Laserfiche WebLink
3/15/2021 City of Everett Page 1 ) 2 <br /> 2:35:00P1VI <br /> • INSPECTION ACTIVITY REPORT <br /> Permit No. CW1906-002 Site Address 3921 FRIDAY AVE <br /> Applied 6/27/2019 Applicant BECK ANTHONY Lot <br /> Approved 7/22/2019 Owner SWIFT HOME INVESTMENTS LLC Block <br /> Issued 7/23/2019 Contractor BECK CONSTRUCTION Tract <br /> Parent Permit No. W1904-001 Description UPDATE SURFACES,FIXTURES,BRING INTO COMPLIANCE <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 9/11/2019 9/11/2019 PLUMB SDP CORRECTION (9/12/2019 8:43 AM SDP) <br /> 01-CONSULTATIO 1)All plumbing must meet with current <br /> codes. <br /> Exceptions:pipe sizing will be concidered <br /> due to the age of the house and the existing <br /> plumbing of that time.Must be approved by <br /> the inspector on site. <br /> 2)Ok to use an air admittance valve on the <br /> washer and one on the sink downstairs. <br /> 3)obtain a permit for the mechanical work: <br /> stove exhaust,dryer,whole house fan, <br /> laundry exhaust. <br /> 4)inspector could not see any vents through <br /> the roof,please have safe access to the attic <br /> for inspection. <br /> 5)It appears that a backwater valve is <br /> required on this house.see UPC 710.1 <br /> 6)Open all walls where there is plumbing <br /> work and leave open for inspection. <br /> Plumbing,mechanical and electrical <br /> approvals and a framing inspection will be <br /> required before any drywall cover. <br /> 9/27/2019 9/27/2019 BLDG BDGI CORRECTION see notes (9/27/2019 7:50 AM KMK) <br /> 08-FRAMING Obtain approvals of plumbing and electrical <br /> rough-ins before calling for framing <br /> inspection. <br /> 9/30/2019 9/30/2019 PLUMB 06-FINAL SDP PARTIAL APPR (9/30/2019 3:15 PM SDP) <br /> Plumbing final ok except a backwater valve <br /> is required by code.Contact the building <br /> offical for an exception due to pre-existing <br /> conditions. Ok to cover work performed <br /> inside the house. <br /> 9/30/2019 9/30/2019 MECH 06-FINAL SDP APPROVAL (9/30/2019 3:17 PM SDP) <br /> OK final for the stove exhaust(insulate to <br /> R-4 min.),dryer exhaust,bath exhaust.' <br /> 10/1/2019 10/1/2019 BLDG DWF PARTIALAPPR (10/1/2019 1:14 PM DWF) <br /> 08-FRAMING Interion framing,ok to cover. <br /> Exterior stairways need to have handrailing <br /> returns top and bottom. <br /> Side patio,stairway landing at grade needs <br /> to extend 36"minumum and width of <br /> stairway. <br /> Need to post a site address as per IRC 319.1 <br /> 10/3/2019 10/3/2019 PLUMB 06-FINAL SDP CORRECTION site visit with public (10/8/2019 8:00 AM SDP) <br /> works Backwater valve will be required on the <br /> complete house as both floors are below the <br /> street level.See email in attachments. <br /> 10/3/2019 10/3/2019 PW 22-OTHER RDA CORRECTION (10/3/2019 2:24 PM RDA) <br /> Needs backwater valve on side sewer <br /> 10/24/2019 10/24/2019 UTIL 13-OTHER RDA OTHER see plumbing notes <br /> INSP12 C SYSTEMS <br />