Laserfiche WebLink
Project Summary, pg L PROJ-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> General Info Project Title: BECU Everett Financial Center Date 4/18/2019 <br /> C406 Additional Building level efficiency options: Current Scope Previous Projects <br /> Efficiency Package C406.8 Enhanced envelope performance ❑✓ 0 <br /> Options Summary C406.9 Reduced air infiltration <br /> A minimum of two Options are C406.5 On-site renewable energy ❑ <br /> required for new construction, <br /> and change in space Building area level efficiency options <br /> conditioning or occupancy <br /> projects. <br /> C406.2 More efficient HVAC equipment <br /> Select all Options included in <br /> the current project scope. C406.6 Dedicated outside air systems(DOAS) ❑ <br /> Also select Options complied <br /> with under previous projects C406.7 Reduced energy use in service water heating ❑ <br /> (shell and core,other tenant <br /> spaces in building,etc) C406.3 Reduced lighting power ❑ <br /> Buildings with multiple tenant <br /> spaces may comply with C406.4 Enhanced digital lighting controls <br /> different options(mix& <br /> match). C406 Comments: <br /> Options are required for all We discussed energy code requirements with City of Everett during the design phase and were told <br /> space conditioning categories. that whole building air barrier retrofit is not required.We have detailed seals around reinstalled <br /> Include discipline specific windows to reduce air infiltration compared to the existing condition. <br /> information for C406 options <br /> in ENV-SUM,LTG-SUM and <br /> Refer to SBCC website for <br /> official interpretations <br /> regarding C406 provisions. <br /> 141 <br /> a <br />