Laserfiche WebLink
PUBLIIIJUORKS PERMIT Date Applied: 12/14/2020 <br /> City of Everett Permit Services Public orks Permit#: PW2012-025 <br /> EVERETT 3200 Cedar Street, 2nd0 Floor Associated Bldg Permit#: E2011-165 <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $65.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> N W TELCO CREDIT UNION NEWLAND CONSTRUCTION <br /> 2821 Hewitt Ave 3300 CHESTNUT ST <br /> Everett,WA,98201 EVERETT,WA,98201 <br /> PHONE:4252971000 PHONE:4252599191 <br /> TAX PARCEL ID#:00593665600101 SITE ADDRESS HEWITT AVE '2 I <br /> DESCRIPTION: Install of new 120 gallon propane tank for backup generator <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 04/19/2021.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon completion of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 10. Install bollard or other vehicle protection around propane tank. <br /> 11. Prior to any interruption to the public right-of-way(roadways, parking lanes,or sidewalks)a Traffic Street Use permit shall be <br /> obtained from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of <br /> application. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items <br /> have been completed. - ^ � n n <br /> UPublic Works Permit Fee Breakdown: `e?�J <br /> Misc. Minor Permits(Propane Tank protection) $25.00 <br /> PW Plan Review $20.00 MAY 13 2021 <br /> PW Site Inspection $20.00 <br /> CITY OF C��Qr,EVERETT <br /> City of Everett Official Use Only ACKNOWLEDR�IE vFOC�IYA`iNS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> 0 4 tee, zee./ agrees to remove same upon notice from the City and to replace <br /> Approved for Construction,Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />