Laserfiche WebLink
• <br />s <br />2020 System Development Fee Calculations <br />Permit #: PW2010-003 <br />Additional Notes: <br />Project Address: 3114 WAVE DR <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: NEW PATIO <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: THAD NEWPORT Date: 10/1/2020 <br />Outside City Limits? No <br />*Adds a 25% Surcharge <br />Supportive Housing Credit? No <br />*Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: BXXXX-XXX Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2010-003 Type of Construction: I Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />Stormwater System Dev Fee: <br />375 1 SF <br />$95.96 JAdd this fee to the Public Works Permit for hard surfaces on the ground. <br />