My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
17 E MARINE VIEW DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:08:39 PM
Creation date
11/9/2021 2:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: <br />1. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO <br />PLANTING. 1y1, <br />2. EACH TREE SHALL BE PLANTED SUCH THAT THE <br />TRUNK FLARE IS VISIBLE AT THE TOP OF THE <br />ROOT BALL (TREES TRUNK FLARES THAT ARE <br />NOT VISIBLE SHALL BE REJECTED) . NO MULCH <br />SHALL COME IN CONTACT WITH THE TREE <br />TRUNK. avol <br />TOP OF ROOTBALL SHALL BE 1" ABOVE <br />SURROUNDING GRADE <br />PREPARED TOP SOIL <br />3 INCHES WOOD CHIP MULCH <br />FINISHED GRADE <br />SCARIFY SIDES OF PLANTING PIT <br />PLACE ROOT BALL ON 7OF <br />-FmfiTl <br />FIRMLY TAMP SOIL AROUND <br />UNEXCAVATEDORTAMPED SOIL IICI-III-ICI-��-I�I ROOT BALL SO ROOT BALL DOES <br />_ 2XTHESIZE-�ii NOTSHIFT <br />ROOT BALL <br />1 NATIVE DECIDUOUS TREE PLANTING <br />SCALE: NTS <br />NOTE: <br />1. SCARIFY BOTTOM AND SIDES OF HOLE <br />PRIOR TO PLANTING. <br />2. EACH TREE SHALL BE PLANTED SUCH THAT <br />THE TRUNK FLARE IS VISIBLE AT THE TOP <br />OF THE ROOT BALL (TREES TRUNK FLARES <br />THAT ARE NOT VISIBLE SHALL BE <br />REJECTED). NO MULCH SHALL COME IN <br />CONTACT WITH THE TREE TRUNK. <br />REMOVE SOIL FROM AND MATCH TC <br />OF ROOT FLARE TO EXISTING GRADE <br />DO NOT CUT LEADER, PRUNE <br />DAMAGED WOOD PRIOR TO <br />PLANTING. REMOVE TWINE FROM <br />BRANCHES <br />CROWN 1" ABOVE GRADE <br />3 INCHES WOOD CHIP MULCH <br />ro <br />FINISHED GRADE <br />PREPARED TOP SOIL <br />=1 I 1=111-111=111-111- 11�' 11 r� FIRMLY TAM P SOIL AROUND <br />2 X THE SIZE -' 1= - ROOT BALL SO ROOT BALL <br />OF ROOT BALL DOES NOT SHIFT <br />2 NATIVE EVERGREEN TREE PLANTING <br />LS-2 SCALE: NTS <br />APPLY 2 INCHES COMPOST <br />TOPSOIL RIPPED TO A <br />DEPTH OF12INCHES <br />PROVIDE POSITIVE DRAINAGE; <br />SEE GRADING PLAN FOR FINISH <br />ELEVATIONS <br />- - WOOD CHIP o <br />MULCH z <br />PLANTING NOTES: <br />1. PLANTINGS SHALL BE IN ACCORDANCE WITH APPROVED PERMITS. <br />2. VERIFY THE LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION AND CALL UTILITY LOCATE SERVICE 72 <br />HOURS PRIOR TO START OF WORK. EXERCISE CARE TO PROTECT UNDERGROUND UTILITIES. ANY DAMAGE <br />TO EXISTING UTILITIESTO REMAIN MUST BE RESTORED ATTHE CONTRACTOR'S EXPENSE. <br />3. PROVIDE 12 INCHES OF TOPSOIL. EXAMINE FINISH SURFACE, GRADES, TOPSOIL QUALITY AND DEPTH. <br />CONTRACTOR TO NOTIFY OWNER OF ANY CONDITIONS WHICH MAY BE HARMFUL TO PLANT LIFE, SUCH AS <br />RECYCLED ASPHALT, CONSTRUCTION RUBBLE, POOR DRAINAGE, HAZARDOUS MATERIALS, ETC. THE <br />CONTRACTOR SHALL MAKE A RECOMMENDATION TO ADDRESS THE SPECIFIC SITUATION. DO NOT <br />CONTINUE ANY WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. <br />4. PRIOR TO PLACING SOIL AMENDMENTS AND PLANTING, CONDUCT BASIC LANDSCAPE SOIL TESTS. COLLECT <br />SOIL SAMPLES FROM THREE LOCATIONS WITHIN RESTORATION AREA AND TEST FOR NUTRIENTS AND <br />ORGANICMATTER. PLACE COMPOST AND ADDITIONAL SOIL AMENDMENTS PER TEST RECOMMENDATIONS <br />FOR SPECIFIED PLANT SPECIES AND INCORPORATE INTO TOPSOIL. COORDINATE WORK SHOWN ON THIS <br />DRAWING WITH GRADING WORK. MAINTAIN POSITIVE DRAINAGE IN ALL LANDSCAPE AREAS AND PROVIDE <br />EROSION CONTROL. SEE CIVIL PLANS. <br />5. DO NOT REMOVE ANY TREES IDENTIFIED TO REMAIN DURING CONSTRUCTION WITHOUT WRITTEN CONSENT <br />OF THE OWNER. EXISTING VEGETATION TO REMAIN SHALL BE PROTECTED. <br />6. CONTRACTOR TO VERIFY ALL QUANTITIES, MEASUREMENTS, AND SITE CONDITIONS. PROVIDE QUANTITY OF <br />PLANT MATERIAL ON PLAN OR PLANT SCHEDULE, WHICHEVER IS GREATER OR TO COVER AT SPECIFIED <br />SPACING. <br />7. OBTAIN WRITTEN APPROVAL FOR ALL PLANT MATERIAL AND SIZE SUBSTITUTIONS FROM THE OWNER PRIOR <br />TO INSTALLATION. PLANT SUBSTITUTIONS WITHOUT PRIOR WRITTEN MAY BE REJECTED BY THE OWNER. <br />8. AFTER GRADING IS COMPLETE, PREPARE THE PLANTING AREAS AS FOLLOWS: <br />a. RIP NATIVE SOILTOA DEPTH OF 12 INCHES. <br />b. REMOVE COBBLES, ROCKS, CONCRETE, ASPHALT AND OTHER DEBRIS OVER 1" DIAMETER. <br />c. CONDUCTSOILTEST, SEE NOTE NOA <br />d. PLACE 2 INCHES OF COMPOST IN PLANTING AREAS. ROTOTILL COMPOST INTO TOPSOIL TO A DEPTH OF 8 <br />INCHES. <br />e. LIGHTLY SMOOTH PLANTING AREAS AND OBTAIN APPROVAL FORM OWNER PRIOR TO PLANTING. <br />f. PRIOR TO PLANTING, APPLY HERBICIDE TO PLANTING AREA TO REMOVE ANY NON-NATIVE VEGETATION. <br />g. ALL INVASIVE AND/OR NOXIOUS WEEDS MUST BE ERADICATED. <br />9. INSTALL PLANTINGS PER PLANS AND DETAILS. ALL PLANT MATERIALS SHALL BE NURSERY GROWN, <br />CONTAINERIZED MATERIALS IN VIGOROUS GROWING, WELL -ROOTED CONDITION. <br />10. UPON COMPLETION OF PLANT INSTALLATION, APPLY 3 INCHES OF WOOD CHIP (HOG FUEL) MULCH TOTHE <br />ENTIRE PLANTING AREA SHOWN ON THE PLANS. FINELY GRADE MULCH AWAY FROM TREE TRUNKS AND <br />SHRUB STEMS. DO NOT PLACE MULCH DIRECTLY AGAINST TREE TRUNKS OR STEMS. <br />11. PROVIDE TEMPORARY IRRIGATION OR MANUAL WATERING FOR THE TWO COMPLETE GROWING SEASONS. <br />SEE DESIGN -BUILD TEMPORARY IRRIGATION NOTES. <br />12. PROVIDE 4 INCHES OF 1-1/4"- MINUS GRAVEL IN GRAVEL SURFACING AREAS AS SHOWN ON PLANS AND <br />DETAILS. <br />13. LANDSCAPE MAINTENANCE PERIOD BEGINS IMMEDIATELY AFTER THE COMPLETION OF ALL PLANTING <br />OPERATIONS AND WRITTEN NOTIFICATION TO THE OWNER. MAINTAIN PLANTINGS FOR A PERIOD OF 90 <br />DAYS AFTER ACCEPTANCE. <br />a. PROVIDE PLANT MAINTENANCE INCLUDING WATERING, MONTHLY WEEDING, AND DEBRIS REMOVAL AS <br />NECESSARY TO PROMOTE