My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10121 EVERGREEN WAY PIZZA HUT 2021-11-02
>
Address Records
>
EVERGREEN WAY
>
10121
>
PIZZA HUT
>
10121 EVERGREEN WAY PIZZA HUT 2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 4:21:42 PM
Creation date
11/2/2021 4:15:59 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10121
Tenant Name
PIZZA HUT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIZZA HUT, DELCO DRIVER'S WORKSTATION METRO <br /> Metro Model #PHDW48A <br /> Item #T62A Parts <br /> (1) WGBRKT Grid Wall Brackets <br /> Tools Needed (1) WG1836K2,Wall Grid 18"x36"Grid <br /> Rubber Mallet (2) PBA-1 BH, Bin Holders 1111 <br /> Tape Measurer (2) SB91516CAS, Black Bins17 <br /> (1) DL91516CAS, Bin Dividers - "1 it Basket for <br /> (1) H210K2, Basket _ ( Credit Card <br /> (1) 1830FS, Solid Shelf / Imprinters <br /> (1) HFCB, set Post/Shelf Connectors <br /> (2) 13PK2, 14"Posts _ <br /> (2) 1848NK2, Wire Shelves <br /> (4) 33PK2, 34 1/2" Posts Pepper Cheese <br /> (6) CSM6-Y,Yellow Shelf Markers MAP <br /> Ni <br /> (3) Bags of Black Split Shelves ® (30"x36") <br /> (3) DD18K2, Shelf Divider I'll <br /> (1) L18N-4K2, Shelf Ledge <br /> Assembly Instructions Knife/ <br /> 1) Place Split Sleeves on each 33PK2 post 6"above the — Fork Napkins <br /> floor. Place one of the 1848NK2 Wire Shelves over the <br /> posts and onto the Split Sleeves.Tap each corner with the — <br /> Rubber Mallet to secure in place. <br /> 2) Place Split Sleeves on each 33PK2 post 20"above the .- <br /> floor. Place the remaining 1848NK2 Wire Shelf over the 0 <br /> posts and onto the Split Sleeves. Secure in place. <br /> 3) Place Split Sleeves on the top groove of the right posts <br /> and the top groove of the 13PK2 posts. Remove the leveling Bag y Fork/Knife 2 <br /> bolt from the bottom of each 13PK2 post. Place the 1830FS Holder ¢ `m Y Back Up Supply <br /> Solid Shelf onto the split sleeves. Make sure the 13PK2 > m (Cap. = 1 Carton) a <br /> posts are on the left side of the shelf. Attach the 13PK2 posts <br /> to the wire shelf with the HFCB Connector Set. Secure i _ 1 <br /> shelf in place. <br /> a <br /> 4) Mount the WG1836K2 Grid vertically, 38"above the floor <br /> using the WGBRKT Wall Brackets according to bracket a <br /> instructions. Grid should be mounted on the far left side of the ®i Shelf <br /> Driver's Workstation as shown. Place each Bin Holder on the i ml <br /> grid as shown. Put dividers in the middle of each bin and GI Ledge <br /> hang the bins as shown. Place the Basket as shown. 0 ® �..�I <br /> Romano Crushed Crushed Napkin Bundles i <br /> 5) Place the divider on the shelf as shown to create bins. Cheese Pepper Pepper (Capacity= 16) "I <br /> Place the Shelf Markers on the shelves as shown. Place - - <br /> the single ledge on the right side as shown. INSTR-PHDW48A1 <br /> 09/20/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.