My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 E MARINE VIEW DR 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
17
>
17 E MARINE VIEW DR 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:08:39 PM
Creation date
11/9/2021 2:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Hydro -demolition <br />. Bridge and road surfacing <br />Design and Installation Specifications <br />. Vacuum slurry and cuttings during cutting and surfacing operations. <br />. Slurry and cuttings shall not remain on permanent concrete or asphalt pavement <br />overnight. <br />. Slurry and cuttings shall not drain to any natural or constructed drainage con- <br />veyance including stormwater systems. This may require temporarily blocking <br />catch basins. <br />. Dispose of collected slurry and cuttings in a manner that does not violate ground <br />water or surface water quality standards. <br />. Do not allow process water generated during hydro -demolition, surface rough- <br />ening or similar operations to drain to any natural or constructed drainage con- <br />veyance including stormwater systems. Dispose process water in a manner that <br />does not violate ground water or surface water quality standards. <br />. Handle and dispose cleaning waste material and demolition debris in a manner <br />that does not cause contamination of water. Dispose of sweeping material from a <br />pick-up sweeper at an appropriate disposal site. <br />Maintenance Standards <br />Continually monitor operations to determine whether slurry, cuttings, or process water <br />could enter waters of the state. If inspections show that a violation of water quality stand- <br />ards could occur, stop operations and immediately implement preventive measures such <br />as berms, barriers, secondary containment, and vacuum trucks. <br />BMP C153: Material Delivery, Storage and Containment <br />Purpose <br />Prevent, reduce, or eliminate the discharge of pollutants to the stormwater system or <br />watercourses from material delivery and storage. Minimize the storage of hazardous <br />materials on -site, store materials in a designated area, and install secondary con- <br />tainment. <br />Conditions of Use <br />These procedures are suitable for use at all construction sites with delivery and <br />storage of the following materials: <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11- Chapter 4 - Page 315 <br />
The URL can be used to link to this page
Your browser does not support the video tag.