SUCCESSFUL PLANT ESTABLISHMENT. <br />b. PROVIDE WEED CONTROL AND DEBRIS REMOVAL IN GRAVEL SURFACING AREA. <br />14. PROVIDE A 1 YEAR WARRANTY FOR PLANTS. REPLACE ANY DEAD OR DYING PLANT MATERIALS AT THE END <br />OF THE WARRANTY PERIOD. <br />NOTE: <br />1. SCARIFY BOTTOM AND SIDES <br />OF HOLE PRIOR TO PLANTING. <br />SET TOP OF POTTING SOIL 1" <br />ABOVE FINISHED GRADE <br />REMOVE CONTAINER <br />FROM ROOT BALL, <br />ROUGHEN ROOTBALLTO <br />LOOSEN ROOTS <br />3 INCHES WOOD CHIP <br />MULCH <br />FINISHED GRADE <br />PREPARED TOP SOIL <br />TEMPORARY IRRIGATION NOTES: <br />1. DESIGN AND BUILD A TEMPORARY IRRIGATION SYSTEM TO PROMOTE SUCCESSFUL PLANT <br />ESTABLISHMENT AND FOR THE FIRST TWO FULL GROWING SEASONS. <br />2. PROVIDE THE OWNER WITH A PLAN OF THE PROPOSED LAYOUT, DESIGN CALCULATIONS <br />AND EQUIPMENT LIST PRIOR TO INSTALLATION FOR THE IRRIGATION SYSTEM. <br />3. WORK AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH THE LATEST CODES, <br />REGULATIONS N AND OTHER APPLICABLE LAWS. NOTHING IN THE CONTRACT DOCUMENTS <br />ARE TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. <br />4. INSTALLATION AND MAINTENANCE OF IRRIGATION SYSTEM SHALL BE PER BEST <br />MANAGEMENT PRACTICES PER IRRIGATION ASSOCIATION WWW.IRRIGATION.ORG. <br />5. INSTALLA NEW STATE APPROVED DOUBLE-CHECK VALVE FOR IRRIGATION SUPPLY, <br />COORDINATE LOCATION WITH OWNER. POINT OF CONNECTION WATER PRESSURE TEST <br />REQUIRED PRIOR TO IRRIGATION DESIGN. <br />6. PROVIDE A TEMPORARY IRRIGATION SYSTEM MEETING THE FOLLOWING CRITERIA: <br />a. IRRIGATION HEADS, NOZZLES, AND LOCATIONSTO BE ADJUSTED TO PROVIDE <br />PLANTINGS WITH HEAD -TO -HEAD WATER COVERAGE. MINIMIZE OVERSPRAY ON TO <br />ADJACENT PAVING, FENCES OR EQUIPMENT. <br />b. MAIN LINESTO BE SCHEDULE 40 PVC PIPE. <br />c. LATERAL LINES TO BE CLASS 200 PVC PIPE. <br />d. PROVIDE DRAIN VALVES AT LOW POINTS ON MAIN LINE. <br />e. USE 45-DEGREE ELLS INSTEAD OF 90-DEGREE ELLS ON ALL MAINLINES 2-1/2" AND <br />LARGER. <br />f. REMOTE CONTROL VALVES TO BE PROPERLY ADJUSTED FOR CORRECT OPERATING <br />PRESSURE OF IRRIGATION DISTRIBUTION EQUIPMENT. <br />g. LOCATE VALVES AND PIPES AT LEAST 24-INCHES FROM HARDSCAPE AND PAVEMENT <br />h. PROVIDE AN AUTOMATIC IRRIGATION CONTROLLER TO OPERATE IRRIGATION SYSTEM. <br />INSTALL CONTROLLER ON A PEDESTAL, COORDINATE LOCATION WITH OWNER. IF <br />REQUIRED, PROVIDE AC POWER FOR AUTOMATIC CONTROLLER. <br />I. IRRIGATION LINES AND CONTROL WIRES UNDER PAVEMENT SHALL BE INSTALLED IN A <br />SCHEDULE 40 PVC SLEEVE. <br />7. IRRIGATION MAIN AND LATERAL LINES MAY BE INSTALLED ABOVE GRADE AND SECURED <br />WITH STAKES OR OTHER APPROVED METHOD. <br />8. FLUSH AND PURGE IRRIGATION SYSTEM OF AIR AND CONDUCT A PRESSURE TEST FOR <br />MAIN LINE. TEST WITH A MINIMUM STATIC WATER PRESSURE OF 100 PSI OR TO THE <br />PRESSURE EXPECTED TO BE DELIVERED ATTHE SITE FOR 60 MINUTES. <br />9. COORDINATE IRRIGATION HEAD, PIPE, VALVE AND DRAIN LAYOUT WITH NEW PLANT <br />MATERIALS. <br />10. INSTALL IRRIGATION COMPONENTS PER MANUFACTURERS RECOMMENDATIONS AND <br />PROPERLY ADJUST TO PROVIDE ADEQUATE COVERAGE AND MINIMIZATION OF OVER <br />SPRAY. <br />11. WORK SHALL BE INSTALLED IN SUCH A MANNER ASTO AVOID CONFLICTS BETWEEN <br />IRRIGATION SYSTEM, PLANTING, FENCING AND UTILITIES. <br />12. PROGRAM AUTOMATIC CONTROLLER/STO ALLOW FOR THE EQUIVALENT OF 1 INCH OF <br />WATER PER WEEK. FREQUENCY OF WATERING WILL DEPEND ON THE MOISTURE <br />RETENTION CAPACITY OFTHE SOILS AND WEATHER AND PRECIPITATION PATTERNS. <br />13. IRRIGATION MAINTENANCE PERIOD BEGINS IMMEDIATELY AFTERTHE COMPLETION OF <br />ALL IRRIGATION SYSTEM AND WRITTEN NOTIFICATION TO THE OWNER. MAINTAIN <br />IRRIGATION SYSTEM FOR A PERIOD OF TWO YEARS AFTER ACCEPTANCE. CONTRACTOR <br />TO PROVIDE THE OWNER WITH A TYPICAL MAINTENANCE SCHEDULE. THE CONTRACTOR <br />WILL ALSO PROVIDE STEP BY STEP INSTRUCTIONS FOR SHUT DOWN (WINTERIZATION) <br />AND FOR START UP AND ANY ONGOING MAINTENANCE. <br />14. PROVIDE A 1 YEAR WARRANTY FOR IRRIGATION SYSTEM. <br />15. THE CONTRACTOR TO DECOMMISSION AND REMOVE IRRIGATION SYSTEM THE END OF <br />THE MAINTENANCE PERIOD. REMOVED IRRIGATION EQUIPMENTTO BECOMETHE <br />PROPERTY OF THE CONTRACTOR. <br />1-1/4" MINUS GRAVEL <br />SURFACING <br />-n i-i-i-i a-ii-u-i <br />=111 <br />i-n-i-i i-i-i-i n_i ai ni i i-u <br />IIIII IIIII�IIIII��IIII�IIIII��InI Ilillll„III-III-III=III=I I -ill <br />111-III-IITII�IIII�IIIII�IIIIII <br />u- - - <br />- - - - - - - - <br />zxrHEwIDTH <br />NATIVE OR <br />SU GRADED <br />"- -' <br />OF CONTAINER <br />COMPACTED SOIL <br />SOIL PREPARATION <br />PLANTING BED <br />SHRUB PLANTING <br />GRAVEL SURFACING <br />R CALL 48 HOURS <br />3 <br />- <br />4 <br />5 <br />= BEFORE YOU DIG <br />LS-2 SCALE: NTS <br />LS-2 SCALE: NTS <br />LS 2 <br />SCALE: NTS <br />N 1-800-424-5555 <br />�i BergerABAM <br />33301 9th Avenue SouthSuite 300 <br />, <br />Federal Way, Washington 98003-2600 <br />206 431-2300 Fax: 206 431-2250 <br />( ) i ) <br />WAS <br />do dJ SAc �o Z <br />NP dRl o <br />a <br />o ti <br />�q r <br />NoscAVF <br />_Jjrl$ <br />DRAWN BY <br />DESIGN BY <br />CHECK BY <br />PROJ MGR <br />RJW <br />RJW <br />DJS <br />MM <br />LEHIGH HANSON MATERIALS LIMITED <br />DELTA SITE RESTORATION <br />LANDSCAPE RESTORATION DETAILS <br />�+ <br />DRAWING NO. L S-2 <br />PROJECT N0. A18.0229.00 <br />DATE: 9/12/18 <br />SHEET N0. 11 OF 11 <br />" <br />w <br />a <br />y <br />J MARK <br />REVISION DESCRIPTION <br />I BY <br />APP. <br />DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.