Laserfiche WebLink
5/12/2021 Page 2 <br /> City of Everett ` lix <br /> 7:34:41AM <br /> INSPECTION ACTIVITY REPORT <br /> 3/26/2021 3/26/2021 BLDG KMK PARTIAL APPR see notes 3/25/2021 7:06 PM NIGHTHAWK <br /> 08-FRAMING CONSTRUCTION LLC <br /> Pic to be sent for reference <br /> Contact Name:NIGHTHAWK <br /> CONSTRUCTION LLC <br /> Site Address:515 104TH PL SE <br /> Phone:4253082330 <br /> e-Mail: <br /> JERRY@NIGHTHAWKCONSTRUCTION <br /> LLC.COM <br /> (3/26/2021 11:19 AM KMK) <br /> 1.Leave laundry and bathroom lids open <br /> for mechanical inspection.Do not insulate <br /> or cover these areas until they have been <br /> inspected by the mechanical inspector. <br /> Note:Regarding electrical inspection: <br /> contractor spoke with electrical inspector <br /> Steve Banks this morning regarding L&I <br /> inspection.OK to proceed per conversation. <br /> 3/29/2021 3/29/2021 BLDG KMK CORRECTION 3/25/2021 7:06 PM NIGHTHAWK <br /> 10-DRYWALL CONSTRUCTION LLC <br /> Pic to be sent for reference <br /> Contact Name:NIGHTHAWK <br /> CONSTRUCTION LLC <br /> Site Address:515 104TH PL SE <br /> Phone:4253082330 <br /> e-Mail: <br /> JERRY@NIGHTHAWKCONSTRUCTION <br /> LLC.COM <br /> (3/26/2021 11:19 AM KMK) <br /> KMK changed Inspection Date/Time from <br /> 03/26/2021 to 03/29/2021 <br /> (3/29/2021 3:41 PM KMK) <br /> Please work with your mechanical inspector <br /> to resolve todays mechanical corrections. <br /> Complete mechanical rough in inspection. <br /> Do not cover as noted in framing inspection <br /> 3/26. <br /> 4/2/2021 4/2/2021 BLDG KMK APPROVAL <br /> 10-DRYWALL <br /> 4/2/2021 4/2/2021 BLDG KMK APPROVAL <br /> 08-FRAMING <br /> 5/11/2021 5/11/2021 BLDG 16-FINAL KMK APPRVD-PERK eTRAKiT Inspection 5/10/2021 11:27 PM NIGHTHAWK <br /> Request CONSTRUCTION LLC <br /> Contact Name:NIGHTHAWK <br /> CONSTRUCTION LLC <br /> Site Address:515 104TH PL SE <br /> Phone:4253082330 <br /> e-Mail: <br /> JERRY@NIGHTHAWKCONSTRUCTION <br /> LLC.COM <br /> INSP12 � fiM <br />