My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
700 EDWARDS AVE 2022-04-14
>
Address Records
>
EDWARDS AVE
>
700
>
700 EDWARDS AVE 2022-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 1:21:28 PM
Creation date
11/2/2021 10:05:11 AM
Metadata
Fields
Template:
Address Document
Street Name
EDWARDS AVE
Street Number
700
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE N5.4-2 <br /> TABLE N5.4-1 Inspection Tasks During Welding <br /> Inspection Tasks Prior to Welding TABLE N5.4-3 <br /> inspection Tasks Prior to Welding QC QA Inspection Tasks During Welting QC QA inspection Tasks After Welding <br /> Welding procedure specifications(WPSs)available P P Use of gasified welders O O <br /> Manufacturer certifications for welding consumes available P P -Pa and handing of welding cornsurmes Inspection Tanks After Welding QC QA <br /> Packaging 0 0 Welds cleaned 0 0 <br /> Material Identification(type/grade) 0 0 -Exposure control Size,length and location of welds P P <br /> Welder identification system' 0 0 No welding over cracked tack welds 0 O Welds meet visual acceptance criteria <br /> Fit-up of groove welds(including joint geometry) Environmental conditions -Crack prohibition <br /> -Joint preparation -Wind speed within limits 0 0 -Weldlbase-metal fusion <br /> Crater cross section <br /> Dimensions(aignmerd root opening,root face,bevel 0 O -Precipitation and temperature P P <br /> 'x -Cleaniness(condition of steel surfaces) WPS folowed -Weld profiles <br /> -Tacking(tack weld malty and location) -Settings on welding equipment -Weld size <br /> -Backing type and fit(if amicable) -Travel speed -Undercut <br /> Configuration and finish of access holes 0 0 -Selected welding materials Porosity-p p Arc r iitys P P <br /> Fit-up of filet welds -ShiekIng gas type/f ow rate <br /> -Dimensions(aignmend,gaps at root) O O -Preheat applied k-area' P P <br /> -Cleaniness(condition of steel surfaces) -tnterpass temperature maintained(minimax) Backing removed and weld tabs reno%ed(if required) P P <br /> -Tacking(tack weld quatty and location) -Proper position(F,V,H,Old Repair acisles P P <br /> -Check welding equipment Welling techniques Document acceptance or rejection of welded joint or nnenter P P <br /> 'The fabricator or erector,as applicable,shal maintain a system by which a welder -Inlerpass and final cleaning 0 O 'When welding of doubler plates,continuity plates or stiffeners has been performed <br /> who has welded a joint or menter can be identified.Stamps,if used,shall be the low -Each pass within profile imitations <br /> stress type. -----------..._, meets pass ets gutsily rnet requirements <br /> AISC TABLE N5.4-1 1 RISC TABLE N5.4-2 2 AISC TABLE N5.4-3 3 <br /> INSPECTION TASKS PRIOR TO WELDING S-3 INSPECTION TASKS DURING WELDING S-3 INSPECTION TASKS AFTER WELDING S-3 <br /> TABLE N5.6-1 <br /> Inspection Tasks Prior to Bolting <br /> inspection Tasks Prior to Bolting QC QA TABLE N5.6-2 <br /> Manufacturer's certifications available for fastener materials 0 P Inspection Tasks During Bolting <br /> Fasteners narked in accordance with ASTM requirements 0 0 inspection Tasks During Bolting QC QA <br /> Proper fasteners selected for the joint detail(grade,type,bolt 0 O Fastener assemblies,of suitable condition,placed in al holes p 0 TABLE N5.6-3 <br /> lengthif threads are to be extuded from shear plane) and washers(if required)are positioned as required Inspection Tasks After Bolting <br /> Proper bolting procedure selected for joint detail 0 0 Joint brought to the snug-tight condition prior to the <br /> Connecting elenents,including the appropriate faying surface pretensioning operation O 0 inspection Tasks After Baiting QC