Laserfiche WebLink
• • <br /> Fc TPM <br /> -\\.7 <br /> 5/9/2019 <br /> Ray Kirtley <br /> Everett Mall Office Building <br /> 1010 SE Everett Mall Way <br /> Everett, WA 98208 <br /> RE: EMOB ADA Restroom Upgrades <br /> Assumption & Clarifications: <br /> • All work performed during normal business hours 7:00 am to 5:00 pm. <br /> • All supervision, coordination, labor, paint, material, equipment and cleanup included. <br /> • The estimated cost below is for the Men's and Women's restrooms <br /> Scope of Work: <br /> • Remove the existing partition panels, and doors and stack for reuse. <br /> • Layout existing partition panels and doors to provide ADA clearance at each stall and reinstall. <br /> Proposed Cost: $2,368.00 Excluding WSST <br /> Scope of Work: <br /> • Demo existing door and frames to be reused. <br /> • Frame new opening into the restroom to re-swing the doors. Patch walls at old doorway, <br /> drywall and finish tape to match surrounding wall finishes. <br /> • Paint walls, door frames and door. <br /> • Switch door swing to meet ADA clearance requirements. Hang doors. <br /> Proposed Cost: $6,222.00 Excluding WSST <br /> Scope of Work: <br /> • Tile repairs for walls,floor and base. <br /> • Add grab bars and provide pipe insulation at sinks. <br /> Proposed Cost: $5,792.00 Excluding WSST <br /> Scope of Work: <br /> • Management cost,taxes and insurance and overhead and profit. <br /> Proposed Cost: $3,147.00 Excluding WSST <br /> 1 l L <br /> CONSTRUCTION J PRESERVATION I MAINTENANCE <br /> PO BOX 1 1 2 3 SNOHOMSH W A 9 3 2 9 1 i 3 6 0 . 863 6 7 0 5 C P M N W C O M <br />