Laserfiche WebLink
11/27/2019 City of Everett Page 1 <br /> 12:21:59PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1910-031 Site Address 2902 COLBY AVE <br /> Applied 10/18/2019 Applicant ART SKOTDAL Lot <br /> Approved 10/24/2019 Owner 2902 COLBY LLC Block <br /> Issued 10/24/2019 Contractor OWNER Tract <br /> Parent Permit No. Description ADD NEW LULU ELEVATOR FROM STREET TO BASEMENT <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 10/28/2019 10/28/2019 BLDG DWF PARTIAL APPR (10/28/2019 2:31 PM DWF) <br /> 08-FRAMING Subject to receiving engineer of record final <br /> letter for foundation and framing. <br /> Drywall-3 sides of shaft walls only-5/8" <br /> type x,two layers with offset installed. <br /> Sound insulation installed. <br /> Ok to continue. <br /> 11/15/2019 11/15/2019 BLDG DWF PARTIAL APPR Kevin:425-417-6629 <br /> 09-DRYWALL <br /> (11/15/2019 2:08 PM DWF) <br /> Elevator fronts 1+2 floor ok to cover. <br /> 11/25/2019 11/25/2019 BLDG 15-FINAL DWF NOT READY Need Electrical Final Kevin:425-417-6629 <br /> before Bldg. <br /> 11/26/2019 11/26/2019 BLDG 15-FINAL DWF APPRVD-PERN Kevin:425-417-6629 <br /> 11/26/2019 11/26/2019 ADMIN USE HPC APPROVAL <br /> ONLY** <br /> INSP12 CittirsYsTEMS <br />