My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2022-03-21
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2022-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 9:44:26 AM
Creation date
11/9/2021 2:26:25 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� <br />EVERETT <br />WASHINGTON <br />PUBLICO/ORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2nd Floor <br />Everett, WA 98201 <br />425-257-8810 <br />ate Applied: 1/29/2020 <br />Publicrks Permit #: PW2001-044 <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: $45.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />PORT OF EVERETT <br />BRANDON WHITAKER <br />1205 CRAFTSMAN WAY, STE 200 <br />1205 CRAFTSMAN WAY, STE 200 <br />EVERETT, WA, 98201 <br />EVERETT, WA, 98201 <br />2020 <br />2 9 JAN <br />PHONE: 4253880613 <br />PHONE: 4253880613 <br />TAX PARCEL ID #: <br />SITE ADDRESS: 1300 W MARINE VIEW DR <br />DESCRIPTION: REPAIR SEWER MAIN IN 13TH STREET <br />Use of a water jet nozzle cutter head to break up accumulated grout in sewer pipe on 13th Street and Seiner Drive. Permitted to replace <br />sewer in kind if necessary. Inspections by City of Everett required at all phases of repair and/or replacement. <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per permit scope approved by the City of Everett Public Works Department dated 1/29/2020. Approved <br />plans must remain on job -site at all times. <br />5. Inspections are required for all stages of repair and/or construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to <br />formally request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection <br />online. <br />6. Install and maintain erosion control measures per City of Everett Standards as needed or instructed by the PW Inspector. Remove <br />upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. A video of the sewer inspection shall be turned in to the Public Works Inspector and reviewed and approved by the inspector prior <br />to permit final. If the video shows that the repair is unsatisfactory, sewer main replacement in kind shall be required and is permitted <br />to be performed under this permit to get the sewer main back in working order and to City of Everett approved standards and <br />conditions. Inspections are required for any sewer main or structure replacement. <br />10. Pavement restoration is required to City Standards if any damage or cuts occur to the existing improvements during construction <br />under this permit. <br />10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for i 7r m have been completed. <br />�!)I &@ F <br />Public Works Permit Fee Breakdown: I <br />� <br />iu JAN 19 2020 <br />0 <br />Misc. Minor Permits (sewer main repair) ........... $25.00 <br />PW Site Inspection..............................................$20.00 <br />1 5577 (((������ `i T <br />Cityo Everett Official Use OnlyCK �KPJ E G ��� S CONDITIONS <br />The undersigned ow el c e y agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />!X/ causes of action that may arise because of installation and maintenance of <br />Approved or Construction (Public Works) Date the improvement or other right-of-way use here to applied for and further <br />agrees to remove same upon notice from the City and to replace public <br />property damaged thereby. <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.