My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
17 E MARINE VIEW DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:08:39 PM
Creation date
11/9/2021 2:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Stormwater Site Inspection Form <br />Project Name Permit # Inspection Date Time <br />Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre <br />Print Name: <br />Approximate rainfall amount since the last inspection (in inches): <br />Approximate rainfall amount in the last 24 hours (in inches): <br />Current Weather Clear Cloudy ❑ Mist Rain Wind Fog <br />A. Type of inspection: Weekly ❑ Post Storm Event Other <br />B. Phase of Active Construction (check all that apply): <br />Pre Construction/installation of erosion/sediment Clearing/Demo/Grading Infrastructure/storm/roads <br />controls <br />Concrete pours Vertical Utilities <br />Construction/buildings <br />Offsite improvements Site temporary stabilized Final stabilization <br />C. Questions: <br />1. <br />Were all areas of construction and discharge points inspected? <br />Yes <br />No <br />2. <br />Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen <br />Yes <br />_ _ <br />No <br />3. <br />Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5) <br />Yes <br />_ _ <br />No <br />4. <br />Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?* <br />Yes <br />_ _ <br />No <br />5. <br />If yes to #4 was it reported to Ecology? <br />Yes <br />_ _ <br />No <br />6. <br />Is pH sampling required? pH range required is 6.5 to 8.5. <br />Yes <br />_ <br />No <br />If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken, <br />and when. <br />*If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33 <br />cm or greater. <br />Sampling Results: <br />Date: <br />Parameter ° <br />:`Method Icircle one) <br />Result <br />Other./_Note <br />iVTU ' <br />: -cm <br />pH,, <br />Turbidity <br />tube, meter, laboratory <br />pH <br />Paper, kit, meter <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.