Laserfiche WebLink
• <br />• <br />2020 System Development Fee Calculations <br />Permit #: <br />PW2002-030 <br />Additional Notes: <br />Project Address: <br />16 76TH ST SW <br />Project Name: <br />AFH ADDITION AND PAVED DRIVEWAY ADDITION <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: <br />lEverett <br />Sewer District: <br />Everett <br />Prepared By: <br />Date: <br />Outside City Limits? <br />INo *Adds a 25% Surcharge <br />2 <br />Supportive Housing Credit? <br />No *Reduces by 80% <br />Reviewed By: <br />Date: (� <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: <br />Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*subject to administrative Guidelines <br />Proposed Building Use: SFR/Townhome Previous Bldg Use #1: <br />No Other Use Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposedUnit Measure: <br />1 Unit Unit Measure for Use #1: <br />None Unit Measure for Use #2: None <br />Unit Measure for Use #3: <br />None <br />Note: Meter Size Used for <br />Proposed Meter Size: <br />None Credited Meter #1 Size: <br />None Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Calculation <br />Water Fee: <br />$0.00 Water Credit #1: <br />$0.00 Water Credit #2: <br />Water Credit #3: <br />$0.00 <br />Sewer Fee: <br />$0.00 Sewer Credit #1: <br />$0.00 Sewer Credit #2: <br />Sewer Credit #3: <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />Permit #: U <br />Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Total: <br />$0.00 <br />Irrigation Meter: <br />Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />Nonel Credited Meter Size: <br />None <br />Water Fee: <br />$0.00 Water Credit: <br />$0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U <br />Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: <br />Proposed Meter Size: <br />None <br />For informational purposes only <br />Permit #: U <br />No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormw�r System Development Fees: <br />Permit #: �( 2007-'030 <br />Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New <br />Plus Replaced Hard Surfaces: <br />118 1 SF <br />Stormwater System Dev Fee: <br />$30.20 Add this fee to the Building Permit (o Public Works Per <br />here is no building permit for the project) <br />