Laserfiche WebLink
�J <br />x <br />r� <br />You have now completed the Small Project Stormwater Report. <br />Please review any sections you may have skipped to ensure all areas have been completed. <br />Ensure the following attachments have been added. <br />0 Project Specific Stormwater Site Plan <br />N/A ❑ Topographic Survey <br />N/A❑ Declaration of Covenant and Grant of Easement <br />® Construction SWPPP Drawings <br />® Map of Project Site Boundary and the Infiltration Infeasibility Mapping Results <br />KI Worksheet 3 - Sizing Justification Worksheet for your Selected BMP <br />N/A❑ Underground Injection Well (UIC) Registration* <br />* You may need to register with the Washington State Department of Ecology at least 60 <br />days prior to commencing UIC Construction. For more information, visit: <br />everettwa. gov/1985/Stormwater-Technical-Resources <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2079 20 <br />