My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
17 E MARINE VIEW DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:08:39 PM
Creation date
11/9/2021 2:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The SWPPP will be modified within seven (7) days if inspection(s) or investigation(s) determine <br />additional or modified BMPs are necessary for compliance. An updated timeline for BMP <br />implementation will be prepared. <br />Reporting (6.2) <br />Discharge Monitoring Reports (6.2.1) <br />Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring <br />Reports (DMRs) will be submitted to Ecology monthly. If there was no discharge during a given <br />monitoring period the DMR will be submitted as required, reporting "No Discharge". The DMR <br />due date is fifteen (15) days following the end of each calendar month. <br />DMRs will be reported online through Ecology's WQWebDMR System. <br />To sign up for WQWebDMR go to: <br />https://www.ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality- <br />permits-guidance/WQWebPortal-guidance <br />Notification of Noncompliance (6.2.2) <br />If any of the terms and conditions of the permit is not met, and the resulting noncompliance may <br />cause a threat to human health or the environment, the following actions will be taken: <br />1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable <br />Regional office ERTS phone number (Regional office numbers listed below). <br />2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br />correct the noncompliance. If applicable, sampling and analysis of any noncompliance <br />will be repeated immediately and the results submitted to Ecology within five (5) days of <br />becoming aware of the violation. <br />3. A detailed written report describing the noncompliance will be submitted to Ecology <br />within five (5) days, unless requested earlier by Ecology. <br />Specific information to be included in the noncompliance report is found in Special Condition <br />S5.F.3 of the CSWGP. <br />Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 <br />cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as <br />required by Special Condition S5.A of the CSWGP. <br />• Central Region at (509) 575-2490 for Benton, Chelan, Douglas, Kittitas, Klickitat, <br />Okanogan, or Yakima County <br />
The URL can be used to link to this page
Your browser does not support the video tag.