My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10105 1ST DR SE 2021-12-14
>
Address Records
>
1ST DR SE
>
10105
>
10105 1ST DR SE 2021-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 2:39:43 PM
Creation date
11/10/2021 9:32:01 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
10105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• AE CONSTRUCTION SFR <br />Minimum Requirement # 2: SWPPP Narrative <br />Element #1: Mark Clearing Limits <br />Clearing limits have been shown on the Temporary Erosion and Sedimentation Control <br />Plans. <br />Element #2: Establish Construction Entrance <br />It has been shown that the current driveway entrance will be used as a temporary <br />construction entrance. All vehicles shall be free of debris prior to leaving the site. <br />Element # 3: Control Flow Rates <br />Flow rates during construction are to be contained through the installation of silt fencing <br />along the eastern clearing limits. <br />Element # 4: Install Sediment Controls <br />Sediment controls mainly consist of installing silt fencing along the eastern clearing <br />limits. <br />Element # 5: Stabilize Soils <br />All soils disturbed during site grading will be stabilized by use of the most appropriate <br />BMP method available. These consist of short-term and long-term solutions. Short-term <br />methods consist of compaction of the soils by vibratory roller or bulldozer. Long-term <br />methods consist of straw covering over the soils (this is in the case of the project <br />becoming dormant for greater than 1 month). At this time no wintertime grading or <br />construction activities will occur. During construction periods longer than 1 working <br />week (7 days) where the soils are exposed and un-worked will use the proscribed <br />methods in the Storm Water Management Manual for Western Washington to reduce <br />sedimentation transported offsite. If winter grading is conducted, all exposed soils shall <br />be covered within 2 days. <br />Element # 6: Protect Slopes <br />No steep slopes exist on the proposed site; therefore, slope protection is not needed. <br />Element # 7: Protect Drain Inlets <br />No known downstream inlets exist in the immediate downstream vicinity; inlet protection <br />is not required. <br />Element # 8: Stabilize Channels and Outlets <br />The need for channel stabilization is not expected but, existing channels or drainage <br />outlets located within 500-feet of the property of the property should be routinely <br />inspected for debris that may dam and/or aid erosion. <br />WESTERN ENGINEERS, INC. 14 PROJECT: 19-1821-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.