My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2118 LAKE HEIGHTS DR 2021-11-15
>
Address Records
>
LAKE HEIGHTS DR
>
2118
>
2118 LAKE HEIGHTS DR 2021-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 9:16:47 AM
Creation date
11/15/2021 9:16:42 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2118
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/24/2021 Page <br /> City of Everett <br /> 7:25:26AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2103-010 Site Address 2118 LAKE HEIGHTS DR <br /> Applied 3/2/2021 Applicant WASHINGTON ENERGY(ELEC)SVCS CO LLC Lot <br /> Approved 3/2/2021 Owner HAMES KATHY Block <br /> Issued 8/23/2021 Contractor WASHINGTON ENERGY(ELEC)SVCS CO LLC Tract <br /> Parent Permit No. M2103-009 Description ADD CIRCUIT FOR GENERATOR INSTALLATION <br /> Notes 8/23/2021 1:38 PM CRB) <br /> ADDED SCOPE: We need to add a 200 Amp panel for permit E2103-010 <br /> NEED ONE CIRCUIT FOR GENERATOR INSTALLATION <br /> (6/10/2021 8:11 AM CRB) <br /> This is a whole house generator with 200 amp smart switch so we will be altering the service feeder. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 7/9/2021 7/9/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 8/23/2021 8/23/2021 ELEC 05-SERVICE SKB APPROVAL eTRAKiT Inspection 8/19/2021 3:08 PM WASHINGTON <br /> Request ENERGY(ELEC)SVCS CO LLC <br /> POWER DISCONNECT IN AM.NEED <br /> PM INSPECTION FOR RECONNECT. <br /> ONSITE ELECTRICIAN IS DAN AT <br /> 206-665-6766 <br /> Contact Name:WASHINGTON ENERGY <br /> (ELEC)SVCS CO LLC <br /> Site Address:2118 LAKE HEIGHTS DR <br /> Phone:2062824700 <br /> e-Mail: <br /> ELECoordinators@washingtonenergy.com <br /> 8/23/2021 8/23/2021 ELEC 02-GROUND SKB APPROVAL (8/23/2021 11:58 AM SKB) <br /> WORK House to generator pad. <br /> 8/23/2021 8/23/2021 ELEC 09-FINAL SKB APPRVD-PERiv as noted (8/23/2021 2:02 PM SKB) <br /> OK 200 amp ATS and automatic generator. <br /> INSP12 <br /> SYSTENtS <br />
The URL can be used to link to this page
Your browser does not support the video tag.