Laserfiche WebLink
• • <br /> Tawnya Herman <br /> From: Tony Lee <br /> Sent: Thursday, May 16, 2019 2:06 PM <br /> To: Terri Jorgenson;Tawnya Herman;Cindy Bergsma <br /> Cc: Paul McKee;Steve Ingalsbe;Ted de Budden;Shellie Pons; Darold Walden; Michael <br /> Bearda;Steve Banks <br /> Subject: Port of Everett Docks <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> FYI—a real 'Tony said'situation.... <br /> The port will be building new floating docks.These docks do not need building permits(odd, I know)or public works <br /> permits.They do need land use approvals(which apparently they already have).The Port(or contractor)will be coming <br /> in for other permits to include electrical, plumbing and standpipes that will be located on the docks.The electrical and <br /> plumbing do not need plan review however the standpipes do (fire suppression systems).Since there are no parent <br /> building permits, it is OK to issue the sub-permits without requiring building permits first. <br /> Thanks,Tony <br /> Tony Lee <br /> RBuilding Official I Permit Services <br /> 425.257.8812 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: Monday—Friday 7:30am-12:OOpm and 1:OOpm-4:OOpm <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />