Laserfiche WebLink
(6) Pumping station No. 6 shall be constructed at a <br /> point in Norton Avenue two hundred (200) feet north of the <br /> center line of Nineteenth Street and discharge at the same <br /> point to trunk sewer installed there as a part of this <br /> project . <br /> (7) Pumping station No. 7 shall be constructed at the <br /> intersection of Fourteenth Street and Norton Avenue and <br /> shall discharge through a ten (10) inch diameter force main <br /> to be installed in and along Fourteenth Street to Grand <br /> Avenue; thence in and along Grand Avenue to Fifteenth Street; <br /> thence in and along Fifteenth Street to the first alley <br /> east of Rucker Avenue and connect there to a trunk sewer <br /> installed as a part of this project . <br /> (8) Pumping station No. 8 shall be constructed in <br /> Fourteenth Street at a point one hundred (100) feet west of <br /> Grand Avenue and shall discharge through a six (6) inch <br /> diameter force main to be installed in and along Fourteenth <br /> Street to Grand Avenue; thence in and along Grand Avenue <br /> to Fifteenth Street; thence Fifteenth Street to the first <br /> alley east of Rucker Avenue and be connected there to a <br /> trunk sewer installed as a part of this project . <br /> (9) Pumping station No. 9 shall be constructed in <br /> Hayes Street two hundred (200) feet more or less east of <br /> East Grand Avenue and discharge through a four (4) inch <br /> diameter force main to be installed in and along Hayes <br /> Street to East Grand Avenue and be connected there to a <br /> trunk sewer installed as a part of this project . <br /> (10) Pumping station No. 10 shall be constructed in <br /> California Avenue at the first alley west of Harrison Street <br /> and shall discharge through a ten (10) inch force main to <br /> be installed in and along California Avenue to Summit <br /> Avenue; thence in and along Summit Avenue to Everett <br /> Avenue and connect there to a trunk sewer installed as a <br /> part of this project . <br /> (11) Pumping station No. 11 shall be constructed in <br /> Pacific Avenue at its easterly terminus and discharge <br /> through a ten (10) inch diameter force main to be installed <br /> in and along Pacific Avenue to yIaple Street and be connected <br /> there to a trunk sewer installed as a part of this project. <br /> (12) Pumping station No. 12 shall be constructed in <br /> Pine Street at a point five hundred (500) feet more or less <br /> south of Thirty-third Street and discharge through a four <br /> (4) inch force main to be installed in and along Pine Street <br /> to Thirty-third Street and connect there to a trunk sewer <br /> installed as a part of this project . <br /> D. The city shall acquire, construct and install the <br /> following described trunk and lateral sewers at the follow- <br /> ing approximate locations and of the following approximate <br /> size: <br /> -7- <br />