My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10105 1ST DR SE 2021-12-14
>
Address Records
>
1ST DR SE
>
10105
>
10105 1ST DR SE 2021-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 2:39:43 PM
Creation date
11/10/2021 9:32:01 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
10105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L J <br />2019 System Development Fee Calculations <br />Permit #: PW1912-039 <br />Additional Notes: <br />Project Address: 10103 1ST DR SE <br />Project Name: SITE WORK FOR NEW SFR <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared B . ` Date: 0 / <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*Subject to Administrative Guidelines Proposed Building Use: <br />SFR/Townhome Previous Bldg Use #1: SFR/Townhome Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposedUnit Measure: <br />1 Unit Unit Measure for Use #1: 1 Unit Unit Measure for Use #2: None <br />Unit Measure for Use #3: <br />None <br />Note: Meter Size Used for Proposed Meter Size: <br />Calculation Water Fee: <br />Sewer Fee: <br />1" dom/fire Credited Meter #1 Size: 3/4" Credited Meter #2 Size: None <br />$3,957.00 Water Credit #1: $3,957.00 Water Credit #2: $0.00 <br />$5,121.00 Sewer Credit #1: $5,121.00 Sewer Credit t - $0.00 <br />Credited Meter #3 Size: <br />Water Credit #3: <br />Sewer Credit #3: <br />None <br />$0.00 <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$o.00 <br />This fee reflects credit for existing water meter <br />Total: <br />$0.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />Nonel Credited Meter Size: None <br />Water Fee: <br />$0.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />Forinformational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: I'1'L- t239 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />4,945 SF <br />Stormwater System Dev Fee: <br />$1,229.82 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.