Laserfiche WebLink
Im <br />ry <br />Ln <br />O <br />O <br />4f' <br />O <br />O <br />O <br />co <br />a <br />N <br />N <br />0 <br />Q <br />I <br />0 <br />0 <br />V) <br />c- <br />n <br />G <br />co <br />v <br />O <br />0 <br />0 <br />ry <br />I <br />O <br />N <br />O <br />O <br />�c <br />U <br />e <br />0 <br />0 <br />U <br />0 <br />> <br />a) <br />n <br />c <br />0 <br />0 <br />ry <br />W <br />I <br />O <br />O <br />O <br />00 <br />0 <br />N <br />e <br />cn <br />U <br />cu <br />0 <br />n <br />n <br />un <br />N <br />I <br />O <br />NI <br />y 2 93 <br />EC. 28"' <br />1 ® ! <br />N EC, 3 T." 29! + Nt <br />9 s ! <br />1 <br />.`ems: <br />`�-C 1o�—g. `"�"-- �-• ^ �"�_y ,� �;gypv"' 4 �5' -;, ,,1^(p— +�!� ryypl r <br />i�-38-� 's t �� ^d,s9•,..e �'.*^4 —� yY'• 4' 1--��y ---+ '�1-.` 0 9� � � i <br />4--m �O \\— <br />STA 29+32 10.0° RT ��-�- <br />AP <br />SA 33+93 22, 6 a LT <br />C <br />STA 31 +54 10.0' RT �p! <br />AP 40D ,,-10 <br />EXISTING 40, STA 34-I-Q2 22.6eLT <br />CONSTRUCTION _, ,� <br />ACCESS ROAD R=409 a PC I <br />— -_ �-- R-25' 2 (\P1D) ; <br />__ia3 I <br />— APPROXIMATE _�.�__�.�.__-- — — <br />PROPOSED FUTURE CRANE a —� <br />FOUNDATION — � .�,..:_ ... �.:•� :.�,;��, <br />RlVERFRONT STA 32-�-74 10.0 RT �(a.9 <br />BOULEVARD AP 35670�34 3 m9�—- <br />LOCATION Ee 1307510.09 ? 'A�, <br />7 I ! <br />MATCH TO EXISTING _ <br />CONSTRUCTION ("d <br />ACCESS ROAD <br />N:356753,59 <br />E;1307515.74 I e j I Iss <br />i <br />EVARD <br />-_.,,.-^•�.. ,,,, s^„ "`^^.��—„� .,.,� ~"^--.,"'^`"'tea., o��"-o-.."ejf pd <br />Is <br />APPROX. <br />EXISTING <br />TEMPORARY <br />0 SEDIMENT <br />TRAP ACCESS <br />ROAD <br />I <br />x <br />0 <br />'t] <br />i� <br />n <br />5 Ej W. M. <br />1 E 9 W. <br />M. <br />LEGEND <br />TEMPORARY HAUL ROAD, 1289 CSBC OVER LAMER <br />APPROVED EQUIVALENT. SEE SHEET TR1 FOR <br />TYPICAL SECTION. <br />GENERAL NOTES <br />1. BUILDING LAYOUTS AND RIVERFRONT BOULEVARD ARE PRELIMINARY AND <br />ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY, <br />TEMPORARY HAUL ACCESS ROADS AND STAGN <br />AREAS: <br />1. PRIOR TO CONSTRUCTION OF THESE TEMPORARY IMPROVEMENTS, THE <br />SUBGRADE SOILS SHALL BE COMPACTED TO A FIRM AND UNYIELDING <br />STATE, AS DETERMINED BY THE GEOTECHNICAL ENGINEER, THEN PROOF <br />ROLLED USING A TANDEM AXEL DUMP TRUCK, OR OTHER GEOTECHNICAL <br />ENGINEER APPROVED EQUIPMENT, UNDER THE OBSERVATION OF THE <br />GEOTECHNICAL ENGINEER. <br />2. SOFT SPOTS OBSERVED SHALL BE EXCAVATED TO FIRM SOIL <br />CONDITIONS OR TO A MAXIMUM DEPTH OF 24 INCHES AND HAVE <br />MIRAFI® 50OX GEOTEXTILE FABRIC (OR APPROVED EQUIVALENT), PLACED <br />AT THE BASE OF THE EXCAVATION AND THEN BACKFILLEDWITH <br />STRUCTURAL FILL. <br />3, UPON COMPLETION OF REPAIRS, PROOF ROLLS SHALL BE PERFORMED <br />IN REPAIRED AREAS, <br />4. A MINIMUM OF 12 INCHES OF CRUSHED ROCK APPROVED BY THE <br />GEOTECHNICAL ENGINEER SHALL BE PLACED ABOVE THE PREPARED <br />SUBGRADES ABOVE A LAYER OF MIRAFI@ 50OX GEOTEXTILE FABRIC (OR <br />APPROVED EQUIVALENT) UNLESS PREVIOUS SOFT SPOT REPAIR ALREADY <br />NECESSITATED THE EARLIER USE OF THE GEOTEXTILE. <br />5. STRUCTURAL FILL FOR TEMPORARY HAUL/ACCESS ROADS AND STAGING <br />AREAS SHALL BE COMPACTED TO MINIMUM 95% MODIFIED PROCTOR, <br />6, EXISTING ACCESS ROAD AND GATE ACCESS SHALL BE MAINTAINED <br />UNLESS AN ALTERNATIVE ACCESS IS APPROVED BY THE CITY, AND THE <br />OWNER REPRESENTATIVE. <br />HORZONTAL ®ATE <br />HORIZONTAL DATUM FOR THIS SURVEY IS NAD 83/91 PER CITY OF <br />EVER . CITY OF EVERETT CONTROL POINT NO. 703-55-04 WAS HELD <br />FOR POSITION, AND A LINE BETWEEN SAID POINT NO. 703-55-04 AND <br />CONTROL POINT NO. INCH-9 WAS HELD FOR ROTATION, BEING NORTH <br />0928` 11 " EAST. <br />VE 7 AL AT <br />____—__m_—_.__m.n_____ NAVDSS <br />a f/ j/ m LL. i <br />Drawing No. <br />TR3 <br />Sheaf No. <br />Xof <br />21 <br />T®tai <br />