUSE AND CONTAINS WASTE DEGRADATION <br />PRODUCTS) MAY BE PRESENT IN EXCAVATIONS. <br />LANDFILL GASES HAVE THE POTENTIAL TO CREATE HAZARDOUS CONDITIONS IF NOT CONTROLLED OR RECOGNIZED. <br />SOME OF THE HAZARDS INCLUDE: <br />1, FIRES THAT MAY START SPONTANEOUSLY FROM EXPOSED AND/OR DECOMPOSING REFUSE. <br />2, FIRES AND EXPLOSIONS THAT MAY OCCUR FROM THE PRESENCE OF METHANE GAS, <br />3, LANDFILL GASES AND OTHER TRACE GASES THAT MAY HAVE TOXIC EFFECTS OR CREATE AN OXYGEN DEFICIENCY IN <br />TRENCHES, VAULTS, CONDUITS, AND STRUCTURES. <br />4. HYDROGEN SULFIDE, A HIGHLY TOXIC AND FLAMMABLE GAS, WHICH MAY BE PRESENT. <br />5. EXPOSURE TO LEACHATE IS POTENTIALLY HAZARDOUS TO HUMAN HEALTH BECAUSE OF TOXIC AND/OR CARCINOGENIC <br />COMPOUNDS THAT MAY BE PRESENT IN THE LEACHATE. <br />A. ALL IMPORTED SOILS WILL BE VISUALLY FIELD SCREENED FOR EVIDENCE OF CONTAMINANTS. ANY SUSPECT SOILS WILL <br />BE SAMPLED FOR CHEMICAL ANALYSIS. ALL OTHER SOIL WILL BE SAMPLED FOR CHEMICAL ANALYSIS AT THE RATE OF <br />ONE COMPOSITE SAMPLE (COMPRISED OF FOUR DISCRETE GRAB SAMPLES) FOR EVERY 5,000 CUBIC YARDS IMPORTED. <br />ANALYSES WILL INCLUDE PETROLEUM HYDROCARBONS BY METHOD NWTPH—HCID (WITH FOLLOW UP AS NEEDED) AND <br />RCRA METALS BY METHOD EPA 601OD/602OB/200,7/200.6, ALL SOIL REMAINING ON SITE WILL MEET THE CRITERIA <br />FOR LIMITED ACCESS PROPERTIES IN THE CURRENT DRAFT REVISIONS TO WAC 173-350 SOLID WASTE HANDLING <br />STANDARDS. <br />i ■ <br />r i.. �C I.N I Will j : ��j w r imillmill[II01:1 111' <br />■ � � Y! r t. i � r r Y. 1 <br />I <br />, <br />Ir ', '�. ! � r • � ! � , � .. � it . Iw� �. ,: i I ; � .. � � , � s I �, ° � ,� s: <br />No. I Date <br />ACCIDENTS CAUSING DEATH, INJURES, OR DAMAGE MUST BE REPORTED IMMEDIATELY TO THE OWNER BY TELEPHONE <br />OR MESSENGER, IN ADDITION, PROMPTLY REPORT IN WRITING TO THE OWNER ALL ACCIDENTS WHATSOEVER ARISING <br />OUT OF, OR IN CONNECTION WITH, THE PERFORMANCE OF THE WORK WHETHER ON, OR ADJACENT TO, THE SITE, GIVING <br />FULL DETAILS AND STATEMENTS OF WITNESSES. <br />CONTACT INFORMATION: RIVERFRONT COMMERCIAL INVESTMENT LLC, <br />ATTENTION: RIVERFRONTCOMMERCIAL@SHELTERHOLDINGS.COM <br />PHONE: 425.559.2300 ADDRESS: 11624 SE 5TH STREET, SUITE 210, BELLEVUE, WA 95005 <br />IF A CLAIM IS MADE BY ANYONE AGAINST THE CONTRACTOR OR ANY SUBCONTRACTOR ON ACCOUNT OF ANY ACCIDENT, <br />THE CONTRACTOR SHALL PROMPTLY REPORT THE FACTS IN WRITING WITHIN 24 HOURS AFTER OCCURRENCE, TO THE <br />OWNER, GIVING FULL DETAILS OF THE CLAIM, <br />S ITE SAFETY AND HEALTH PLAN: <br />DEVELOP, IMPLEMENT AND MAINTAIN FOR THE DURATION OF THIS CONTRACT, A SITE SAFETY AND HEALTH PLAN <br />PREPARED UNDER THE SUPERVISION OF AND SIGNED BY A CERTIFIED INDUSTRIAL HYGIENIST THAT WILL EFFECTIVELY <br />INCORPORATE AND IMPLEMENT ALL REQUIRED CITY, COUNTY, STATE, AND FEDERAL SAFETY PROVISIONS. THE SITE <br />SAFETY AND HEALTH PLAN SHALL BE CONSISTENT WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL HEALTH <br />STANDARDS AND GUIDELINES, INCLUDING, BUT NOT LIMITED TO, THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), <br />THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT (WISHA), THE NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY <br />AND HEALTH (NIOSH), THE AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH), AND THE U.S. <br />ENVIRONMENTAL PROTECTION AGENCY (EPA). WHERE THESE ARE IN CONFLICT, THE MORE STRINGENT REQUIREMENTS <br />SHALL BE FOLLOWED, THE PLAN SHALL BE SUFFICIENT TO PROTECT ONSITE AND OFFSITE PERSONNEL FROM THE <br />POTENTIAL PHYSICAL, CHEMICAL, AND/OR BIOLOGICAL HAZARDS PARTICULAR TO THE SITE. THE CONTRACTOR SHALL <br />ASSIGN AN INDIVIDUAL TO SERVE AS A SITE SAFETY AND HEALTH OFFICER AT THE JOB SITE AT ALL TIMES DURING WORK, <br />WHO WILL BE QUALIFIED, RESPONSIBLE, AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SITE <br />SAFETY AND HEALTH PLAN. <br />THE CONTRACTOR'S WRITTEN SITE SAFETY AND <br />HEALTH PLAN SHOULD INCLUDE, BUT NOT BE LIMITED TO: <br />1, A LIST OF NAMES OF KEY PERSONNEL AND ALTERNATES RESPONSIBLE FOR SITE SAFETY AND HEALTH, INCLUDING THE SITE <br />SAFETY AND HEALTH OFFICER. <br />2. A LIST OF CHEMICAL AND PHYSICAL HAZARDS (SUCH AS METHANE EXPOSURE), ALLOWABLE OSHA EXPOSURE LEVELS, <br />THRESHOLD LIMIT VALUES, OTHER REGULATORY EXPOSURE LEVELS, AND THE EMERGENCY RESPONSE SHOULD AN EXPOSURE OR <br />INJURY OCCUR, <br />3. FREQUENCY AND TYPES OF AIR MONITORING, PERSONNEL MONITORING, AND ENVIRONMENTAL SAMPLING TECHNIQUES AND <br />INSTRUMENTATION TO BE USED, INCLUDING METHODS OF MAINTENANCE AND CALIBRATION OF MONITORING AND SAMPLING <br />EQUIPMENT TO BE USED. <br />4. PERSONAL PROTECTIVE EQUIPMENT TO BE USED BY EMPLOYEES FOR EACH OF THE SITE TASKS AND OPERATIONS AND CRITERIA <br />FOR UPGRADING LEVEL OF WORKER PROTECTION FROM LEVEL D TO LEVELS C AND B. <br />5, A LIST OF SAFETY AND MONITORING EQUIPMENT AT THE JOB SITE AND LOCATIONS WHERE EQUIPMENT IS STORED OR <br />MAINTAINED. <br />6. AN EMERGENCY EVACUATION PLAN FOR IMMEDIATE REMOVAL TO A HOSPITAL OR A DOCTOR'S CARE ANY PERSON WHO MAY BE <br />INJURED ON THE JOB SITE INCLUDING ROUTES TO MEDICAL TREATMENT, AND EMERGENCY TELEPHONE NUMBERS INCLUDING <br />HOSPITAL, AMBULANCE, FIRE, SHERIFF/POLICE, POISON CONTROL, THE ENGINEER, AND OTHERS