Laserfiche WebLink
5/12/2021 - Page 2 <br /> City of Everett �.. <br /> 7:34:21AM <br /> INSPECTION ACTIVITY REPORT <br /> 3/31/2021 3/31/2021 MECH 04-ROUGH TAHU PARTIAL APPR eTRAKiT Inspection 3/30/2021 5:16 PM NIGHTHAWK <br /> IN Request CONSTRUCTION LLC <br /> Kitchen vent is a down draft and cannot be <br /> installed until cabinets and stove are <br /> installed. Dryer will be installed once <br /> drywall is completed. There will be an <br /> external lint trap. Both bathroom fans are <br /> insulated and all corrections were made as <br /> per stated. <br /> Contact Name:NIGHTHAWK <br /> CONSTRUCTION LLC <br /> Site Address:515 104TH PL SE <br /> Phone:4253082330 <br /> e-Mail: <br /> JERRY@NIGHTHAWKCONSTRUCTION <br /> LLC.COM <br /> (3/31/2021 11:16 AM TAHU) <br /> 1)Kitchen exhaust hood will have a <br /> downdraft exhaust being installed after the <br /> cabinets are in,(check at final) <br /> 2)hallway bathroom corrections were not <br /> made,.see inspection notes on 3/29/21 <br /> 3)exhaust fans on west end of the house, <br /> are now insulated and shortened in length <br /> and straps.These corrections are complete <br /> for the west end of the House:for the <br /> laundry and bathroom. <br /> Jerry is going to send me pic's of the <br /> corrections in hallway bathroom <br /> 4/1/2021 4/1/2021 MECH 04-ROUGH TAHU APPROVAL <br /> IN <br /> 5/11/2021 5/11/2021 MECH 06-FINAL TAHU APPROVAL eTRAKiT Inspection 5/10/2021 11:26 PM NIGHTHAWK <br /> Request CONSTRUCTION LLC <br /> Contact Name:NIGHTHAWK <br /> CONSTRUCTION LLC <br /> Site Address:515 104TH PL SE <br /> Phone:4253082330 <br /> e-Mail: <br /> JERRY@NIGHTHAWKCONSTRUCTION <br /> LLC.COM <br /> INSP12 <br />