My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
906 SE EVERETT MALL WAY FRONTIER COMMUNICATIONS 2021-11-02
>
Address Records
>
SE EVERETT MALL WAY
>
906
>
FRONTIER COMMUNICATIONS
>
906 SE EVERETT MALL WAY FRONTIER COMMUNICATIONS 2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:02:20 PM
Creation date
11/2/2021 12:01:41 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
906
Tenant Name
FRONTIER COMMUNICATIONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
114\- <br /> I ARCHITECT ,Q <br /> P.O. Box 92 Phone:425 870-0368 <br /> ukilteo,Washin n 98275 Email:kskurisu@msn.com <br /> February 8, 2020 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett,Washington 98201 <br /> Frontier Communications <br /> Security and IT Department <br /> Move to Everett Mall Way Facility <br /> 906 SE Everett Mall Way, Suite 500 <br /> Everett, Washington <br /> Plan Check No. B2001-028 <br /> Attention: Mr. James Bronder —Associate Engineer,Plans Examiner <br /> This letter is in response to your attached letter dated 2/6/2020,addressing your review <br /> comments as follows: <br /> Item No. 1 <br /> The Drawings have been revised to delete the new wall,which was creating a corridor. A <br /> new 1-hr. fire rated wall and relocated existing 20 min. fire rated labeled corridor door <br /> have been added to the existing corridor at the north end of the space. <br /> Also a new wall at the south end of the space located to avoid creating another corridor. <br /> Item No. 2 <br /> The Fire Protection Note on Sheet A-1 has been revised eliminating the reference to fire <br /> sprinkler work. The current building is not sprinklered and no sprinkler work will be <br /> added. <br /> The Drawings have been revised to reflect these revisions and are submitted with this <br /> letter. <br /> Please call me if you have any additional questions or require any additional information. <br /> Thank you. IIID 1 ©I {IV <br /> ED <br /> Sincerely, FEB 10 2020 <br /> Kord Kurisu-Architect CITY OF EVERETT <br /> attachments: City of Everett Review Letter Permit Services <br /> Revised Drawing Sheet A-1 and A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.