My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW PUD STORAGE 2021-12-28
>
Address Records
>
75TH ST SW
>
1122
>
PUD STORAGE
>
1122 75TH ST SW PUD STORAGE 2021-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 12:41:00 PM
Creation date
11/10/2021 10:59:43 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Tenant Name
PUD STORAGE
Notes
BLDG B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Washington State Energy`We Compliance Forms for Commercial, R2 and R3 over 3Akries and all R1 - Page 13 of 20 <br />Energy Recovery (ER) Systems - Service Water Heat nd Pool Systems <br />For buildings with pools or permanent spas with water surface area > 200 sf, indicate exhaust <br />C404.10.4 <br />(Section <br />Pools and permanent spas <br />air ER method and use of waste heat (preheat ventilation air, pool water or service hot water); <br />na <br />under <br />exhaust systems <br />or exception taken <br />_.. _ _._ _._.------- <br />_ __._..—..------ --- -- ---- --- — - <br />Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air <br />------- _ <br />C404.11) <br />(energy recovery) <br />temperature at design conditions by z 36°F <br />For buildings with food service, meat or deli departments that have z 500,000 Btu/h of remote <br />refrigeration capacity for coolers / freezers, indicate if condenser ER will be used to pre -heat <br />na <br />C403.5.3 <br />Energy recovery - <br />service water <br />For buildings with >_ 40,000 sf conditioned floor area and with ? 1,000,000 Btu/h of remote <br />cooler / freezer condensers <br />refrigeration capacity for coolers / freezers, indicate if condenser ER will be used to pre -heat <br />service water <br />For buildings with 24-hour operation and > 1,500,000 Btu/h of heat rejection capacity and <br />Energy recovery - <br />design SWH load > 250,000 Btu/h, indicate condenser ER to pre -heat service water; or <br />na <br />C403.5.4 <br />condenser systems <br />exception taken. Provide calculations showing the amount of recovered heat that is utilized <br />(60% of peak heat rejection load or pre -heat service water to 85°F). <br />na <br />C404.10 <br />Drain water heat recovery <br />For systems incorporating drain water ER, indicate system design complies with CSA B55.2 <br />units <br />(or CSA 55.1 for Group R); indicate potable waterside pressure loss at design flow is < 10 psi <br />Service Water Heating Energy Use Metering <br />na <br />C404.9 <br />SWH energy usage in <br />For Group R-2 multi -family buildings with central SWH systems, provide metering of hot water <br />dwelling units <br />energy usage per dwelling unit; indicate metering and data reporting method <br />SWH equipment energy use <br />For new buildings > 50,000 sf and building additions > 25,000 sf, with total SWH equipment <br />na <br />C409.3.2 <br />capacity >_ 50 kW ( >_ 170,600 Btulh), verfiy energy use metering of all SWH equipment will be <br />metering <br />provided per C409 <br />Additional Efficiency Package Option, Reduced Energy Use In Service Water Heating - Must comply with both provisions to be eligible <br />To comply with additional efficiency package option, verify that? 90% of the conditioned floor <br />na <br />C406.7.1 <br />Eligible building type <br />area of the building is one or more of the occupancies identified in this section, OR; <br />Provide whole building energy analysis per C407 that demonstrates the SWH load in the <br />building is z 10% of total building energy loads <br />To comply with additional efficiency package option, provide documentation that verifies <br />60% of building annual SWH energy is provided by high efficiency sources (heat pump water <br />heater with COP >_ 3, waste heat recovery, solar water -heating system); <br />na <br />C406.7.2 C403.5.4 <br />Load fraction <br />For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and <br />design service hot water load > 250,000 Btu/h (per C403.5.4); provide documentation that <br />verifies >_ 100% of building annual SWH energy is provided by condenser energy recovery or <br />other high efficiency source <br />Documentation and Specific System Requirements to Supporting Commissioning <br />Indicate that all SWH equipment and controls for which the WSEC requires control functions <br />Scope of service water <br />and / or configuration to perform specific functions are required to be commissioned;+D7 <br />C408.4 <br />heating systems <br />For buildings where the largest SWH system has ? 200,000 Btu/h total output capacity, <br />na <br />commissioning <br />indicate that all SWH systems regardless of individual capacity are required to be <br />commissioned. , <br />Indicate that all pool and permanent spa water heating systems regardless of individual <br />Scope of pool and <br />capacity are required to be commissioned; <br />Indicate that energy recovery equipment that heats pool water regardless of capacity is <br />C408.4.1.3 <br />permanent spa systems <br />required to be commissioned; <br />na <br />commissioning <br />Identify all pool heating and energy recovery equipment and controls that the WSEC defines <br />as being capable of and / or configured to perform specific functions. <br />Indicate in plans and specifications that Cx per C408 is required for all applicable service water <br />heating systems; <br />Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br />C404.13 <br />C408.1.1 <br />Commissioning <br />including: narrative description of activites, responsibilities of the Cx team, schedule of <br />na <br />C408.1.2 <br />requirements in construction <br />activities including verification of project close out documentation per C103.6, and conflict of <br />C408.1.4.2 <br />documents <br />interest plan (if required); <br />C103.6 <br />Include in general summary that a Cx project report or Compliance Checklist (Figure <br />C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner <br />prior to the final mechanical inspection. <br />C408.4.1 <br />Functional performance <br />Identify in plans and specifications the intended operation of all equipment and controls during <br />na <br />testing criteria <br />all modes of operation, including interfacing between new and existing -to -remain systems <br />Project Close Out Documentation <br />Documentation and project <br />Indicate in plans that project close out documentation and training of building operations <br />NA <br />C103.6 <br />dose out submittal <br />personnel is required for all SWH components, equipment and systems governed by this code; <br />requirements <br />indicate close out documentation shall include: record documents, O&M manuals, applicable <br />WSEC compliance forms and calculations <br />
The URL can be used to link to this page
Your browser does not support the video tag.