Laserfiche WebLink
2020 System Development Fee Calculations <br />Permit #: B2011-025 <br />Additional Notes: <br />Project Address: 2002 Oakes Ave <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: New garage and paving <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />I <br />Sewer District: Everett <br />Prepared By: A. Huang Date: 12/9/2020 <br />Outside City Limits? No <br />*Adds a 25% Surcharge <br />Supportive Housing Credit? INo <br />*Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2011-025 Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />$0.00 Add thisfee to the Building Permit for roof area hordsurfaces. <br />Stormwater System Dev Fee: <br />mwater System Development Fees: <br />it #: PW2012-013 Type of Construction: lExisting Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: 1 615 1 SF <br />Stormwater System Dev Fee: I $157AAdd this fee to the Public Works Permitfor hard surfaces on the ground. <br />9 <br />0 <br />