Laserfiche WebLink
F19-31440-2## <br /> Attachment C <br /> Budget <br /> The Contractor shall report on its progress in implementing the Scope of Work on a quarterly basis. <br /> The report shall include the type and number of materials acquired with grant funds, and the type and <br /> number of materials so acquired which have been distributed to each of the counties within its ITT region. <br /> The quarterly report will be submitted in Word format to the COMMERCE representative identified on this <br /> Contracts Face Sheet, not later than the 15th day following the end of each calendar quarter of this <br /> contract. <br /> 1 <br />