Laserfiche WebLink
0 • <br />Sabrina Fandler <br />From: <br />David Tyler <br />Sent: <br />Wednesday, July 25, 2018 3:53 PM <br />To: <br />Sabrina Fandler <br />Cc: <br />Tom Hingson; Vincent Bruscas <br />Subject: <br />Planning Comments - Everett Station Park and Ride Expansion <br />Follow Up Flag: <br />Follow up <br />Flag Status: <br />Flagged <br />Sabrina, <br />Planning reviewed the plans submitted for PW permit (PW1807-018) and has the following comments: <br />• Interior Parking Lot Landscaping (Sheet LS1) — The plans show a total of 16 trees within the interior of the <br />parking lot. The standard for interior landscaping within the C-2ES zone is one tree per four parking stalls. For <br />the 90 parking stalls, a total of 23 trees is required. <br />• Please provide a revised layout/landscape plan showing 23 trees within the interior of the parking lot. <br />Thanks <br />CELEBRATING David Tyler <br />125 Senior Planner I Community Planning and Economic Development <br />Y E A R S 425.257.7164 12930 Wetmore #8A Everett, WA 98201 <br />A story worth telling everettwa.gov/planning I Facebook I Twitter <br />1 <br />