Laserfiche WebLink
EXPLORER MS PORTABLES <br />UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br />PANEL MDB <br />NEC 220.87 AND WAC 296-46B-900(3)0) <br />MAY 2 2 2020 <br />12 Month Peak Demand (Month & Year) : December- 2019 <br />Phase to Phase Voltage 480 <br />CITY OF EVERETT <br />(Volts) : <br />Phases (1=Single Phase, 3=Three Phase) : 3 <br />permit Services <br />Utility Peak Demand <br />156.4 KW <br />Power Factor <br />/ <br />0.90 (P.F.) <br />Apparent Peak Demand <br />= <br />173.78 KVA <br />NEC 220.87(2) adjustment factor <br />X <br />1.25 KVA <br />Adjusted Peak Demand <br />= <br />217.22 KVA <br />Seasonal adjustment factor <br />X <br />1.00 KVA <br />Seasonal adjustment peak demand <br />= <br />217.22 KVA <br />Occupancy adjustment factor <br />X <br />1.00 KVA <br />Occupancy adjustment peak demand <br />= <br />217.22 KVA <br />Other adjustement factor(s) <br />X <br />1.00 KVA <br />Utility Peak Demand with Adjustments <br />= <br />217.22 KVA <br />New Calculated Demand Load Added PORTABLES <br />+ <br />144.92 KVA <br />Metered Demand Based <br />CALCULATED DEMAND LOAD: 362.14 KVA <br />CALCULATED DEMAND CURRENT: <br />436 AMPS <br />