AS DEEMED NECESSARY, <br />7. EMPLOYEE TRAINING ASSIGNMENTS. <br />S. MEDICAL SURVEILLANCE REQUIREMENTS. <br />9. DECONTAMINATION PROCEDURES, <br />10. CONFINED SPACE ENTRY PROCEDURES. <br />11, A SPILL CONTAINMENT PROGRAM FOR HANDLING CONTAMINATED LIQUIDS. <br />12, COPIES OF INDIVIDUAL 40—HOUR HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE TRAINING (HAZWOPER) AND <br />6-HOUR ANNUAL HAZWOPER REFRESHER CERTIFICATES FOR EVERY EMPLOYEE THAT IS TO WORK IN CONTACT WITH LANDFILL <br />MATERIAL, <br />13. DOCUMENTATION OF PARTICIPATION IN ONGOING RESPIRATORY PROTECTION PROGRAM, AS <br />PER PART <br />RESULTSINCLUDING <br />THE CONTRACTOR <br />. SHALL INFORM <br />,. WORKERS <br />-.. AND <br />THE PUBLIC SITE OF THE <br />POTENTIAL <br />O R THE <br />PRESENCE <br />G , METHANE AND OTHER <br />a. EMANATING <br />. NATURAL <br />REFUSE <br />BURIED AT OR NEAR THE r SITE AND i IMPORTANCE SAFETY O ENSURE THE SAFETY OF <br />WORKERS <br />R AND THE <br />:B CONTRACTOR SHALLINSTRUCT ALL <br />WORKERS .DMAINTAINCONTROL O <br />CONSTRUCTIONI O PROTECT AND MAINTAIN THEINTEGRITY OF THE CLOSED PORTION OF THE <br />FAILURE ON THE PART OF THE CONTRACTOR TO FOLLOW T H I:E SAFETY AND HEALTH r <br />LAN OR TO CONTINUE ANY <br />7r',." IN AN UNSAFEX E. r MAY RESULT IN SUSPENSION <br />I THE <br />WORK <br />r, ,.. THE <br />OWNER OR <br />, CITY OF EVERETT. <br />SITE SAFETY IHEALTH ' t i <br />THE CONTRACTOR SHALL PROVIDE A PERSON DESIGNATED AS THESITE SAFETY AND HEALTH OFFICER, <br />THOROUGHLY TRAINED <br />. D I RESCUE PROCEDURES, ��A, EQUIPMENT D GAS DETECTORS, <br />-, RANDD THE <br />POTENTIAL HAZARDS THAT MAY BE PRESENT MUNICIPAL PERSON PRESENT <br />. <br />BEINGAT ALL TIMES WHILE WORK IS PERFORMED A�r, <br />i WRITTEN <br />�I <br />A <br />r <br />CONDUCT <br />p <br />rAL <br />n <br />0 <br />THE CONTRACTOR'S SITE SAFETY AND HEALTH OFFICER SHALL BE DELEGATED THE <br />AUTHORITY TO ORDER ANY PERSON <br />OR WORKER ON THE LANDFILL SITE TO <br />FOLLOW THE SAFETY <br />RULES, FAILURE TO <br />OBSERVE THESE RULES IS SUFFICIENT <br />CAUSE FOR REMOVAL OF THE PERSON OR WORKER(S) FROM <br />THE PROJECT, <br />THE SITE SAFETY AND HEALTH OFFICER <br />SHALL HAVE TAKEN A COURSE SATISFYING <br />THE TRAINING REQUIREMENTS OF 29 <br />CFR 1910.120 FOR HAZARDOUS WASTE <br />SITE OPERATIONS. <br />A COPY OF THE SITE <br />SAFETY AND HEALTH OFFICER'S 40 <br />HOUR OSHA HAZMAT CERTIFICATE SHALL <br />BE KEPT AVAILABLE <br />ON SITE, <br />THE SITE SAFETY AND HEALTH OFFICER IS RESPONSIBLE FOR DETERMINING THE <br />EXTENT TO WHICH ANY SAFETY <br />EQUIPMENT MUST BE UTILIZED, DEPENDING ON CONDITIONS ENCOUNTERED AT THE SITE. <br />WET WEATHER HANDING AND PLACEMENT CE E ISTINC <br />QN -SATE S&L: <br />1. DUE TO HIGH FINES CONTENT, THE EXISTING ON —SITE SOIL SPECIFIED HEREIN <br />WILL BE MOISTURE SENSITIVE AND VERY <br />DIFFICULT TO IMPOSSIBLE TO COMPACT DURING WET WEATHER OR WHEN ITS <br />MOISTURE CONTENT INCREASES TO MORE THAN <br />ABOUT 2 PERCENT OVER OPTIMUM. <br />2. THE CONTRACTOR SHALL COVER AND PROTECT ALL STOCKPILES OF ON —SITE <br />AND IMPORTED SOIL FROM BEING EXPOSED TO <br />RAIN. THE CONTRACTOR IS REQUIRED TO CONTROL THE MOISTURE CONTENT <br />ON ALL EXISTING ON —SITE SOIL SUCH THAT IT <br />CAN BE PLACED AND COMPACTED AS SPECIFIED HEREIN. IF IN THE OPINION <br />OF THE ENGINEER, PORTIONS OF THE EXISTING <br />SITE STOCKPILE OR ANY IMPORTED SOIL STOCKPILED ON THE LANDFILL SITE <br />BECOME EXCESSIVELY WET DUE TO NOT BEING <br />PROPERLY COVERED AND PROTECTED FROM RAIN, THOSE PORTIONS OF THE <br />STOCKPILE SHALL BE DRIED/AMENDED/MOISTURE <br />CONDITIONED AT THE CONTRACTOR'S SOLE EXPENSE. THE CONTRACTOR SHALL ENSURE THAT PONDING DOES NOT OCCUR ON <br />THE LANDFILL COVER <br />3, ISOLATED OR EXTENDED PERIODS OF WET WEATHER MAY FORCE THE CONTRACTOR TO SUSPEND PLACEMENT AND COMPACTION <br />OF EXISTING ON —SITE SOIL, IT WILL BE THE CONTRACTOR'S IRRESPONSIBILITY TO COMPLETE THE SPECIFIED WORK IN THE <br />SPECIFIED SCHEDULE. <br />4, WET WEATHER HANDLING AND PLACEMENT OF EXISTING ON -SITE SOIL REQUIREMENTS NOTED ABOVE SHALL ALSO APPLY TO <br />LOW PERMEABILITY SOIL, AND OTHER MOISTURE SENSITIVE MATERIALS, SUCH AS BENTONITE AMENDED SOILS. <br />PLACNIG AND SPREADING EMBANKMENT OF STRUCTURAL. FILL MATERIALS® <br />1. DURING COMPACTION OPERATIONS, MAINTAIN MOISTURE CONTENT IN EACH LIFT OF STRUCTURAL FILL WITHIN THE SPECIFIED <br />TARGET MOISTURE CONTENT RANGE. <br />2. THE STRUCTURAL FILL MATERIAL SHALL BE SPREAD EVENLY IN HORIZONTAL LIFTS NOT EXCEEDING 12 INCHES (UNCOMPACTED <br />THICKNESS). COMPACT EACH LIFT TO AT LEAST 95 PERCENT OF MODIFIED PROCTOR MAXIMUM DRY DENSITY DETERMINED IN <br />ACCORDANCE WITH ASTM D1557 AT A MOISTURE CONTENT WITHIN 3 PERCENT OF OPTIMUM MOISTURE CONTENT. THE <br />CONTRACTOR SHALL DEVELOP AND USE COMPACTION METHODS THAT PRODUCE THE REQUIRED COMPACTION, <br />3. DURING PLACEMENT AND SPREADING, CONTROL OF MOISTURE CONTENT AND COMPACTION OF STRUCTURAL FILL SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY. CEMENT —AMENDMENT IS ONE METHOD OF IMPROVING THE SOIL MOISTURE CONTENT SO THAT <br />IT CAN BE COMPACTED. <br />4. PROVIDE A SMOOTH SOIL SURFACE ON THE FINAL LIFT PRIOR TO PLACEMENT OF OTHER MATERIALS. <br />CIRADIN <br />1. CONTRACTOR