My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
129 112TH ST SE CLEARWIRE ANTENNAS 2018-01-02 MF Import
>
Address Records
>
112TH ST SE
>
129
>
CLEARWIRE ANTENNAS
>
129 112TH ST SE CLEARWIRE ANTENNAS 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 11:27:02 AM
Creation date
11/10/2021 11:24:25 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
129
Tenant Name
CLEARWIRE ANTENNAS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P� � Providing qualif y�ti�afer Power end service nt n compefitivo pnce fhef our <br /> August 3, 2006 <br /> Mr. Eric Frederick <br /> Altair Communications Services, Inc. <br /> 10036 NE 130�h Lane, #1 <br /> Kirkland, WA 98034 <br /> RE: Site Name: Palabra, SNO 195 <br /> Location: 129 112�h Street SE, Everett WA 98208 <br /> Dear Eric: <br /> We have received the application submitted to Snohomish County PUD (District) <br /> concerning the proposed installation of a Wireles� Communication Facility (WCF� <br /> antenna system on an existing distribution/transmission line stiucture at 129 112" <br /> Street SE, Everett, WA 98208. It is understood that the primary usage of the structure <br /> shall remain as part of the District's electric system and the installation of the WCF <br /> equipment is a secondary function which may require modification to or replacement of <br /> the existing structure. <br /> The District will be responsible for developing the design loads for the structure and <br /> pertorming the design of the structure which includes all equipment mounted on the <br /> structure including the WCF equipment per the Washington Adminislrative Code 296- <br /> 46, the National Electric Safety Code (NESC) and electric utility standards and <br /> practices. The 2nalysis will use WCF antenna loads and design provided by Altair. <br /> Utility structures have long been exempt from the Uniform Building Code (UBC) under <br /> section 101.3 of the 1997 code and the change to the International Building Code (IBC) <br /> has not eliminated that exemption. Public utility structures are specifically exempt from <br /> the provision of lhe IBC and as such design calculations are not required to be provided <br /> to the permitting agency. District construction personnel or other designated qualified <br /> electrical workers will be responsible for any work on the structure in and above the <br /> electric supply space which involves work such as electric lines, equipment <br /> modifications, installation of a new pole and/or installation or mainlenance of antennas <br /> and cable. The new or modified structure shall continue to be under the ow�ership of <br /> tlie District. <br /> If you have any questions, please contact me at (425) 783-560G. <br /> Sincerely, <br /> ; <br /> � <br /> Doug Haberman <br /> Designer, Wireless Antenna Facilities <br /> 2320 Caldornla Slreel• Everett. W�•98207 /Madi�iy�dd�ass. P.O. Boz 1107.Everett.WA.9820G-1107 <br /> 425-7f13-10�0•Toll-free in Western Washington at 1-877�783-10D0.www.snopud.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.