My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14 E CASINO RD CHILD STRIVE 2022-01-14
>
Address Records
>
E CASINO RD
>
14
>
CHILD STRIVE
>
14 E CASINO RD CHILD STRIVE 2022-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 7:28:44 AM
Creation date
11/9/2021 11:11:44 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
14
Tenant Name
CHILD STRIVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 E Casino Road <br />June 6, 2019, 2019 <br />Page 2 of 2 <br />increasing access to education, economic opportunities and social networks. The proposed <br />reconfiguration of existing interior spaces allows for the inclusion of vital services, programs and <br />resources that have been turned away in the past solely due to a lack of space in which to house <br />them. The proposed design is not only based on the experience gathered from the use of the <br />current space, but also an extensive community design process that carefully considered all <br />requirements of the community and the project's program, including the toilet facilities. Requiring <br />an increase in the number of toilets and/or toilet rooms would provide no tangible benefit to this <br />underserved community while both incurring further expense and reducing other vital parts of the <br />project's program — a program that aims to benefit an underserved community on a very limited <br />budget. <br />Based on these factors, the on -site empirical evidence of the facility operator, and our <br />professional judgment and experience, we request that this project be approved with the <br />proposed toilet facilities, comprised of two existing toilet rooms, one women's and one men's, <br />and one new fully accessible family toilet room. <br />Thank you for your consideration. <br />Sincerely, <br />Markus Barrera-Kolb <br />Project Manager <br />Direct phone — 206.787.1381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.