SHALL MAINTAIN STOCKPILING ACTIVITIES BOTH DURING AND POST —GRADING TO PREVENT PONDING. <br />DISPOSAL OF GROUNDWATER: <br />1. IF EXCAVATIONS OCCUR IN REFUSE, ALL WATER REMOVED FROM SAID EXCAVATIONS WILL BE CONSIDERED CONTAMINATED AND <br />SHALL BE DISPOSED OF AT THE CITY'S WASTEWATER TREATMENT FACILITY (WTF), DISCHARGE TO THE WTF CAN BE VIA <br />DISCHARGE TO MANHOLES AT THE PROJECT SITE AS REVIEWED BY THE ENGINEER AND APPROVED BY THE CITY, ALL <br />DISCHARGED WATER SHALL BE FREE OF SEDIMENT OR OTHER DEBRIS, CONTRACTOR TO COORDINATE DISCHARGE TO THE <br />EXISTING LEACHATE SYSTEM OR SANITARY SEWER WITH THE CITY OF EVERETT. <br />2. A DISCHARGE AUTHORIZATION PERMIT IS REQUIRED TO BE OBTAINED THROUGH THE CITY OF EVERETT OPERATIONS, CONTACT <br />BRIAN DOOLAN AT 425-257-8826 OR BDOOLAN®EVERETTWA.GOV. <br />3. ANY GROUNDWATER ENCOUNTERED ON THE LANDFILL SHALL BE CONSIDERED LEACHATE; CONTRACTOR TO COORDINATE <br />DISCHARGE TO THE EXISTING LEACHATE SYSTEM OR SANITARY SEWER WITH THE CITY OF EVERETT. SEDIMENT LADEN LIQUIDS <br />AND SOLIDS MAY NOT BE DISCHARGED TO THESE SYSTEMS. <br />TEMPORARY HAULZACCESS ROADS AND STAGING AREAS: <br />1. PRIOR TO CONSTRUCTION OF THESE TEMPORARY IMPROVEMENTS, THE SUBGRADE SOILS SHALL BE COMPACTED TO A FIRM AND <br />UNYIELDING STATE, AS DETERMINED BY THE GEOTECHNICAL ENGINEER, THEN PROOF ROLLED USING A TANDEM AXEL DUMP <br />TRUCK OR OTHER GEOTECHNICAL ENGINEER APPROVED EQUIPMENT UNDER THE OBSERVATION OF THE GEOTECHNICAL <br />TRUCK, P <br />ENGINEER. <br />2. SOFT SPOTS OBSERVED SHALL BE EXCAVATED TO FIRM SOIL CONDITIONS R A MAXIMUM I 13 Q TO XIM M DEPTH OF 24 INCHES AND HAVE <br />MIRAFIO 500X GEOTEXTILE FABRIC EQUIVALENT APPROVED OR . PLACED AT THE SASE OF THE EXCAVATION AND THEN <br />( )s <br />BACKFILLED WITH STRUCTURAL FILL. <br />3. UPON COMPLETION OF REPAIRS, PROOF ROLLS SHALL BE PERFORMED IN REPAIRED AREAS. <br />4. A MINIMUM OF 12 INCHES OF CRUSHED ROCK APPROVED BY THE GEOTECHNICAL ENGINEER SHALL BE PLACED ABOVE THE <br />PREPARED SUBGRADES ABOVE LAYER <br />OF ► FABRIC r APPROVED <br />r r P +1 <br />EARLIERSOFT SPOT REPAIR ALREADY NECESSITATED THE USE OF THE GEOTEXTILE. <br />5. ADJACENT RESIDENTS' <br />, USE OF EXISTING NEIGHBORHOOD <br />....r ROAD y BEEN <br />.I.I COORDINATED BETWEEN OWNER <br />LIMITEDREPRESENTATIVE AND THE CITY. CONTRACTOR SHALL ABIDE BY AGREEMENT'S TERMS DURING CONSTRUCTION, INCLUDING BUT <br />NOT TO MAXIMUM WAIT TIMES FOR RESIDENTS AND/OR <br />PERSONNEL. <br />/ �, L�//,l � <br />Drawn By <br />Date <br />P. HCUCHTAUNG <br />1 19 <br />Designed By <br />Checked By <br />Approved Icy <br />C. DONNER <br />8/1 5L 9 <br />