Laserfiche WebLink
2020 System Development Fee Calculations <br />Permit #: B2010-025 <br />Additional Notes: <br />Project Address: 10225 1st Dr SE <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: SFR Modification <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: A. Huang Date: 12/23/2020 <br />Outside City Limits? INo <br />*Adds a 25% Surcharge <br />Supportive Housing Credit? INo <br />*Reduces by 80% <br />1 Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: B2010-025 Type of Construction: <br />Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />I SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2012-041 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: 210 SF <br />Stormwater System Dev Fee: $53. 44 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />