My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
17 E MARINE VIEW DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:08:39 PM
Creation date
11/9/2021 2:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. An interceptor dike with gravel outlet and silt fence shall surround all <br />topsoil. <br />. Within 2 days complete erosion control seeding, or covering stockpiles <br />with clear plastic, or other mulching materials. <br />. Between May 1 and September 30: <br />. An interceptor dike with gravel outlet and silt fence shall surround all <br />topsoil if the stockpile will remain in place for a longer period of time <br />than active construction grading. <br />. Within 7 days complete erosion control seeding, or covering stockpiles <br />with clear plastic, or other mulching materials. <br />. When native topsoil is to be stockpiled and reused the following should apply to <br />ensure that the mycorrhizal bacterial, earthworms, and other beneficial organisms <br />will not be destroyed: <br />1. Re -install topsoil within 4 to 6 weeks. <br />2. Do not allow the saturation of topsoil with water. <br />3. Do not use plastic covering. <br />Maintenance Standards <br />. Inspect stockpiles regularly, especially after large storm events. Stabilize any <br />areas that have eroded. <br />. Establish soil quality and depth toward the end of construction and once estab- <br />lished, protect from compaction, such as from large machinery use, and from <br />erosion. <br />. Plant and mulch soil after installation. <br />. Leave plant debris or its equivalent on the soil surface to replenish organic matter. <br />. Reduce and adjust, where possible, the use of irrigation, fertilizers, herbicides and <br />pesticides, rather than continuing to implement formerly established practices. <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11 - Chapter 4 - Page 300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.