Laserfiche WebLink
\ CiC —L' tiff ill'✓vl�;'GC�� <br /> Jenny Chang <br /> From: Bowles,Ally <AJBowles@Snopud.com> <br /> Sent: Monday,October 18,2021 1:00 PM <br /> To: Jenny Chang <br /> Subject: [EXTERNAL] PUD Contract 3702 Tulalip Ave <br /> Attachments: CS CONTRACT.pdf <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you <br /> recognize the sender and know the content is safe. <br /> Hello, <br /> I just took over this area from the previous engineer and you are the first contact I could find,so I am hoping that you <br /> can help me with fixing a document or getting this to the right people..The initial contract that was signed was listed as <br /> the full$25,371 amount of the work order, however,the inspection and amperage fees were included in that total.The <br /> contract amount is supposed to match the amount on our quote not including those costs so we have a discrepancy.We <br /> are asking that this new contract(for the lesser amount of$24,407) be signed so we can fix that in our system.This does <br /> not effect your project or payments, it is just for correct documentation and processing of the work order. <br /> Any help is appreciated. <br /> Thank you, <br /> Ally Bowles <br /> Assistant Designer-Everett Engineering <br /> 425.231.7266 <br /> Snohomish County PUD No. 1 <br /> [ Sr si6n1 Ft COil14 <br /> _ r f <br /> `-.PfliltIC UT11.1TY DISTRICT NO.'1 <br /> 1 <br />