Laserfiche WebLink
Adapt Engineering <br /> Table 4 <br /> Recommended Horizontal Subgrade Reaction Values <br /> Depth Interval nh kv <br /> (feet) (pci) (pci) <br /> 0-2 0 N/A <br /> 2-6 3 N/A <br /> 6- 15 10 N/A <br /> 15 -30 25 N/A <br /> 30-41.5 40 N/A <br /> Coefficient of Horizontal kh=nn(z/B) kh=kv1(1.5B) <br /> Subgrade Reaction(pci) (Sand&Soft Clay) (Stiff Clay) <br /> Construction Considerations: Our exploration revealed the near surface soil conditions consist of roughly <br /> 12 inches of sandy topsoil with silt and gravel mantling very loose,poorly graded sand with wood debris <br /> (interpreted to be possible fill). At approximately 5 feet bgs, the test boring encountered a loose, relic <br /> topsoil layer that was approximately 8 inches thick mantling native, medium stiff, sandy silt. The sandy <br /> silt graded into medium dense, poorly graded sand with silt and gravel. At an approximate depth of 15 <br /> feet bgs, the test boring encountered dense to very dense,poorly graded sand. Hard silt was encountered <br /> at approximately 30 feet bgs,which then extended to the full exploration depth of 41.5 feet bgs. <br /> The presence of cobbles was not indicated during the advancement of our test boring;however gravel was <br /> noted in the site soils and the drilled pier contractor should anticipate the possibility of difficult drilling <br /> conditions and presence of large particles commonly encountered in glacially derived soil deposits. <br /> It should be noted that heaving conditions were encountered at an approximate depth of 25 feet bgs, <br /> which may have influenced blow counts and the retrieved sample. <br /> Perched groundwater was encountered at approximately 8 feet bgs which appeared to extend to an <br /> approximate depth of 30 feet bgs. It should be noted that throughout the year, groundwater levels will <br /> likely fluctuate in response to changing precipitation patterns,off-site construction activities,and changes <br /> in site utilization. <br /> Dewatering may be required depending on the actual depth and time of year of drilled pier construction. <br /> The foundation-drilling contractor should be prepared to case the excavation to prevent caving and <br /> raveling of the pier shaft sidewall, if necessary due to unexpected soil or excessive groundwater seepage <br /> conditions. Should heavy groundwater inflow be encountered in the drilled pier excavation, it may be <br /> necessary to pump out the accumulated groundwater prior to concrete placement, or to use a tremie tube <br /> to place the concrete from the bottom of the drilled pier excavation, thereby displacing the accumulated <br /> water during concrete placement. Alternatively, the use of bentonite slurry could be utilized to stabilize <br /> the drilled pier excavation. <br /> AT&T Mobility do General Dynamics October 10,2016 <br /> Adapt Project No.WA16-20654-GEO ---- --- _;_--------------- <br /> � e2io <br />