Laserfiche WebLink
10/15/2021 <br />6:27:28AM <br />City of Everett <br />INSPECTION ACTIVITY REPORT <br />Page <br />3 <br />J <br />Permit No. C1809-005 Site Address 6223 KENWOOD DR <br />Applied 9/24/2018 Applicant THOMPSON PAUL Lot <br />Approved 1/8/2019 Owner IAZEOLLAANTHONY Block <br />Issued 1/10/2019 Contractor FIRST PHASE CONSTRUCTION Tract <br />Parent Permit No. PW 1812-031 Description NEW SFR DETACHED <br />Notes (12/13/2018 8:19 AM TRN) <br />PERMIT CONDITIONS: 1. Downspouts shall discharge to splash blocks. 2. Erosion control measures <br />shall be installed. 3. No dirt, etc. to be tracked onto roadway. <br />Scheduled ComDleted TvDe Inspector <br />Result Remarks <br />Inspector's Comments <br />1/17/2019 1/17/2019 BLDG KMK <br />APPROVAL eTRAKiT Inspection <br />1/16/2019 6:30 PM Tony Iazeolla <br />03-FOUNDATION <br />Request <br />Thursday afternoon inspection <br />Thanks <br />Contact Name: Tony Iazeolla <br />Site Address: 6223 KENWOOD DR <br />Phone:4257543300 <br />e-Mail: tonyi@first-phase.net <br />1/17/2019 1/17/2019 BLDG KMK <br />APPROVAL eTRAKiT Inspection <br />1/16/2019 6:32 PM Tony Iazeolla <br />02-FOOTING/SETB <br />Request <br />1/17/2019 1/17/2019 <br />1/24/2019 1/24/2019 <br />1/25/2019 1/25/2019 <br />1/29/2019 1/29/2019 <br />BLDG 04-UFER KMK <br />GROUND <br />PLUMB SDP <br />02-GROUND <br />PLUMB <br />02-GROUND <br />BLDG <br />06-UNDERSLAB <br />SDP <br />KMK <br />Contact Name: Tony Iazeolla <br />Site Address: 6223 KENWOOD DR <br />Phone:4257543300 <br />e-Mail: tonyi@first-phase.net <br />APPROVAL eTRAKiT Inspection 1/16/2019 6:33 PM Tony Iazeolla <br />Request <br />CORRECTION eTRAKiT Inspection <br />Request <br />APPROVAL <br />APPROVAL eTRAKiT Inspection <br />Request <br />Contact Name: Tony Iazeolla <br />Site Address: 6223 KENWOOD DR <br />Phone:4257543300 <br />e-Mail: tonyi@first-phase.net <br />1/23/2019 7:54 PM <br />Afternoon inspection <br />Contact Name: Tony Iazeolla <br />Site Address: 17310 107th Ave SE <br />Phone:4257543300 <br />e-Mail: tonyi@first-phase.net <br />(1/24/2019 3:32 PM SDP) <br />Toilet and tub are not vented properly. Tub <br />waste must be 2", trap arm 1 1/2" and 1 <br />1/2" vent shall be rolled up. Toilet vent <br />shall be downstream of the trap arm and <br />rolled up. System test must have a ten foot <br />head. <br />1/27/2019 6:00 PM <br />Please Afternoon inspection. <br />Thanks Tony <br />Contact Name: Tony Iazeolla <br />Site Address: 17310 107th Ave SE <br />Phone:4257543300 <br />e-Mail: tonyi@first-phase.net <br />INSP12 Cr I SYSTEMS <br />