My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD 2021-11-01
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD 2021-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2021 10:24:32 AM
Creation date
11/1/2021 10:24:24 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SNO-ISLE SKILLS CENTER - KITCHEN ADDITIONS <br /> UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br /> MDB2 <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 12 Month Peak Demand (Month &Year) : June 2019 <br /> Phase to Phase Voltage (Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> Utility Peak Demand = 332 KW <br /> Power Factor / 0.90 (P.F.) <br /> Apparent Peak Demand = 368.89 KVA <br /> NEC 220.87(2) adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 461.11 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 461.11 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 461.11 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Utility Peak Demand with Adjustments = 461.11 KVA <br /> New Calculated Demand Load Added KITCHEN + 3.48 KVA <br /> + KVA <br /> + KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 464.59 KVA <br /> CALCULATED DEMAND CURRENT : 559 AMPS <br /> Note: See WAC 296-46B-900 (3)(j)for additional metering requirements <br /> Explain how the factor was derived for 30-day demand metering: <br /> Seasonal <br /> Utilized utility furnished 12 month peak demand for load calculation, seasonal demand factor is not <br /> necessary. <br /> Occupancy <br /> Since 12 months of demand data was utilized and normal occupancy occurred during the 12 month <br /> period, no additional occupancy adjustment is necessary. <br /> Other <br /> No other adjustment factors were utilized for this demand calculation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.