Laserfiche WebLink
� A <br />DEMOLITION <br />EVERETT <br />WASHINGTON <br />PERMIT <br />C*Y OF EVERETT <br />PERMIT SERVICES <br />3200 CEDAR STREET EVERETT, WA 98201 <br />(425) 257-8810 <br />Online Inspection Request: ow.everettwa.gov <br />PERMIT NUMBER: D2009-004 <br />DATE <br />JOB ADDRESS: 1512 WALNUT ST <br />APN: 00438731400406 <br />OWNER: 1512 WALNUT- LLC <br />TENANT: <br />PO BOX 5616 <br />EVERETT WA 98206 <br />PHONE: <br />IPHONE: <br />U (C <br />nn <br />DESCRIPTION OF WORK <br />DEMOLITION OF GARAGE/WORK SHOP <br />CONTRACTOR: OWNER <br />APR 9 2021 <br />t ULI <br />�i ry <br />O� <br />SUBJECTTO FIELD INSPECTION. PROPER RODENTABATEMENT <br />t' <br />P� r� <br />emit Service' TZ' <br />REQUIRED PRIOR TO DEMO. CALL FOR INSPECTTON WHEN DEMO <br />IS COMPLETE. <br />CONTRACT PRICE OF WORK: <br />$1 000.00 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. This permit for demolition/removal of building structure only and is subject to field inspection. <br />2. All existing connected water services shall be capped at the back side of the meter prior to demolition of the structure. Owner to <br />contact Utilility Billing to shut off water service and stop billing by sending an email to utilbill@everettwa.gov. <br />3. All existing connected side sewers shall first obtain a separate utility permit for a side sewer cap -off and then be capped at the <br />property line prior to demolition of the structure. <br />4. All existing electrical services shall first obtain an ELECTRICAL ONLINE permit, and then disconnect electrical service prior to <br />demolition of the structure. <br />5. All applicable abatement (asbestos, lead paint, rodent, etc.) shall be completed prior to demolitions per state, local, and federal <br />regulations. It is the owner/applicant's responsibility to contact the appropriate authority and comply with these requirements whether <br />or not described herein. <br />6. Erosion and sedimentation control measures per City standards shall be taken prior to and throughout the demolition. <br />7. No site work, clearing, grading, excavating, or earthwork permitted except to restore building pad after demolition. Building pad area <br />shall be graveled or re -vegetated. No exposed soils permitted. <br />8. No dirt/debris to be tracked onto roadway. <br />9. Request a PW SITE FINAL inspection type online at pw.everettwa.gov when the demolition is completed to close out this permit. <br />PERMITS EXPIRE IF WORK NOT COMMENCED WITHIN 180 DAYS OR CEASES MORE THAN 180 DAYS. <br />FEES <br />DEMOLITION $50.00 <br />STATE SURCHARGE IRC $6.50 <br />Total Fees $56.50 <br />Total Fees Paid $0.00 <br />Total Fees Due $56.50 <br />REMARKS: <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the <br />owner/applicant hereby agrees to the above listed permit <br />conditions and agrees to hold and save harmless the City <br />of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of <br />the construction hereto applied for and further agrees to <br />remove same upon notice from the City. <br />City of Everett Local <br />Sales Tax Code is3105. <br />PERMIT NO. <br />D2009-004 <br />ADDRESS FILE COPY <br />