QA <br /> condition and hole preparation,if specified,meet appicable 0 0 Fastener canponent not turned by the wrench prevented from 0 O Document acceptance or rejection of bolted connections P P <br /> requirements rotating <br /> Pre-inflation verification testing by instalalon personnel Fasteners are preten stoned in accordance with the RCSC <br /> observed and documented for fastener assembles and P 0 Specification,progressing systerreticely from the most rigid 0 0 <br /> methods used point toward the free edges <br /> Proper storage provided for bolts,nuts,washers and other 0 0 <br /> fastener components <br /> • <br /> AISC TABLE N5.6-1 4 AISC TABLE N5.6-2 5 AISC TABLE N5.6-3 6 <br /> INSPECTION TASKS PRIOR TO BOLTING S-3 INSPECTION TASKS DURING BOLTING _S-3 INSPECTION TASKS AFTER BOLTING S-3 <br /> DEFINITIONS: . <br /> QC - QUALITY CONTROL PROVIDED BY THE FABRICATOR AND ERECTOR <br /> QA - QUALITY ASSURANCE PROVIDED BY OTHERS QUALIFIED TO PERFORM SPECIAL INSPECTIONS <br /> O - OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED <br /> PENDING THESE INSPECTIONS. <br /> P - PERFORM THESE TASKS FOR EACH WELDED JOINT OR MEMBER OR FOR EACH BOLTED <br /> CONNECTION. <br /> NOTES: <br /> PER AISC N5.6 (1), FOR SNUG-TIGHT JOINTS, PRE-INSTALLATION VERIFICATION TESTING AS SPECIFIED <br /> IN TABLE N5.6-1 AND MONITORING OF THE INSTALLATION PROCEDURES AS SPECIFIED IN TABLE N5.6-2 <br /> ARE NOT APPLICABLE. THE QC AND QA INSPECTORS NEED NOT BE PRESENT DURING THE INSTALLATION <br /> OF FASTENERS IN SNUG-TIGHT JOINTS. SNUG-TIGHT JOINTS ARE ALLOWED IF LOCKING DEVICES ARE <br /> INSTALLED. OTHERWISE BOLTS SHALL BE TIGHTENED USING THE TURN-OF-THE-NUT METHOD AS <br /> DESCRIBED IN SPECIFICATION FOR STRUCTURAL JOINTS USING A325 OR A490 BOLTS. <br /> ISSUE DATE REV NO. REVISION DESCRIPTION BY <br /> PER AISC N7, QUALITY ASSURANCE (QA) INSPECTIONS. EXCEPT NONDESTRUCTIVE TESTING (MDT), MAY C 07-23-20 AS, GSUE FINAL MODIFICANON DRAWINGS K.P.W. <br /> BE WAIVED WHEN THE WORK IS PERFORMED IN A FABRICATING SHOP OR BY AN ERECTOR APPROVED - Y ,, 0 <br /> BY THE AUTHORITY HAVING JURISDICTION (AJH) TO PERFORM THE WORK WITHOUT QA. <br /> STRUCTURAL OBSERVATION BY NWTE SHALL BE CARRIED OUT AT THE TIME THE STRUCTURAL WORK IS �' Of Ip<' <br /> a <br /> COMPLETED. CONTRACTOR SHALL COORDINATE WITH NWTE IN ORDER TO SCHEDULE A SITE VISIT WITH x " Ja ': SHEET SPECIAL INSPECTIONS AND <br /> CONTRACTOR PRESENT. NWTE WILL CLIMB THE TOWER AND VISUALLY OBSERVE THE STRUCTURAL 4.:i 1 �' TITLE STRUCTURAL OBSERVATIONS <br /> MODIFICATION WORK AND VERIFY THAT THE WORK HAS BEEN DONE IN ACCORDANCE WITH THE <br /> CONSTRUCTION DRAWINGS. VISUAL OBSERVATIONS WILL BE MADE OF THE NEW STRUCTURAL MEMBERS ,T Al I: <br /> AND CONNECTIONS. NWTE WILL SUBMIT TO THE BUILDING OFFICIAL A WRITTEN STATEMENT SUMMARIZING . 1�,r-i 4, ' PROJECT 300-FT GUYED TOWER <br /> THE OBSERVATIONS MADE, INCLUDING ANY DEFICIENCIES WHICH, TO THE BEST OF NWTE'S KNOWLEDGE, e. NorthNest LOCATION RUCKER HILL, EVERETT, WA <br /> HAVE BEEN RESOLVED. ng <br /> ���p,� .4041. ',c} s7 3426 BToROADWr EAYY,, SUITE 302 CLIENT RCA TELECOM <br /> OTHER INSPECTION NOTES AL '' EVERETT, WA 98201 NAME SNO911 <br /> REFER TO G-1 FOR INSPECTION AND OBSERVATIONS REQUIRED FOR WORK OTHER THAN BOLTING AND - ' PHONE: 425.258.4248 <br /> WELDING FAX: 425.258.4289 NOTICE NOT TO OE CONSENT O r Moat iers7ED T T nenrN <br /> 7 23-2� <br /> CURRENT DATE: DRAWN BY: OfEO:ED BY: APPROVED BY: PROJECT NUMBER: SHEET NUMBER: <br /> DEFINITIONS/NOTES - SPECIAL INSPECTIONS & STRUCTURAL OBSERVATIONS I 7 NOT USED 8 - 07-23-20 K.P.W. S.A.D. H.S.C. 200621.13 S-3 <br /> SCALE: NONE 1 S-3 SCALE: NONE S-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.