Laserfiche WebLink
4 OT 115 <br /> • <br /> Monday, July 27, 20200 „r <br /> _ FOUNDATION st a r <br /> Crew will install Posts on existing footings, and lift home to maximum practical recovery. Homeowner will remove existing <br /> foundation where we are pouring the new foundation and porch, crew will pour new foundation. Crew will remove existing CMU. <br /> L120 recommends that the existing residence be lifted to maximum practical recovery,existing cmu footing be removed and a new <br /> 8"stemwall with 1'-4"wide footing to be poured along the rear exterior wall of the residence and around the proposed porch area. <br /> NOTES: <br /> 1. A 1500 psf bearing capacity has been anticipated at the existing soil. <br /> 2. Soil to be excavated/backfilled with structural fill and compacted to 90%as required per existing soil conditions. <br /> 3. New stemwall and footing to be in accordance with details SSK-01 and SSK-02. <br /> :2(J� Nevi+ , 1 <br /> x. 4x4 ' <br /> Accest i , L <br /> a-- - --- -- <br /> b 1...3/, i ''' NEW$"wIDE.7EIMwALL:AND <br /> 1'-4"FOOTING TO BE POURED <br /> AT EXISTING E ERIOR WALL <br /> ' AND EXTERIOI (1- <br /> ORCH DECK. <br /> i <br /> I z <br /> Gas_ <br /> .___+??. <br /> re <br /> II <br /> -1,3/4 . <br /> _ _ z <br /> 1/2 <br /> -13/a I <br /> -1 314. ' -2 /4 , <br /> -1 1/2 <br /> g <br /> i <br /> �_ �... 61 l _ I <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> exterior decks and deck supporting elements are outside of L120's contract and scope and are not addressed in this package. -L120 <br />