My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
John R. Harrison 11/5/2021 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2022
>
John R. Harrison 11/5/2021 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2021 2:36:00 PM
Creation date
11/19/2021 2:35:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
John R. Harrison
Approval Date
11/5/2021
Council Approval Date
11/3/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Trickling Media Filter Replacement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002136
Total Compensation
$51,350.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
John R Harrison 12/20/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> Assistance with <br /> Restoration of the Trickling Filter Number 1 <br /> at the <br /> City of Everett Water Pollution Control Facility <br /> The following scope of work is proposed by the John R. Harrison (CONSULTANT) in support of The City of <br /> Everett(CITY). The CITY will be primarily responsible for designing and specifying items necessary to <br /> restore one of the existing trickling filters(TFs)at the CITY's Water Pollution Control Facility(WPCPF)to <br /> almost new and useful service. In assisting the CITY,the CONSULTANT will perform the following Tasks. <br /> 1) Project Management Activities. <br /> CONSULTANT will actively participate in relevant project meetings either by conference call or other <br /> audio/visual means. CONSULTANT will provide services to CITY as part of a Project Team which may <br /> include other Consultants and/or CITY Environmental or Engineering professionals. <br /> Deliverables:Advice and Project notes or correspondence. <br /> 2) Advice and Assistance During Construction. <br /> CONSULTANT will assist the CITY in addressing questions during construction.Submittals relevant to <br /> the TF will be reviewed Requested changes to the CITY's media specification or changes to TF <br /> related equipment will be considered and recommendations will be given by the CONSULTANT. <br /> Deliverables: Evaluation of requested changes,submittals and written recommendations to the <br /> CITY. <br /> 3) Observational Advice or Training During the Project. <br /> CONSULTANT will assist the CITY in evaluating operation changes that may be required through the <br /> duration of the Project. If desired the CONSULTANT will provide training or advise operational <br /> changes that may be necessary to have a successful Project, <br /> Deliverables: If requested by the CITY,advice and/or training on changes in plant operation. <br /> Note:The project scope is focused only on equipment and facility repairs on the trickling filter,filter media,filter media support <br /> system and trickling filter associated parts. Excluded from the scope of services are process and operational assistance <br /> (including startup or operational guidance. <br /> ' 1 1 September 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.