My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2022-03-11
>
Address Records
>
SHARON DR
>
9600
>
EXPLORER MIDDLE SCHOOL
>
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2022-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 10:53:08 AM
Creation date
11/9/2021 3:50:14 PM
Metadata
Fields
Template:
Address Document
Street Name
SHARON DR
Street Number
9600
Tenant Name
EXPLORER MIDDLE SCHOOL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />r� <br />SOURCES: Portion of total amendment quantity (from line 11) that is: <br />12. Purchased from off -site sources..................................................................... % <br />13. Stockpiled soil and duff from on-site................................................................ % <br />14. Chipped and stockpiled woody material from on -site ........................................... % <br />15. Imported topsoil.......................................................................................... % <br />16. CHECK: The total of lines 12 through 15 should total 100%................................... 100% <br />PLANTING BEDS <br />17. Area of landscaping and planting beds (from line 4 above) z <br />a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br />18. MULCH QUANTITY NEEDED............................................................................. yd3 <br />SOURCES: Portion of total mulch quantity (from line 18) that is: <br />19. Purchased from off -site sources............................................................................ % <br />20. Chipped and stockpiled woody material from on -site .............................................. % <br />21. CHECK: The total of lines 19 and 20 should total 100%......................................... 100% <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.